February 06, 2014 Error processing SSI file

Letting of 12/14/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 193-04-0010
Parish: CALCASIEU
Routes: LA 27, LA 14
Description: RT LA 397 - RT LA 14; RT LA 27 - RT LA 397;RT LA 27 - SPT RR
Type Const: grading, drainage structures, cold planing asphaltic pavement, pavement patching,
pavement widening, superpave asphaltic concrete overlay, and related work.
 
RankLicenseBidderAmount
114096 BESSETTE DEVELOPMENT CORP. $3,386,875.09
200183 R. E. HEIDT CONSTRUCTION CO., INC. $3,543,240.55
334356 PRAIRIE CONTRACTORS INC. $3,713,378.73
 
Item Number Item Description Quantity Unit of Measure - 1 -
BESSETTE DEVELOPMENT CORP.
- 2 -
R. E. HEIDT CONSTRUCTION CO., INC.
- 3 -
PRAIRIE CONTRACTORS INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-G removal of surfacing & stabilized base 25.7    SQYD 8.00 205.60 24.40 627.08 25.00 642.50    
401-02 aggregate surface course (adjusted vehicular
measurement)
5,362      CUYD 15.25 81,770.50 29.65 158,983.30 15.50 83,111.00    
502-01 superpave asphaltic concrete 53,137.9    TON 51.00 2,710,032.90 53.35 2,834,906.96 56.00 2,975,722.40    
502-01-A superpave asphaltic concrete, drives, turnouts, and
miscellaneous
711.0    TON 58.25 41,415.75 84.00 59,724.00 70.00 49,770.00    
509-01 cold planing asphaltic pavement 243,769      SQYD 0.46 112,133.74 0.68 165,762.92 1.20 292,522.80    
509-02 contractor retained reclaimed asphaltic pavement - 6,842      CUYD 1.00 - 6,842.00 1.00 - 6,842.00 0.01 - 68.42    
701-01-G cross drain pipe (18" rcp) 60      LNFT 197.00 11,820.00 200.00 12,000.00 200.00 12,000.00    
710-01 flowable fill 94      CUYD 68.50 6,439.00 69.00 6,486.00 70.00 6,580.00    
713-01 temporary signs & barricades lump      LUMP 17,500.00 17,500.00 11,000.00 11,000.00 50,000.00 50,000.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
48.840  MILE 335.00 16,361.40 175.00 8,547.00 250.00 12,210.00    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
47.085  MILE 265.00 12,477.52 265.00 12,477.52 1.00 47.08    
713-05-A temporary pavement markings (solid line)(4" width) 104.871  MILE 526.50 55,214.58 200.00 20,974.20 1.00 104.87    
724-01-B pavement patching (12" minimum thickness) 360      SQYD 68.50 24,660.00 67.00 24,120.00 75.00 27,000.00    
724-02 pavement widening 831.0    SQYD 105.50 87,670.50 58.00 48,198.00 62.00 51,522.00    
726-01 bedding material 5.0    CUYD 130.00 650.00 96.00 480.00 90.00 450.00    
727-01 mobilization lump      LUMP 55,500.00 55,500.00 61,000.00 61,000.00 50,000.00 50,000.00    
729-16-B object marker assembly (type 2) 5      EACH 55.00 275.00 64.00 320.00 50.00 250.00    
729-16-C object marker assembly (type 3) 8      EACH 70.00 560.00 80.00 640.00 65.00 520.00    
731-02 reflectorized raised pavement markers 2,146      EACH 4.75 10,193.50 4.80 10,300.80 4.50 9,657.00    
732-02-A plastic pavement striping (solid line) (4" width) 34.951  MILE 2,055.00 71,824.30 2,100.00 73,397.10 2,000.00 69,902.00    
732-03-A plastic pavement striping (broken line)(4" width) 15.695  MILE 740.00 11,614.30 745.00 11,692.77 700.00 10,986.50    
735-01 mailboxes 69      EACH 1.50 103.50 1.10 75.90 1.00 69.00    
735-02 mailbox supports (single) 67      EACH 145.00 9,715.00 127.00 8,509.00 120.00 8,040.00    
735-03 mailbox supports (double) 2      EACH 290.00 580.00 180.00 360.00 170.00 340.00    
740-01 construction layout lump      LUMP 16,500.00 16,500.00 9,500.00 9,500.00 1,000.00 1,000.00    
744-01 traffic control management lump      LUMP 38,500.00 38,500.00 10,000.00 10,000.00 1,000.00 1,000.00    
                       
 CONTRACTOR TOTAL       3,386,875.09   3,543,240.55   3,713,378.73    