Lead Project: 006-01-0012
Parish: JEFFERSON
Routes: US 90
Description: HUEY P. LONG WIDENING (MAIN BRIDGE - SUBSTRUCTURE)
Type Const: structural steel and reinforced concrete pier widening and post tensioned reinforced
concrete encasement and related work.
 
RankLicenseBidderAmount
100271 MASSMAN CONSTRUCTION CO. $83,114,258.75
235836 AMERICAN BRIDGE CO. $86,964,470.75
301029 TRAYLOR BROTHERS, INC. $87,849,186.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
MASSMAN CONSTRUCTION CO.
- 2 -
AMERICAN BRIDGE CO.
- 3 -
TRAYLOR BROTHERS, INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 1,000,000.00 1,000,000.00 2,500,000.00 2,500,000.00 250,000.00 250,000.00    
722-01 project site laboratory 1      EACH 33,000.00 33,000.00 800,000.00 800,000.00 30,000.00 30,000.00    
727-01 mobilization lump      LUMP 8,000,000.00 8,000,000.00 8,000,000.00 8,000,000.00 8,000,000.00 8,000,000.00    
730-09 electrical system lump      LUMP 300,000.00 300,000.00 300,000.00 300,000.00 280,000.00 280,000.00    
740-01 construction layout lump      LUMP 25,000.00 25,000.00 1,000,000.00 1,000,000.00 400,000.00 400,000.00    
802-03 structural excavation for piers (dry) 569.0    CUYD 750.00 426,750.00 3,000.00 1,707,000.00 50.00 28,450.00    
805-01-E class a concrete (piers) 16,463.00   CUYD 1,000.00 16,463,000.00 1,900.00 31,279,700.00 1,210.00 19,920,230.00    
806-01 deformed reinforcing steel 2,470,405      LB 1.75 4,323,208.75 2.15 5,311,370.75 1.60 3,952,648.00    
807-06 structural metalwork lump      LUMP 47,217,000.00 47,217,000.00 30,200,000.00 30,200,000.00 48,887,000.00 48,887,000.00    
S-102 pier protection system lump      LUMP 600,000.00 600,000.00 1,000,000.00 1,000,000.00 900,000.00 900,000.00    
S-103 marine navigation clearance gage lump      LUMP 60,000.00 60,000.00 40,000.00 40,000.00 120,000.00 120,000.00    
S-104 post tensioning lump      LUMP 2,000,000.00 2,000,000.00 1,750,000.00 1,750,000.00 3,500,000.00 3,500,000.00    
S-106 pier drainage system lump      LUMP 50,000.00 50,000.00 100,000.00 100,000.00 65,000.00 65,000.00    
S-107 pier jacking lump      LUMP 693,000.00 693,000.00 150,000.00 150,000.00 1,000,000.00 1,000,000.00    
S-109 2-1/2 inch diameter cored holes 8,237      EACH 150.00 1,235,550.00 200.00 1,647,400.00 34.00 280,058.00    
S-110 3-1/4 inch diameter cored holes 3,930      EACH 175.00 687,750.00 300.00 1,179,000.00 60.00 235,800.00    
                       
 CONTRACTOR TOTAL       83,114,258.75   86,964,470.75   87,849,186.00    