| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
1,000.00 |
1,000.00 |
6,000.00 |
6,000.00 |
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
485   |
SQYD |
10.00 |
4,850.00 |
15.00 |
7,275.00 |
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
764.9 |
LNFT |
23.00 |
17,592.70 |
15.00 |
11,473.50 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
25,000.00 |
25,000.00 |
22,000.00 |
22,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
72   |
EACH |
6.00 |
432.00 |
20.00 |
1,440.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
5   |
EACH |
100.00 |
500.00 |
110.00 |
550.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,500   |
LNFT |
2.50 |
3,750.00 |
1.30 |
1,950.00 |
|
|
|
|
| 304-01 |
lime
|
29.77 |
TON |
120.00 |
3,572.40 |
140.00 |
4,167.80 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
2,100   |
SQYD |
2.00 |
4,200.00 |
3.50 |
7,350.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
5,723.2 |
TON |
60.00 |
343,392.00 |
69.00 |
394,900.80 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
603.0 |
TON |
90.00 |
54,270.00 |
69.00 |
41,607.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
5,054   |
SQYD |
3.00 |
15,162.00 |
4.00 |
20,216.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 351   |
CUYD |
10.00 |
- 3,510.00 |
5.00 |
- 1,755.00 |
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
8   |
LNFT |
90.00 |
720.00 |
60.00 |
480.00 |
|
|
|
|
| 701-04-A |
storm drain pipe arch (15" equiv. rcpa)
|
470   |
LNFT |
95.00 |
44,650.00 |
63.00 |
29,610.00 |
|
|
|
|
| 701-06-F |
side drain pipe arch (36" equiv.)
|
80   |
LNFT |
150.00 |
12,000.00 |
78.00 |
6,240.00 |
|
|
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
500.00 |
500.00 |
900.00 |
900.00 |
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
6   |
EACH |
4,000.00 |
24,000.00 |
5,000.00 |
30,000.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
2   |
EACH |
1,000.00 |
2,000.00 |
700.00 |
1,400.00 |
|
|
|
|
| 702-08-B |
side drain safety end (type 2)
|
1   |
EACH |
3,000.00 |
3,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
7.7 |
SQYD |
200.00 |
1,540.00 |
160.00 |
1,232.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
1,890.2 |
LNFT |
27.00 |
51,035.40 |
27.00 |
51,035.40 |
|
|
|
|
| 708-01 |
right-of-way monument
|
9   |
EACH |
50.00 |
450.00 |
100.00 |
900.00 |
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
9   |
EACH |
50.00 |
450.00 |
35.00 |
315.00 |
|
|
|
|
| 710-01 |
flowable fill
|
2   |
CUYD |
700.00 |
1,400.00 |
200.00 |
400.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
30,000.00 |
30,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
300   |
LNFT |
0.45 |
135.00 |
0.50 |
150.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
288   |
LNFT |
1.30 |
374.40 |
1.40 |
403.20 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.884 |
MILE |
1,200.00 |
1,060.80 |
190.00 |
167.96 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
1.193 |
MILE |
700.00 |
835.10 |
700.00 |
835.10 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
12   |
EACH |
50.00 |
600.00 |
60.00 |
720.00 |
|
|
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
6   |
EACH |
50.00 |
300.00 |
60.00 |
360.00 |
|
|
|
|
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
4   |
EACH |
200.00 |
800.00 |
230.00 |
920.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
50   |
SQYD |
100.00 |
5,000.00 |
77.00 |
3,850.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
80,000.00 |
80,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
502   |
EACH |
5.50 |
2,761.00 |
6.00 |
3,012.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
300   |
LNFT |
1.00 |
300.00 |
1.00 |
300.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
288   |
LNFT |
3.00 |
864.00 |
3.00 |
864.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
1.193 |
MILE |
3,000.00 |
3,579.00 |
3,000.00 |
3,579.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.884 |
MILE |
1,000.00 |
884.00 |
1,000.00 |
884.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
12   |
EACH |
150.00 |
1,800.00 |
160.00 |
1,920.00 |
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
7   |
EACH |
200.00 |
1,400.00 |
220.00 |
1,540.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
6   |
EACH |
150.00 |
900.00 |
170.00 |
1,020.00 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
4   |
EACH |
500.00 |
2,000.00 |
500.00 |
2,000.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
1.50 |
ACRE |
2,000.00 |
3,000.00 |
1,700.00 |
2,550.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
4,000.00 |
4,000.00 |
8,000.00 |
8,000.00 |
|
|
|
|
| S-001 |
milling portland cement concrete pavement (1" average
depth) |
250   |
SQYD |
7.00 |
1,750.00 |
32.00 |
8,000.00 |
|
|
|
|
| S-002 |
dynamic message sign unit
|
4   |
EACH |
5,500.00 |
22,000.00 |
4,700.00 |
18,800.00 |
|
|
|
|
| S-003 |
video detection system
|
1   |
each |
25,000.00 |
25,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
811,299.80 |
|
816,562.76 |
|
|
|
|
|