| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BESSETTE DEVELOPMENT CORP. |
- 2 - R. E. HEIDT CONSTRUCTION CO., INC. |
- 3 - PRAIRIE CONTRACTORS INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-G |
removal of surfacing & stabilized base
|
25.7 |
SQYD |
8.00 |
205.60 |
24.40 |
627.08 |
25.00 |
642.50 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
5,362   |
CUYD |
15.25 |
81,770.50 |
29.65 |
158,983.30 |
15.50 |
83,111.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
53,137.9 |
TON |
51.00 |
2,710,032.90 |
53.35 |
2,834,906.96 |
56.00 |
2,975,722.40 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
miscellaneous |
711.0 |
TON |
58.25 |
41,415.75 |
84.00 |
59,724.00 |
70.00 |
49,770.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
243,769   |
SQYD |
0.46 |
112,133.74 |
0.68 |
165,762.92 |
1.20 |
292,522.80 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 6,842   |
CUYD |
1.00 |
- 6,842.00 |
1.00 |
- 6,842.00 |
0.01 |
- 68.42 |
|
|
| 701-01-G |
cross drain pipe (18" rcp)
|
60   |
LNFT |
197.00 |
11,820.00 |
200.00 |
12,000.00 |
200.00 |
12,000.00 |
|
|
| 710-01 |
flowable fill
|
94   |
CUYD |
68.50 |
6,439.00 |
69.00 |
6,486.00 |
70.00 |
6,580.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
17,500.00 |
17,500.00 |
11,000.00 |
11,000.00 |
50,000.00 |
50,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
48.840 |
MILE |
335.00 |
16,361.40 |
175.00 |
8,547.00 |
250.00 |
12,210.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
47.085 |
MILE |
265.00 |
12,477.52 |
265.00 |
12,477.52 |
1.00 |
47.08 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
104.871 |
MILE |
526.50 |
55,214.58 |
200.00 |
20,974.20 |
1.00 |
104.87 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
360   |
SQYD |
68.50 |
24,660.00 |
67.00 |
24,120.00 |
75.00 |
27,000.00 |
|
|
| 724-02 |
pavement widening
|
831.0 |
SQYD |
105.50 |
87,670.50 |
58.00 |
48,198.00 |
62.00 |
51,522.00 |
|
|
| 726-01 |
bedding material
|
5.0 |
CUYD |
130.00 |
650.00 |
96.00 |
480.00 |
90.00 |
450.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
55,500.00 |
55,500.00 |
61,000.00 |
61,000.00 |
50,000.00 |
50,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
5   |
EACH |
55.00 |
275.00 |
64.00 |
320.00 |
50.00 |
250.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
70.00 |
560.00 |
80.00 |
640.00 |
65.00 |
520.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,146   |
EACH |
4.75 |
10,193.50 |
4.80 |
10,300.80 |
4.50 |
9,657.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
34.951 |
MILE |
2,055.00 |
71,824.30 |
2,100.00 |
73,397.10 |
2,000.00 |
69,902.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
15.695 |
MILE |
740.00 |
11,614.30 |
745.00 |
11,692.77 |
700.00 |
10,986.50 |
|
|
| 735-01 |
mailboxes
|
69   |
EACH |
1.50 |
103.50 |
1.10 |
75.90 |
1.00 |
69.00 |
|
|
| 735-02 |
mailbox supports (single)
|
67   |
EACH |
145.00 |
9,715.00 |
127.00 |
8,509.00 |
120.00 |
8,040.00 |
|
|
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
290.00 |
580.00 |
180.00 |
360.00 |
170.00 |
340.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
16,500.00 |
16,500.00 |
9,500.00 |
9,500.00 |
1,000.00 |
1,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
38,500.00 |
38,500.00 |
10,000.00 |
10,000.00 |
1,000.00 |
1,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,386,875.09 |
|
3,543,240.55 |
|
3,713,378.73 |
|
|
|