Letting of 12/14/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 051-02-0021
Parish: FRANKLIN
Routes: LA 17
Description: JUNCTION ROUTE LA 4 - SOUTH JUNCTION ROUTE LA 577
Type Const: grading, pavement patching, cold planing asphaltic concrete, asphaltic surface treatment,
superpave asphaltic concrete overlay, ultra-thin hmac wearing course, and related work.
 
RankLicenseBidderAmount
105789 D & J CONSTRUCTION CO., INC. $2,686,256.69
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,774,121.41
312312 GILCHRIST CONSTRUCTION CO. LLC $2,890,765.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 408      LNFT 10.00 4,080.00 4.00 1,632.00 6.00 2,448.00    
203-08 borrow (vehicular measurement) 745      CUYD 20.00 14,900.00 18.00 13,410.00 12.00 8,940.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
612      CUYD 12.00 7,344.00 49.00 29,988.00 35.00 21,420.00    
502-01 superpave asphaltic concrete 13,693.0    TON 60.00 821,580.00 57.00 780,501.00 57.00 780,501.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
4,053.1    TON 40.00 162,124.00 65.00 263,451.50 70.00 283,717.00    
507-01-A asphaltic surface treatment (1 application) 124,482      SQYD 1.50 186,723.00 2.00 248,964.00 1.60 199,171.20    
509-01 cold planing asphaltic pavement 124,482      SQYD 1.00 124,482.00 1.10 136,930.20 1.60 199,171.20    
509-02 contractor retained reclaimed asphaltic pavement - 3,458      CUYD 0.01 - 34.58 0.10 - 345.80 1.00 - 3,458.00    
702-04-A adjusting manholes 3      EACH 1,200.00 3,600.00 1,500.00 4,500.00 600.00 1,800.00    
704-03 blocked out guard rail 112.5    LNFT 17.00 1,912.50 20.00 2,250.00 16.00 1,800.00    
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 56.00 5,600.00 63.00 6,300.00 55.00 5,500.00    
704-10 guard rail anchor block 4      EACH 755.00 3,020.00 900.00 3,600.00 750.00 3,000.00    
704-11-A guard rail end treatment (flared) 4      EACH 1,900.00 7,600.00 2,200.00 8,800.00 1,900.00 7,600.00    
713-01 temporary signs & barricades lump      LUMP 55,000.00 55,000.00 100,000.00 100,000.00 12,000.00 12,000.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
24.563  MILE 165.00 4,052.89 150.00 3,684.45 550.00 13,509.65    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
21.333  MILE 450.00 9,599.85 286.00 6,101.23 300.00 6,399.90    
713-05-A temporary pavement markings (solid line)(4" width) 59.583  MILE 1.00 59.58 575.00 34,260.22 5.50 327.70    
713-07-A temporary reflectorized raised pavement markers (tabs) 1,082      EACH 1.00 1,082.00 1.15 1,244.30 2.75 2,975.50    
716-01-A mulch (vegetative) 0.28   ACRE 2,100.00 588.00 2,300.00 644.00 4,200.00 1,176.00    
717-01 seeding 17      LB 51.00 867.00 60.00 1,020.00 33.00 561.00    
718-01 fertilizer 280      LB 2.10 588.00 2.29 641.20 3.30 924.00    
724-01-B pavement patching (12" minimum thickness) 275      SQYD 150.00 41,250.00 130.00 35,750.00 100.00 27,500.00    
727-01 mobilization lump      LUMP 180,000.00 180,000.00 200,000.00 200,000.00 240,000.00 240,000.00    
729-16-C object marker assembly (type 3) 4      EACH 75.00 300.00 80.00 320.00 65.00 260.00    
731-02 reflectorized raised pavement markers 1,082      EACH 5.50 5,951.00 5.00 5,410.00 5.00 5,410.00    
732-02-A plastic pavement striping (solid line) (4" width) 19.861  MILE 2,200.00 43,694.20 2,200.00 43,694.20 2,000.00 39,722.00    
732-03-A plastic pavement striping (broken line)(4" width) 7.111  MILE 750.00 5,333.25 900.00 6,399.90 850.00 6,044.35    
735-01 mailboxes 114      EACH 5.50 627.00 12.00 1,368.00 25.00 2,850.00    
735-02 mailbox supports (single) 68      EACH 126.00 8,568.00 160.00 10,880.00 150.00 10,200.00    
735-03 mailbox supports (double) 7      EACH 255.00 1,785.00 365.00 2,555.00 200.00 1,400.00    
735-04 mailbox supports (multiple) 4      EACH 300.00 1,200.00 400.00 1,600.00 300.00 1,200.00    
744-01 traffic control management lump      LUMP 12,000.00 12,000.00 49,000.00 49,000.00 36,000.00 36,000.00    
S-001 adjusting water valves 1      EACH 1,000.00 1,000.00 1,200.00 1,200.00 100.00 100.00    
S-002 ultra-thin hmac wearing course system (0.75 inch thick) 191,511      SQYD 5.00 957,555.00 3.91 748,808.01 5.00 957,555.00    
S-003 rumble strips (ground-in) 16.3    MILE 750.00 12,225.00 1,200.00 19,560.00 800.00 13,040.00    
                       
 CONTRACTOR TOTAL       2,686,256.69   2,774,121.41   2,890,765.50    