Lead Project: 026-03-0041
Parish: CONCORDIA, CATAHOULA
Routes: LA 15
Description: TENSAS RIVER BRIDGE - CLAYTON (BRIDGE AND APPROACHES)
Type Const: grading, lime treatment, class ii base course, superpave asphaltic concrete pavement,
concrete girder span bridge and approaches and related work
 
RankLicenseBidderAmount
100481 COASTAL BRIDGE CO., L.L.C. $3,268,889.80
234567 JAMES CONSTRUCTION GROUP LLC $4,776,081.50
333131 AMERICAN CONTRACTING & SERVICES,INC $5,668,504.60
 
Item Number Item Description Quantity Unit of Measure - 1 -
COASTAL BRIDGE CO., L.L.C.
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
AMERICAN CONTRACTING & SERVICES,INC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      LUMP 5,000.00 5,000.00 45,000.00 45,000.00 40,000.00 40,000.00    
202-01 removal of structures & obstructions lump      LUMP 5,000.00 5,000.00 25,000.00 25,000.00 45,000.00 45,000.00    
203-06 excavation and embankment lump      LUMP 90,000.00 90,000.00 35,000.00 35,000.00 35,000.00 35,000.00    
204-05-A temporary sediment check dams (hay) 4      EACH 200.00 800.00 150.00 600.00 400.00 1,600.00    
204-06 temporary silt fencing 720      LNFT 3.00 2,160.00 4.00 2,880.00 3.00 2,160.00    
204-07 temporary stone construction entrance 2      EACH 500.00 1,000.00 5,000.00 10,000.00 5,000.00 10,000.00    
302-02-C-01 class ii base course (10" thick)(stone or recycled
pccp)
156.0    SQYD 60.00 9,360.00 40.00 6,240.00 50.00 7,800.00    
302-02-E-01 class ii base course (4" thick)(stone or recycled pccp) 348.0    SQYD 30.00 10,440.00 20.00 6,960.00 17.00 5,916.00    
302-02-F-01 class ii base course (8" thick)(soil cement) 348.0    SQYD 60.00 20,880.00 30.00 10,440.00 40.00 13,920.00    
304-01 lime 6.80   TON 350.00 2,380.00 190.00 1,292.00 150.00 1,020.00    
304-02-D lime treatment (type b) (12" thick) 480      SQYD 4.00 1,920.00 3.00 1,440.00 11.00 5,280.00    
502-01 superpave asphaltic concrete 86.9    TON 200.00 17,380.00 475.00 41,277.50 135.00 11,731.50    
704-03 blocked out guard rail 163.0    LNFT 20.00 3,260.00 18.00 2,934.00 18.00 2,934.00    
704-08-B guard rail transitions (double thrie beam) 50.0    LNFT 50.00 2,500.00 40.00 2,000.00 42.00 2,100.00    
704-11-A guard rail end treatment (flared) 2      EACH 2,500.00 5,000.00 2,200.00 4,400.00 2,300.00 4,600.00    
712-04 flexible revetment 1,160      SQYD 65.00 75,400.00 60.00 69,600.00 60.00 69,600.00    
716-01-A mulch (vegetative) 1.24   ACRE 1,000.00 1,240.00 1,000.00 1,240.00 1,000.00 1,240.00    
717-01 seeding 38      LB 10.00 380.00 25.00 950.00 8.00 304.00    
718-01 fertilizer 1,238      LB 0.60 742.80 1.00 1,238.00 0.50 619.00    
722-01 project site laboratory 1      EACH 25,000.00 25,000.00 5,000.00 5,000.00 15,000.00 15,000.00    
727-01 mobilization lump      LUMP 300,000.00 300,000.00 470,000.00 470,000.00 565,000.00 565,000.00    
729-16-C object marker assembly (type 3) 2      EACH 100.00 200.00 70.00 140.00 75.00 150.00    
731-01 nonreflectorized raised pavement markers 154      EACH 20.00 3,080.00 17.00 2,618.00 11.00 1,694.00    
731-02 reflectorized raised pavement markers 129      EACH 10.00 1,290.00 9.00 1,161.00 7.00 903.00    
732-02-A plastic pavement striping (solid line) (4" width) 0.291  MILE 4,000.00 1,164.00 3,600.00 1,047.60 8,000.00 2,328.00    
732-03-A plastic pavement striping (broken line)(4" width) 0.147  MILE 1,500.00 220.50 1,200.00 176.40 5,000.00 735.00    
740-01 construction layout lump      LUMP 30,000.00 30,000.00 50,000.00 50,000.00 65,000.00 65,000.00    
804-01-B precast concrete piles (14") 327      LNFT 30.00 9,810.00 45.00 14,715.00 135.00 44,145.00    
804-01-F precast concrete piles (24") 1,626      LNFT 85.00 138,210.00 90.00 146,340.00 185.00 300,810.00    
804-01-G precast concrete piles (30") 3,785      LNFT 155.00 586,675.00 200.00 757,000.00 350.00 1,324,750.00    
804-09 loading test piles 2      EACH 100.00 200.00 1,500.00 3,000.00 20,000.00 40,000.00    
804-10 reloading test piles 2      EACH 100.00 200.00 1,500.00 3,000.00 20,000.00 40,000.00    
804-11 redriving test piles 2      EACH 100.00 200.00 2,500.00 5,000.00 6,000.00 12,000.00    
804-12 loading permanent piles 1      EACH 3,000.00 3,000.00 1,000.00 1,000.00 20,000.00 20,000.00    
804-13 precast concrete indicator piles 4      EACH 30,000.00 120,000.00 40,000.00 160,000.00 35,000.00 140,000.00    
804-17 dynamic monitoring 8      EACH 2,000.00 16,000.00 1,000.00 8,000.00 6,000.00 48,000.00    
805-01-F class a concrete (bents) 215.50   CUYD 850.00 183,175.00 1,200.00 258,600.00 1,000.00 215,500.00    
805-03 class aa concrete 874.00   CUYD 530.00 463,220.00 1,000.00 874,000.00 850.00 742,900.00    
805-08-D precast-prestressed concrete girders (type iv) 4,630.1    LNFT 175.00 810,267.50 280.00 1,296,428.00 295.00 1,365,879.50    
805-11 strip seal joints 80.00   LNFT 150.00 12,000.00 250.00 20,000.00 250.00 20,000.00    
806-01 deformed reinforcing steel 237,322      LB 0.70 166,125.40 1.00 237,322.00 0.90 213,589.80    
807-06 structural metalwork lump      LUMP 10,000.00 10,000.00 12,000.00 12,000.00 25,000.00 25,000.00    
810-01 concrete railing (barrier, f-shape, pl-2) 1,594.00   LNFT 45.00 71,730.00 60.00 95,640.00 80.00 127,520.00    
813-01 concrete approach slabs 355.56   SQYD 160.00 56,889.60 200.00 71,112.00 200.00 71,112.00    
S-001 rumble strips (ground-in) 0.039  MILE 10,000.00 390.00 110,000.00 4,290.00 4,200.00 163.80    
S-101 retroreflective sheeting panels lump      LUMP 5,000.00 5,000.00 10,000.00 10,000.00 5,500.00 5,500.00    
                       
 CONTRACTOR TOTAL       3,268,889.80   4,776,081.50   5,668,504.60    