| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
5,000   |
CUYD |
12.00 |
60,000.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
400   |
CUYD |
20.00 |
8,000.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
12,607.6 |
TON |
62.00 |
781,671.20 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
850.0 |
TON |
50.00 |
42,500.00 |
|
|
|
|
|
|
| 509-01-A |
cold planing asphaltic pavement (2" average depth)
|
1,538   |
SQYD |
1.15 |
1,768.70 |
|
|
|
|
|
|
| 509-01-B |
cold planing asphaltic pavement (1/2" average depth)
|
72,554   |
SQYD |
1.15 |
83,437.10 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 526   |
CUYD |
1.00 |
- 526.00 |
|
|
|
|
|
|
| 701-01-I/K |
cross drain pipe (24" rcp/pcp or 30" cmp)
|
64   |
LNFT |
160.00 |
10,240.00 |
|
|
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
24   |
LNFT |
175.00 |
4,200.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
2   |
EACH |
650.00 |
1,300.00 |
|
|
|
|
|
|
| 711-01-D |
riprap (55 lb, 18"thick)
|
175   |
SQYD |
60.00 |
10,500.00 |
|
|
|
|
|
|
| 711-04 |
geotextile fabric
|
175   |
SQYD |
2.50 |
437.50 |
|
|
|
|
|
|
| 712-02 |
sacked concrete revetment
|
130   |
SQYD |
70.00 |
9,100.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
77,200.00 |
77,200.00 |
|
|
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
184   |
LNFT |
0.10 |
18.40 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
11.440 |
MILE |
325.00 |
3,718.00 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.598 |
MILE |
1.00 |
7.59 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
36.170 |
MILE |
1.00 |
36.17 |
|
|
|
|
|
|
| 716-01-B |
mulch (fiber)
|
14.00 |
ACRE |
600.00 |
8,400.00 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
500   |
SQYD |
63.00 |
31,500.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
77,200.00 |
77,200.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
756   |
EACH |
4.50 |
3,402.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
92   |
LNFT |
2.40 |
220.80 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
18.085 |
MILE |
1,975.00 |
35,717.87 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.722 |
MILE |
800.00 |
2,977.60 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
73   |
EACH |
1.00 |
73.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
49   |
EACH |
120.00 |
5,880.00 |
|
|
|
|
|
|
| 735-03 |
mailbox supports (double)
|
12   |
EACH |
170.00 |
2,040.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
14.00 |
ACRE |
1,100.00 |
15,400.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
11.17 |
CUYD |
1,200.00 |
13,404.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
1,129   |
LB |
2.50 |
2,822.50 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,322,646.43 |
|
|
|
|
|
|
|