| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 2 - BARBER BROS. CONTRACTING CO., L.L.C |
- 3 - COASTAL BRIDGE CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
358   |
SQYD |
15.00 |
5,370.00 |
25.00 |
8,950.00 |
20.00 |
7,160.00 |
|
|
| 202-02-E |
removal of concrete curbs
|
70.0 |
LNFT |
10.00 |
700.00 |
12.00 |
840.00 |
30.00 |
2,100.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
435.6 |
SQYD |
10.00 |
4,356.00 |
10.00 |
4,356.00 |
20.00 |
8,712.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
1,895   |
CUYD |
20.00 |
37,900.00 |
20.00 |
37,900.00 |
15.00 |
28,425.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
70   |
EACH |
85.00 |
5,950.00 |
120.00 |
8,400.00 |
80.00 |
5,600.00 |
|
|
| 204-06 |
temporary silt fencing
|
44,092   |
LNFT |
1.20 |
52,910.40 |
1.30 |
57,319.60 |
0.01 |
440.92 |
|
|
| 302-02-F |
class ii base course (12" thick) (stone or recycled
portland cement concrete only) |
630.9 |
SQYD |
25.00 |
15,772.50 |
36.00 |
22,712.40 |
50.00 |
31,545.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
19,865.1 |
TON |
50.00 |
993,255.00 |
50.00 |
993,255.00 |
58.00 |
1,152,175.80 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives, turnouts
and miscellaneous |
2,198.4 |
TON |
50.00 |
109,920.00 |
75.00 |
164,880.00 |
75.00 |
164,880.00 |
|
|
| 509-01-A |
cold planing asphaltic pavement (1.5" thick)
|
27,759   |
SQYD |
1.50 |
41,638.50 |
2.00 |
55,518.00 |
1.75 |
48,578.25 |
|
|
| 509-01-B |
cold planing asphaltic pavement (2" thick)
|
95,419   |
SQYD |
1.50 |
143,128.50 |
2.00 |
190,838.00 |
2.50 |
238,547.50 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,230   |
CUYD |
0.01 |
- 32.30 |
FREE |
FREE |
10.00 |
- 32,300.00 |
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
19,275   |
LNFT |
1.00 |
19,275.00 |
1.50 |
28,912.50 |
1.00 |
19,275.00 |
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
10,087   |
LNFT |
1.25 |
12,608.75 |
2.00 |
20,174.00 |
1.25 |
12,608.75 |
|
|
| 602-03 |
cleaning and sealing random cracks
|
14,681   |
LNFT |
2.50 |
36,702.50 |
4.00 |
58,724.00 |
2.50 |
36,702.50 |
|
|
| 602-05-I-01 |
full depth patching of jointed conc pvmt (9" thick)
(16.0 sq yds & under) |
184.0 |
SQYD |
130.00 |
23,920.00 |
150.00 |
27,600.00 |
120.00 |
22,080.00 |
|
|
| 602-05-I-02 |
full depth patching of jointed conc pvmt (9" thick)
(16.1 - 48.0 sq yds) |
740.0 |
SQYD |
120.00 |
88,800.00 |
140.00 |
103,600.00 |
110.00 |
81,400.00 |
|
|
| 602-05-I-03 |
full depth patching of jointed conc pvmt (9" thick)
(48.1 sq yds & over) |
380.0 |
SQYD |
100.00 |
38,000.00 |
125.00 |
47,500.00 |
90.00 |
34,200.00 |
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
216   |
LNFT |
90.00 |
19,440.00 |
75.00 |
16,200.00 |
65.00 |
14,040.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
3   |
EACH |
2,800.00 |
8,400.00 |
3,000.00 |
9,000.00 |
3,500.00 |
10,500.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
168.8 |
LNFT |
48.00 |
8,102.40 |
75.00 |
12,660.00 |
65.00 |
10,972.00 |
|
|
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
16.00 |
800.00 |
60.00 |
3,000.00 |
50.00 |
2,500.00 |
|
|
| 704-05 |
guard rail anchor sections (bct)
|
6.3 |
LNFT |
70.00 |
441.00 |
80.00 |
504.00 |
65.00 |
409.50 |
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
2   |
EACH |
2,200.00 |
4,400.00 |
2,600.00 |
5,200.00 |
2,250.00 |
4,500.00 |
|
|
| 707-01 |
concrete curb
|
60.0 |
LNFT |
35.00 |
2,100.00 |
50.00 |
3,000.00 |
35.00 |
2,100.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
125,000.00 |
125,000.00 |
50,000.00 |
50,000.00 |
15,000.00 |
15,000.00 |
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
1,720   |
LNFT |
0.20 |
344.00 |
0.50 |
860.00 |
0.42 |
722.40 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
828   |
LNFT |
0.70 |
579.60 |
2.00 |
1,656.00 |
1.36 |
1,126.08 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
12.776 |
MILE |
500.00 |
6,388.00 |
1,000.00 |
12,776.00 |
300.00 |
3,832.80 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
12.776 |
MILE |
100.00 |
1,277.60 |
375.00 |
4,791.00 |
316.00 |
4,037.21 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
20.753 |
MILE |
10.00 |
207.53 |
750.00 |
15,564.75 |
633.00 |
13,136.64 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
46   |
EACH |
25.00 |
1,150.00 |
60.00 |
2,760.00 |
45.00 |
2,070.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
23   |
EACH |
25.00 |
575.00 |
80.00 |
1,840.00 |
50.00 |
1,150.00 |
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
100   |
SQYD |
37.00 |
3,700.00 |
50.00 |
5,000.00 |
35.00 |
3,500.00 |
|
|
| 724-01-C |
pavement patching (20" minimum thickness)
|
720   |
SQYD |
120.00 |
86,400.00 |
90.00 |
64,800.00 |
75.00 |
54,000.00 |
|
|
| 726-01 |
bedding material
|
16.5 |
CUYD |
FREE |
FREE |
60.00 |
990.00 |
100.00 |
1,650.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
125,000.00 |
125,000.00 |
35,000.00 |
35,000.00 |
225,000.00 |
225,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
10   |
EACH |
68.00 |
680.00 |
65.00 |
650.00 |
55.00 |
550.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
12   |
EACH |
88.00 |
1,056.00 |
80.00 |
960.00 |
70.00 |
840.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,009   |
EACH |
6.00 |
6,054.00 |
6.00 |
6,054.00 |
5.10 |
5,145.90 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
943   |
LNFT |
1.50 |
1,414.50 |
1.20 |
1,131.60 |
1.00 |
943.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
276   |
LNFT |
3.50 |
966.00 |
3.50 |
966.00 |
2.70 |
745.20 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
14.302 |
MILE |
2,200.00 |
31,464.40 |
2,500.00 |
35,755.00 |
2,150.00 |
30,749.30 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.613 |
MILE |
750.00 |
4,209.75 |
700.00 |
3,929.10 |
625.00 |
3,508.12 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
24   |
EACH |
150.00 |
3,600.00 |
160.00 |
3,840.00 |
135.00 |
3,240.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
12   |
EACH |
150.00 |
1,800.00 |
180.00 |
2,160.00 |
145.00 |
1,740.00 |
|
|
| 732-05 |
removal of existing markings
|
0.456 |
MILE |
6,000.00 |
2,736.00 |
6,000.00 |
2,736.00 |
5,600.00 |
2,553.60 |
|
|
| 735-01 |
mailboxes
|
120   |
EACH |
1.00 |
120.00 |
6.00 |
720.00 |
5.00 |
600.00 |
|
|
| 735-02 |
mailbox supports (single)
|
104   |
EACH |
135.00 |
14,040.00 |
140.00 |
14,560.00 |
125.00 |
13,000.00 |
|
|
| 735-03 |
mailbox supports (double)
|
3   |
EACH |
195.00 |
585.00 |
180.00 |
540.00 |
180.00 |
540.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
3   |
EACH |
265.00 |
795.00 |
240.00 |
720.00 |
300.00 |
900.00 |
|
|
| 736-09 |
loop detector
|
400   |
LNFT |
14.00 |
5,600.00 |
16.00 |
6,400.00 |
11.00 |
4,400.00 |
|
|
| 736-10 |
underground junction box
|
4   |
EACH |
500.00 |
2,000.00 |
600.00 |
2,400.00 |
250.00 |
1,000.00 |
|
|
| 736-11-B |
conduit (1" pec, schedule 80)
|
1,888   |
LNFT |
1.60 |
3,020.80 |
1.50 |
2,832.00 |
4.00 |
7,552.00 |
|
|
| 736-12-A |
conductor, 2c (loop lead-in, #14 awg)
|
2,463   |
LNFT |
0.35 |
862.05 |
0.50 |
1,231.50 |
1.50 |
3,694.50 |
|
|
| 739-01 |
hydro-seeding
|
6.35 |
ACRE |
900.00 |
5,715.00 |
1,500.00 |
9,525.00 |
1,500.00 |
9,525.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
67,000.00 |
67,000.00 |
60,000.00 |
60,000.00 |
15,000.00 |
15,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
50,000.00 |
50,000.00 |
30,000.00 |
30,000.00 |
15,000.00 |
15,000.00 |
|
|
| S-001 |
roadway reinforcing mesh (complete road system)
|
57,621   |
SQYD |
6.75 |
388,941.75 |
6.50 |
374,536.50 |
6.50 |
374,536.50 |
|
|
| S-002 |
rumble strips (ground-in)
|
10.5 |
MILE |
800.00 |
8,400.00 |
1,200.00 |
12,600.00 |
1,200.00 |
12,600.00 |
|
|
| S-006 |
loop detector conduit installation
|
1,888   |
LNFT |
3.00 |
5,664.00 |
3.00 |
5,664.00 |
4.00 |
7,552.00 |
|
|
| S-007 |
loop detector lead-in installation
|
2,499.0 |
LNFT |
1.00 |
2,499.00 |
1.50 |
3,748.50 |
1.50 |
3,748.50 |
|
|
| S-008 |
special anchor section
|
1   |
EACH |
1,100.00 |
1,100.00 |
1,000.00 |
1,000.00 |
850.00 |
850.00 |
|
|
| S-009 |
cleaning existing ditches
|
3,000   |
LNFT |
4.00 |
12,000.00 |
12.00 |
36,000.00 |
5.00 |
15,000.00 |
|
|
| S-922 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
9,670   |
LNFT |
1.00 |
9,670.00 |
1.50 |
14,505.00 |
1.00 |
9,670.00 |
|
|
| S-923 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
5,802   |
LNFT |
1.10 |
6,382.20 |
2.00 |
11,604.00 |
1.10 |
6,382.20 |
|
|
| S-927 |
sawcuts in asphaltic concrete lifts
|
15,472   |
LNFT |
0.70 |
10,830.40 |
1.00 |
15,472.00 |
0.65 |
10,056.80 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,673,685.83 |
|
2,739,321.45 |
|
2,793,999.97 |
|
|
|