| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - PETERS CONSTRUCTION CO., INC. |
- 2 - F. MILLER & SONS, LLC |
- 3 - GUINN BROTHERS, LLC. |
- 4 - GILCHRIST CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
10,000.00 |
10,000.00 |
8,900.00 |
8,900.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
10,000.00 |
10,000.00 |
1,600.00 |
1,600.00 |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
| 202-02-A-01 |
removal of bridge (sta 13+04.98; 40'x 95.00' concrete
slab span bridge) |
1   |
EACH |
30,000.00 |
30,000.00 |
36,300.00 |
36,300.00 |
45,000.00 |
45,000.00 |
75,000.00 |
75,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
565   |
SQYD |
8.00 |
4,520.00 |
15.00 |
8,475.00 |
18.00 |
10,170.00 |
15.00 |
8,475.00 |
| 202-02-D |
removal of concrete walks & drives
|
39   |
SQYD |
8.00 |
312.00 |
13.00 |
507.00 |
12.00 |
468.00 |
20.00 |
780.00 |
| 202-02-F |
removal of concrete combination curb & gutter
|
37.3 |
LNFT |
4.00 |
149.20 |
25.00 |
932.50 |
15.00 |
559.50 |
30.00 |
1,119.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
30,000.00 |
30,000.00 |
19,000.00 |
19,000.00 |
20,000.00 |
20,000.00 |
50,000.00 |
50,000.00 |
| 302-01 |
class ii base course (stone)
|
113.1 |
CUYD |
40.00 |
4,524.00 |
56.00 |
6,333.60 |
100.00 |
11,310.00 |
100.00 |
11,310.00 |
| 302-02-D |
class ii base course (12" thick) (stone)
|
339.3 |
SQYD |
20.00 |
6,786.00 |
19.00 |
6,446.70 |
35.00 |
11,875.50 |
35.00 |
11,875.50 |
| 502-01 |
superpave asphaltic concrete
|
30.7 |
TON |
200.00 |
6,140.00 |
244.00 |
7,490.80 |
275.00 |
8,442.50 |
300.00 |
9,210.00 |
| 601-01-G |
portland cement concrete pavement (8" thick)
|
278.7 |
SQYD |
65.00 |
18,115.50 |
47.00 |
13,098.90 |
120.00 |
33,444.00 |
100.00 |
27,870.00 |
| 601-04 |
portland cement concrete pavement coring
|
2   |
EACH |
300.00 |
600.00 |
153.00 |
306.00 |
250.00 |
500.00 |
150.00 |
300.00 |
| 701-03-G |
storm drain pipe (18" rcp)
|
84   |
LNFT |
35.00 |
2,940.00 |
42.00 |
3,528.00 |
100.00 |
8,400.00 |
100.00 |
8,400.00 |
| 701-03-M |
storm drain pipe (36" rcp)
|
62   |
LNFT |
150.00 |
9,300.00 |
94.00 |
5,828.00 |
195.00 |
12,090.00 |
175.00 |
10,850.00 |
| 702-03-I |
catch basins (cb-19)(special detail)
|
4   |
EACH |
2,500.00 |
10,000.00 |
3,000.00 |
12,000.00 |
5,000.00 |
20,000.00 |
5,000.00 |
20,000.00 |
| 706-01-A |
concrete walk (4" thick)
|
111.7 |
SQYD |
40.00 |
4,468.00 |
37.00 |
4,132.90 |
65.00 |
7,260.50 |
75.00 |
8,377.50 |
| 707-03 |
combination concrete curb & gutter
|
177.6 |
LNFT |
30.00 |
5,328.00 |
25.00 |
4,440.00 |
40.00 |
7,104.00 |
45.00 |
7,992.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
31,900.00 |
31,900.00 |
26,000.00 |
26,000.00 |
25,000.00 |
25,000.00 |
| 720-01-B |
erosion control system, slope protection (type b)
|
969   |
SQYD |
3.00 |
2,907.00 |
2.00 |
1,938.00 |
2.50 |
2,422.50 |
2.80 |
2,713.20 |
| 726-01 |
bedding material
|
20.2 |
CUYD |
40.00 |
808.00 |
98.00 |
1,979.60 |
100.00 |
2,020.00 |
75.00 |
1,515.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
25,000.00 |
25,000.00 |
70,000.00 |
70,000.00 |
100,000.00 |
100,000.00 |
95,000.00 |
95,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
2   |
EACH |
90.00 |
180.00 |
102.00 |
204.00 |
100.00 |
200.00 |
120.00 |
240.00 |
| 731-02 |
reflectorized raised pavement markers
|
8   |
EACH |
8.00 |
64.00 |
10.00 |
80.00 |
16.00 |
128.00 |
100.00 |
800.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.149 |
MILE |
3,800.00 |
566.20 |
5,100.00 |
759.90 |
5,000.00 |
745.00 |
40,000.00 |
5,960.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.074 |
MILE |
1,460.00 |
108.04 |
2,200.00 |
162.80 |
2,500.00 |
185.00 |
20,000.00 |
1,480.00 |
| 739-01 |
hydro-seeding
|
0.24 |
ACRE |
3,200.00 |
768.00 |
6,100.00 |
1,464.00 |
5,000.00 |
1,200.00 |
6,000.00 |
1,440.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
20,600.00 |
20,600.00 |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
6,000.00 |
6,000.00 |
25,800.00 |
25,800.00 |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
| 804-01-C |
precast concrete piles (16")
|
2,844   |
LNFT |
50.00 |
142,200.00 |
49.00 |
139,356.00 |
55.00 |
156,420.00 |
50.00 |
142,200.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
| 805-01-F |
class a concrete (bents)
|
56.48 |
CUYD |
800.00 |
45,184.00 |
710.00 |
40,100.80 |
950.00 |
53,656.00 |
800.00 |
45,184.00 |
| 805-03 |
class aa concrete
|
230.25 |
CUYD |
750.00 |
172,687.50 |
400.00 |
92,100.00 |
700.00 |
161,175.00 |
800.00 |
184,200.00 |
| 806-01 |
deformed reinforcing steel
|
52,138   |
LB |
1.00 |
52,138.00 |
0.82 |
42,753.16 |
0.90 |
46,924.20 |
1.00 |
52,138.00 |
| 810-05 |
pipe & concrete railing
|
200.00 |
LNFT |
80.00 |
16,000.00 |
154.00 |
30,800.00 |
125.00 |
25,000.00 |
125.00 |
25,000.00 |
| 813-01 |
concrete approach slabs
|
240.00 |
SQYD |
200.00 |
48,000.00 |
200.00 |
48,000.00 |
225.00 |
54,000.00 |
230.00 |
55,200.00 |
| S-001 |
sawing and sealing of longitudinal joints in asphaltic
concrete overlay |
112   |
LNFT |
6.00 |
672.00 |
6.00 |
672.00 |
20.00 |
2,240.00 |
7.00 |
784.00 |
| S-002 |
sawing and sealing of transverse joints in asphaltic
concrete overlay |
90   |
LNFT |
6.00 |
540.00 |
6.00 |
540.00 |
20.00 |
1,800.00 |
8.00 |
720.00 |
| S-003 |
portland cement concrete channel paving and revetment
|
lump |
LUMP |
61,111.05 |
61,111.05 |
104,000.00 |
104,000.00 |
125,000.00 |
125,000.00 |
90,000.00 |
90,000.00 |
| S-004 |
4'-8" wide portland cement concrete vertical wall
channel |
2   |
EACH |
4,000.00 |
8,000.00 |
2,100.00 |
4,200.00 |
6,000.00 |
12,000.00 |
5,500.00 |
11,000.00 |
| S-201 |
8" pvc c900 class 150 water pipe
|
10   |
LNFT |
20.00 |
200.00 |
130.00 |
1,300.00 |
40.00 |
400.00 |
23.00 |
230.00 |
| S-202 |
8" pe 3408 sdr-11 water pipe
|
68   |
LNFT |
40.00 |
2,720.00 |
45.00 |
3,060.00 |
50.00 |
3,400.00 |
35.00 |
2,380.00 |
| S-203 |
mechanical joint and swivel ductile iron fittings
|
0.5 |
TON |
4,000.00 |
2,000.00 |
10,000.00 |
5,000.00 |
7,500.00 |
3,750.00 |
6,300.00 |
3,150.00 |
| S-204 |
mechanical joint restraint devices
|
9   |
EACH |
80.00 |
720.00 |
194.00 |
1,746.00 |
100.00 |
900.00 |
80.00 |
720.00 |
| S-205 |
pvc pipe joint restraint devices
|
1   |
EACH |
100.00 |
100.00 |
245.00 |
245.00 |
100.00 |
100.00 |
90.00 |
90.00 |
| S-206 |
16" x 16" x 8" tapping sleeve and valve with valve box
and concrete pad |
2   |
EACH |
900.00 |
1,800.00 |
3,200.00 |
6,400.00 |
8,500.00 |
17,000.00 |
7,000.00 |
14,000.00 |
| S-207 |
8" pe to m.j. transitions
|
2   |
EACH |
800.00 |
1,600.00 |
560.00 |
1,120.00 |
915.00 |
1,830.00 |
850.00 |
1,700.00 |
| S-208 |
cut, abandon, and remove existing water line
|
250   |
LNFT |
10.00 |
2,500.00 |
6.00 |
1,500.00 |
10.00 |
2,500.00 |
4.50 |
1,125.00 |
| S-209 |
cut, cap, and block existing water 8" water line
|
1   |
EACH |
700.00 |
700.00 |
1,100.00 |
1,100.00 |
1,250.00 |
1,250.00 |
525.00 |
525.00 |
| S-210 |
connection to existing 8" water mains
|
2   |
EACH |
1,000.00 |
2,000.00 |
2,500.00 |
5,000.00 |
1,250.00 |
2,500.00 |
525.00 |
1,050.00 |
| S-211 |
field hydrostatic and leakage test of water lines
|
lump |
LUMP |
1,000.00 |
1,000.00 |
1,200.00 |
1,200.00 |
1,700.00 |
1,700.00 |
950.00 |
950.00 |
| S-212 |
disinfection of water lines and appurtenances
|
lump |
LUMP |
1,500.00 |
1,500.00 |
1,200.00 |
1,200.00 |
2,500.00 |
2,500.00 |
1,400.00 |
1,400.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
798,956.49 |
|
825,700.66 |
|
1,050,570.70 |
|
1,073,453.20 |
|