Letting of 12/14/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 053-03-0036
Parish: NATCHITOCHES
Routes: LA 1
Description: N. JCT. LA 490 - S. JCT. LA 119
Type Const: grading,drain struct,cold planing asph pavement,asphaltic surface trmt,superpave
asph conc ovly,pavement patching, and related work.
 
RankLicenseBidderAmount
112312 GILCHRIST CONSTRUCTION CO. LLC $1,570,465.95
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,600,356.96
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 2,000.00 2,000.00 10,000.00 10,000.00        
202-02-H removal of guard rail 496      LNFT 5.00 2,480.00 4.00 1,984.00        
203-08 borrow (vehicular measurement) 70      CUYD 15.00 1,050.00 20.00 1,400.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
1,267      CUYD 12.00 15,204.00 34.00 43,078.00        
502-01 superpave asphaltic concrete 13,730.1    TON 55.00 755,155.50 53.75 737,992.87        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
554.8    TON 90.00 49,932.00 84.00 46,603.20        
507-01-A asphaltic surface treatment (1 application) 53,792      SQYD 1.50 80,688.00 1.50 80,688.00        
509-01 cold planing asphaltic pavement 91,091      SQYD 1.00 91,091.00 1.50 136,636.50        
509-02 contractor retained reclaimed asphaltic pavement - 2,293      CUYD 1.00 - 2,293.00 0.10 - 229.30        
701-01-I cross drain pipe (24" rcp/pcp) 16      LNFT 185.00 2,960.00 162.00 2,592.00        
701-15 concrete collar 1      EACH 900.00 900.00 1,300.00 1,300.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 900.0    LNFT 27.00 24,300.00 28.00 25,200.00        
704-03 blocked out guard rail 137.5    LNFT 17.00 2,337.50 17.00 2,337.50        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 50.00 5,000.00 53.00 5,300.00        
704-11-A guard rail end treatment (flared) 4      EACH 1,900.00 7,600.00 2,000.00 8,000.00        
713-01 temporary signs & barricades lump      LUMP 6,000.00 6,000.00 10,000.00 10,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
14.708  MILE 400.00 5,883.20 135.00 1,985.58        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
4.287  MILE 300.00 1,286.10 270.00 1,157.49        
713-05-A temporary pavement markings (solid line)(4" width) 50.933  MILE 250.00 12,733.25 540.00 27,503.82        
717-01 seeding 30      LB 7.50 225.00 8.00 240.00        
718-01 fertilizer 1,000      LB 5.50 5,500.00 0.54 540.00        
721-01 asphalt mulch 2,420      GAL 2.50 6,050.00 2.17 5,251.40        
724-01-C pavement patching (8.5" minimum thickness) 200      SQYD 50.00 10,000.00 90.00 18,000.00        
724-01-D pavement patching (17" minimum thickness) 1,400      SQYD 90.00 126,000.00 100.00 140,000.00        
724-03 pavement joint repair 200.0    TON 170.00 34,000.00 200.00 40,000.00        
726-01 bedding material 4.2    CUYD 80.00 336.00 70.00 294.00        
727-01 mobilization lump      LUMP 100,000.00 100,000.00 30,000.00 30,000.00        
729-16-B object marker assembly (type 2) 2      EACH 55.00 110.00 54.00 108.00        
729-16-C object marker assembly (type 3) 4      EACH 65.00 260.00 67.00 268.00        
731-02 reflectorized raised pavement markers 866      EACH 5.00 4,330.00 5.00 4,330.00        
732-02-A plastic pavement striping (solid line) (4" width) 22.620  MILE 2,000.00 45,240.00 2,100.00 47,502.00        
732-03-A plastic pavement striping (broken line)(4" width) 1.972  MILE 750.00 1,479.00 750.00 1,479.00        
735-01 mailboxes 22      EACH 25.00 550.00 12.00 264.00        
735-02 mailbox supports (single) 18      EACH 150.00 2,700.00 150.00 2,700.00        
735-03 mailbox supports (double) 3      EACH 200.00 600.00 200.00 600.00        
740-01 construction layout lump      LUMP 10,000.00 10,000.00 6,000.00 6,000.00        
744-01 traffic control management lump      LUMP 36,000.00 36,000.00 5,000.00 5,000.00        
S-001 sawcuts in asphaltic concrete lifts 123,000      LNFT 0.50 61,500.00 0.60 73,800.00        
S-002 sawing and sealing longitudinal joints in asphaltic
concrete overlay
50,912      LNFT 0.80 40,729.60 1.00 50,912.00        
S-003 sawing and sealing transverse joints in asphaltic
concrete overlay
25,686      LNFT 0.80 20,548.80 1.15 29,538.90        
                       
 CONTRACTOR TOTAL       1,570,465.95   1,600,356.96        