| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
632   |
LNFT |
8.00 |
5,056.00 |
4.00 |
2,528.00 |
5.00 |
3,160.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
4,552   |
CUYD |
10.00 |
45,520.00 |
16.00 |
72,832.00 |
13.00 |
59,176.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
3,346   |
CUYD |
8.00 |
26,768.00 |
38.00 |
127,148.00 |
50.00 |
167,300.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
12,401.2 |
TON |
60.00 |
744,072.00 |
59.00 |
731,670.80 |
62.00 |
768,874.40 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,385.1 |
TON |
75.00 |
178,882.50 |
90.00 |
214,659.00 |
85.00 |
202,733.50 |
|
|
| 507-01-A |
asphaltic surface treatment (1 application)
|
13,279   |
SQYD |
1.45 |
19,254.55 |
2.00 |
26,558.00 |
2.20 |
29,213.80 |
|
|
| 507-01-B |
asphaltic surface treatment (2 applications)
|
62,610   |
SQYD |
2.44 |
152,768.40 |
3.00 |
187,830.00 |
2.60 |
162,786.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
62,610   |
SQYD |
1.25 |
78,262.50 |
1.25 |
78,262.50 |
1.70 |
106,437.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,739   |
CUYD |
0.01 |
- 17.39 |
0.10 |
- 173.90 |
1.00 |
- 1,739.00 |
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
8   |
LNFT |
125.00 |
1,000.00 |
92.00 |
736.00 |
240.00 |
1,920.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
104   |
LNFT |
85.00 |
8,840.00 |
115.00 |
11,960.00 |
210.00 |
21,840.00 |
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
56   |
LNFT |
105.00 |
5,880.00 |
150.00 |
8,400.00 |
185.00 |
10,360.00 |
|
|
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
24   |
LNFT |
120.00 |
2,880.00 |
172.00 |
4,128.00 |
225.00 |
5,400.00 |
|
|
| 701-15 |
concrete collar
|
17   |
EACH |
600.00 |
10,200.00 |
800.00 |
13,600.00 |
1,500.00 |
25,500.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
100.0 |
LNFT |
30.00 |
3,000.00 |
69.00 |
6,900.00 |
30.00 |
3,000.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
230.0 |
LNFT |
45.00 |
10,350.00 |
52.00 |
11,960.00 |
46.00 |
10,580.00 |
|
|
| 704-03 |
blocked out guard rail
|
268.8 |
LNFT |
17.00 |
4,569.60 |
20.00 |
5,376.00 |
17.00 |
4,569.60 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,000.00 |
8,000.00 |
2,300.00 |
9,200.00 |
1,900.00 |
7,600.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
31,000.00 |
31,000.00 |
50,000.00 |
50,000.00 |
12,000.00 |
12,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
16.597 |
MILE |
165.00 |
2,738.50 |
1,200.00 |
19,916.40 |
550.00 |
9,128.35 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
11.994 |
MILE |
255.00 |
3,058.47 |
230.00 |
2,758.62 |
300.00 |
3,598.20 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
48.398 |
MILE |
1.00 |
48.39 |
575.00 |
27,828.85 |
5.50 |
266.18 |
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
731   |
EACH |
1.50 |
1,096.50 |
1.15 |
840.65 |
2.20 |
1,608.20 |
|
|
| 716-01-A |
mulch (vegetative)
|
1.38 |
ACRE |
505.00 |
696.90 |
575.00 |
793.50 |
550.00 |
759.00 |
|
|
| 717-01 |
seeding
|
83   |
LB |
15.50 |
1,286.50 |
18.00 |
1,494.00 |
16.00 |
1,328.00 |
|
|
| 718-01 |
fertilizer
|
1,380   |
LB |
0.50 |
690.00 |
0.57 |
786.60 |
0.55 |
759.00 |
|
|
| 724-01 |
pavement patching
|
856   |
SQYD |
95.00 |
81,320.00 |
90.00 |
77,040.00 |
85.00 |
72,760.00 |
|
|
| 726-01 |
bedding material
|
265.4 |
CUYD |
75.00 |
19,905.00 |
1.15 |
305.21 |
50.00 |
13,270.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
60,000.00 |
60,000.00 |
50,000.00 |
50,000.00 |
200,000.00 |
200,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
76.00 |
304.00 |
80.00 |
320.00 |
70.00 |
280.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
731   |
EACH |
6.00 |
4,386.00 |
5.00 |
3,655.00 |
5.00 |
3,655.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
16.133 |
MILE |
2,250.00 |
36,299.25 |
2,300.00 |
37,105.90 |
2,000.00 |
32,266.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.998 |
MILE |
800.00 |
3,198.40 |
1,000.00 |
3,998.00 |
900.00 |
3,598.20 |
|
|
| 735-01 |
mailboxes
|
67   |
EACH |
1.00 |
67.00 |
15.00 |
1,005.00 |
25.00 |
1,675.00 |
|
|
| 735-02 |
mailbox supports (single)
|
47   |
EACH |
120.00 |
5,640.00 |
150.00 |
7,050.00 |
175.00 |
8,225.00 |
|
|
| 735-03 |
mailbox supports (double)
|
7   |
EACH |
200.00 |
1,400.00 |
230.00 |
1,610.00 |
200.00 |
1,400.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
2   |
EACH |
350.00 |
700.00 |
650.00 |
1,300.00 |
300.00 |
600.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
12,000.00 |
12,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
20,000.00 |
20,000.00 |
21,000.00 |
21,000.00 |
32,000.00 |
32,000.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
85.45 |
CUYD |
755.00 |
64,514.75 |
1,050.00 |
89,722.50 |
1,250.00 |
106,812.50 |
|
|
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
60.0 |
LNFT |
455.00 |
27,300.00 |
450.00 |
27,000.00 |
520.00 |
31,200.00 |
|
|
| 805-12-F |
reinforced concrete box culverts (5'x 4')
|
16.0 |
LNFT |
525.00 |
8,400.00 |
575.00 |
9,200.00 |
600.00 |
9,600.00 |
|
|
| 805-12-M |
reinforced concrete box culverts (6'x 6')
|
32.0 |
LNFT |
515.00 |
16,480.00 |
800.00 |
25,600.00 |
600.00 |
19,200.00 |
|
|
| 805-12-P |
reinforced concrete box culverts (7'x 7')
|
24.0 |
LNFT |
705.00 |
16,920.00 |
920.00 |
22,080.00 |
750.00 |
18,000.00 |
|
|
| 805-12-Y |
reinforced concrete box culverts (3'x 3')
|
49.0 |
LNFT |
355.00 |
17,395.00 |
430.00 |
21,070.00 |
520.00 |
25,480.00 |
|
|
| 805-12-Z |
reinforced concrete box culverts (4'x 2')
|
32.0 |
LNFT |
350.00 |
11,200.00 |
430.00 |
13,760.00 |
700.00 |
22,400.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
6,139   |
LB |
1.30 |
7,980.70 |
2.29 |
14,058.31 |
0.70 |
4,297.30 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,769,311.52 |
|
2,074,872.94 |
|
2,236,877.23 |
|
|
|