Letting of 11/16/2005 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 023-10-0035
Parish: LINCOLN
Routes: US 167
Description: VIENNA - JCT. LA 822
Type Const: grading, drain struct. lime trmt, class ii bc, superpave acp (alt. a-1), pccp (alt.
a-2), concrete slab span bridges with approach slabs and related work.
 
RankLicenseBidderAmount
134567 JAMES CONSTRUCTION GROUP LLC $14,065,373.87
221810 HIGHWAY SPECIALISTS INC. $18,679,981.59
 
Item Number Item Description Quantity Unit of Measure - 1 -
JAMES CONSTRUCTION GROUP LLC
- 2 -
HIGHWAY SPECIALISTS INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      lump 200,000.00 200,000.00 250,000.00 250,000.00        
202-01 removal of structures & obstructions lump      lump 30,000.00 30,000.00 200,000.00 200,000.00        
202-02-A-01 removal of bridge (sta. 50+690; 8.53 m x 60.96 m
concrete slab bridge)
1      each 35,000.00 35,000.00 50,000.00 50,000.00        
202-02-A-02 removal of bridge (sta. 50+906; 8.53 m x 36.58 m
concrete slab bridge)
1      each 25,000.00 25,000.00 50,000.00 50,000.00        
202-02-B-01 removal of concrete box culverts (sta. 50+578.4;
1219 mm x 1219 mm x 22 m)
1      each 2,500.00 2,500.00 5,000.00 5,000.00        
202-02-B-02 removal of concrete box culverts (sta. 52+099.2;
914 mm x 610 mm x 32 m)
1      each 3,500.00 3,500.00 5,000.00 5,000.00        
202-02-B-03 removal of concrete box culverts (sta. 52+740.8;
1219 mm x 610 mm x 22 m)
1      each 2,500.00 2,500.00 5,000.00 5,000.00        
202-02-C removal of portland cement concrete pavement 50,391      sq m 10.00 503,910.00 9.00 453,519.00        
202-02-D removal of concrete walks and drives 413      sq m 7.00 2,891.00 14.00 5,782.00        
202-02-G removal of surfacing and stabilized base 24,363.0    sq m 5.00 121,815.00 6.00 146,178.00        
202-02-H removal of guard rail 592      ln m 20.00 11,840.00 18.00 10,656.00        
202-02-I removal of safety end treatment 64      each 300.00 19,200.00 400.00 25,600.00        
202-02-01 removal of 14.9 m x 11.7 m brick residence (lt. of
sta. 51+300.0)
1      each 4,000.00 4,000.00 1.00 1.00        
202-02-02 removal of 5.0 m x 7.5 m wood frame shed (lt. of sta.
51+340.3)
1      each 200.00 200.00 1.00 1.00        
202-02-03 removal of 12.3 m x 9.2 m wood frame residence (lt. of
sta. 51+371.5)
1      each 3,000.00 3,000.00 1.00 1.00        
202-02-04 removal of 10.0 m x 17.3 m wood frame residence (lt.
of sta. 51+377.5) (contains non-friable asbestos)
1      each 3,000.00 3,000.00 1.00 1.00        
202-02-05 removal of 10.0 m x 11.0 m wood frame building (rt. of
sta. 51+414.9)
1      each 1,000.00 1,000.00 1.00 1.00        
202-02-06 removal of 12.2 m x 15.2 m shop on slab (lt. of sta.
51+810.3)
1      each 3,000.00 3,000.00 1.00 1.00        
202-02-07 removal of 14.7 m x 14.2 m residence (rt. of sta.
51+827.1)(contains friable asbestos)
1      each 6,000.00 6,000.00 1.00 1.00        
202-02-08 removal of 3.4 m x 3.7 m wood shed (rt. of sta.
51+857.4)
1      each 200.00 200.00 1.00 1.00        
202-02-09 removal of 12.2 m x 5.5 m shop on slab (rt. of sta.
51+860.9)
1      each 3,000.00 3,000.00 1.00 1.00        
202-02-10 removal of 9.6 m x 7.7 m wood frame building (rt. of
sta. 51+870.4)
1      each 3,000.00 3,000.00 1.00 1.00        
202-02-11 removal of 4.9 m x 3.7 m portable building (rt. of
sta. 51+887.2)
1      each 500.00 500.00 1.00 1.00        
202-02-12 removal of 3.8 m x 2.1 m portable building (rt. of
sta. 51+893.4)
1      each 300.00 300.00 1.00 1.00        
202-02-13 removal of 12.4 m x 3.6 m mobile home (rt. of sta.
51+918.5)(contains non-friable asbestos)
1      each 500.00 500.00 1.00 1.00        
202-02-14 removal of 14.1 m x 7.7 m mobile home (rt. of sta.
51+924.9)
1      each 1,000.00 1,000.00 1.00 1.00        
202-02-15 removal of 2.5 m x 2.5 m storage shed (rt. of sta.
51+933.5)
1      each 1,000.00 1,000.00 1.00 1.00        
202-02-16 removal of 4.9 m x 3.7 m portable building (lt. of
sta. 52+294.7)
1      each 1,000.00 1,000.00 1.00 1.00        
202-02-17 removal of 33.8 m x 22.2 m brick building (lt. of sta.
52+537.5) (contains non-friable asbestos)
1      each 5,000.00 5,000.00 1.00 1.00        
202-02-18 removal of 12.3 m x 8.8 m brick residence (rt. of sta.
52+369.1) (contains non-friable asbestos)
1      each 4,000.00 4,000.00 1.00 1.00        
202-02-19 removal of 14.9 m x 7.9 m brick residence (lt. of sta.
52+689.5)
1      each 4,000.00 4,000.00 1.00 1.00        
202-02-20 removal of 6.1 m x 4.3 m wood shed (rt. of sta.
52+683.2)
1      each 300.00 300.00 1.00 1.00        
202-02-21 removal of 15.2 m x 8.9 m brick residence (lt. of sta.
52+818.1)
1      each 5,000.00 5,000.00 1.00 1.00        
202-02-22 removal of 22.0 m x 9.7 m wood frame residence (rt. of
sta. 52+933.2) (contains non-friable asbestos)
1      each 2,000.00 2,000.00 1.00 1.00        
202-02-23 removal of 2.4 m x 10.0 m mobile home (rt. of sta.
53+058.0)
1      each 300.00 300.00 1.00 1.00        
202-02-24 removal of 2.5 m x 7.9 m mobile home (rt. of sta.
53+065.9)
1      each 1,000.00 1,000.00 1.00 1.00        
202-02-25 removal of 3.6 m x 12.9 m mobile home (rt. of sta.
53+114.6)
1      each 1,000.00 1,000.00 1.00 1.00        
202-02-26 removal of 4.2 m x 23.3 m mobile home (rt. of sta.
53+117.8)
1      each 1,000.00 1,000.00 1.00 1.00        
202-02-27 removal of 3.7 m x 3.2 m shed (rt. of sta. 53+130.2) 1      each 200.00 200.00 1.00 1.00        
202-02-28 removal of 3.8 m x 12.2 m mobile home (rt. of sta.
53+172.8)
1      each 500.00 500.00 1.00 1.00        
202-02-29 removal of 30.5 m x 15.8 m wood frame building (rt. of
sta. 53+210.8)
1      each 6,000.00 6,000.00 1.00 1.00        
202-02-30 removal of 12.2 m x 8.3 m brick building (rt. of sta.
53+346.3) (contains non-friable asbestos)
1      each 2,000.00 2,000.00 1.00 1.00        
202-02-31 removal of 19.1 m x 12.4 m wood frame residence (rt.
of sta. 53+821.8) (contains non-friable asbestos)
1      each 3,000.00 3,000.00 1.00 1.00        
202-02-32 removal of 13.0 m x 8.7 m wood frame residence (lt. of
sta. 53+845.5) (contains non-friable asbestos)
1      each 3,000.00 3,000.00 1.00 1.00        
202-02-33 removal of 20.7 m x 9.1 m wood frame residence (rt. of
sta. 53+887.6)
1      each 4,000.00 4,000.00 1.00 1.00        
202-02-34 removal of 3.6 m x 17. 1 m mobile home (rt. of sta.
1+063.1 - barmore road)(contains friable asbestos)
1      each 200.00 200.00 1.00 1.00        
202-02-35 removal of 5.4 m x 4.0 m shed (rt. of sta. 1+068.2 -
barmore road)
1      each 200.00 200.00 1.00 1.00        
202-02-36 removal of 3.3 m x 12. 5 m mobile home (rt. of sta.
1+084.8 - barmore road)(contains friable asbestos)
1      each 200.00 200.00 1.00 1.00        
202-02-37 removal of 14.2 m x 4.3 m mobile home (rt. of sta.
1+097.0 - barmore road)
1      each 300.00 300.00 1.00 1.00        
203-01 general excavation 460,063      cu m 2.60 1,196,163.80 5.00 2,300,315.00        
203-02 drainage excavation 37,662      cu m 13.00 489,606.00 6.00 225,972.00        
203-03 muck excavation 2,002      cu m 15.00 30,030.00 6.00 12,012.00        
203-04 embankment 214,292      cu m 3.85 825,024.20 4.00 857,168.00        
204-05-A temporary sediment check dams (hay) 125      ea 80.00 10,000.00 150.00 18,750.00        
204-05-B temporary sediment check dams (stone) 125      ea 250.00 31,250.00 500.00 62,500.00        
204-06 temporary silt fencing 3,658      ln m 6.00 21,948.00 4.25 15,546.50        
204-07 temporary stone construction entrance 4      ea 5,000.00 20,000.00 2,500.00 10,000.00        
302-02-B-01 class ii base course (220 mm thick)(stone or recylcled
pccp)
3,941.6    sq m 35.00 137,956.00 33.00 130,072.80        
304-01 lime 526.64   Mg 140.00 73,729.60 155.00 81,629.20        
304-04-D lime treatment (type d) (300 mm thick) 34,831      sq m 1.50 52,246.50 1.80 62,695.80        
401-02 aggregate surface course (adjusted vehicular
measurement)
474      cu m 60.00 28,440.00 125.00 59,250.00        
402-01 traffic maintenance aggregate (vehicular measurement) 2,500.0    cu m 30.00 75,000.00 95.00 237,500.00        
502-01 superpave asphaltic concrete 681.2    Mg 150.00 102,180.00 150.00 102,180.00        
502-01-A superpave asphaltic concrete, paved drives,turnouts
and miscellaneous
1,792.8    Mg 150.00 268,920.00 150.00 268,920.00        
701-01-I cross drain pipe (600 mm rcp/pcp) 271.0    ln m 200.00 54,200.00 450.00 121,950.00        
701-01-N cross drain pipe (1050 mm rcp/pcp) 77.0    ln m 640.00 49,280.00 650.00 50,050.00        
701-01-O cross drain pipe (1200 mm rcp/pcp) 85.0    ln m 730.00 62,050.00 700.00 59,500.00        
701-02-G cross drain pipe arch (1050 mm equiv. rcpa) 61.0    ln m 550.00 33,550.00 800.00 48,800.00        
701-05-G side drain pipe (450 mm rcp/pcp) 732.5    ln m 150.00 109,875.00 110.00 80,575.00        
701-05-I side drain pipe (600 mm rcp/pcp) 376.5    ln m 190.00 71,535.00 120.00 45,180.00        
701-05-I-01 side drain pipe (600 mm rcp/pcp)(erosion) 38.0    ln m 170.00 6,460.00 200.00 7,600.00        
701-05-K side drain pipe (750 mm rcp/pcp)(erosion) 84.5    ln m 300.00 25,350.00 215.00 18,167.50        
702-02-C manholes (r-cb-11 mod) 1      ea 6,000.00 6,000.00 9,000.00 9,000.00        
702-03-A catch basins (cb-01) 16      ea 5,000.00 80,000.00 6,000.00 96,000.00        
703-03 perforated pipe underdrains (150 mm diameter) 225      ln m 110.00 24,750.00 170.00 38,250.00        
703-04 nonperforated pipe underdrains (150 mm diameter) 75      ln m 110.00 8,250.00 160.00 12,000.00        
704-03 blocked out guard rail 266.70   ln m 60.00 16,002.00 58.00 15,468.60        
704-08-B guard rail transitions (double thrie beam) 60.96   ln m 60.00 3,657.60 140.00 8,534.40        
704-11-A guard rail end treatment (flared) 8      ea 2,000.00 16,000.00 1,950.00 15,600.00        
705-01 barbed wire fence 1,328      ln m 16.50 21,912.00 18.00 23,904.00        
705-04 single swinging driveway gates 3      ea 500.00 1,500.00 500.00 1,500.00        
705-06-A chain link fence (1200 mm height) 405      ln m 50.00 20,250.00 60.00 24,300.00        
705-06-C chain link fence (1800 mm height) 276      ln m 65.00 17,940.00 70.00 19,320.00        
705-07-A 4.0-meter single gates for chain link fence (1200 mm
height)
4      ea 650.00 2,600.00 750.00 3,000.00        
705-09 rebuilt fence 14      ln m 80.00 1,120.00 100.00 1,400.00        
706-02-C concrete drive (150 mm thick) 620.9    sq m 55.00 34,149.50 55.00 34,149.50        
708-01 right-of-way monument 104      ea 200.00 20,800.00 125.00 13,000.00        
708-02 right-of-way monument witness post 104      ea 200.00 20,800.00 85.00 8,840.00        
711-01-D riprap (25 kg, 460 mm thick) 57      sq m 100.00 5,700.00 200.00 11,400.00        
711-04 geotextile fabric 57      sq m 6.00 342.00 3.00 171.00        
712-04 flexible revetment 2,715      sq m 80.00 217,200.00 60.00 162,900.00        
713-01 temporary signs & barricades lump      lump 60,000.00 60,000.00 750,000.00 750,000.00        
713-05-A temporary pavement markings (solid line)(100 mm width) 14.200  km 310.00 4,402.00 850.00 12,070.00        
713-06-A temporary pavement legends and symbols (arrow) 4      ea 50.00 200.00 100.00 400.00        
713-06-C temporary pavement legends and symbols (only) 4      ea 50.00 200.00 100.00 400.00        
716-01-A mulch (vegetative) 52.9    hctr 1,600.00 84,640.00 615.00 32,533.50        
717-01 seeding 1,587      kg 14.00 22,218.00 26.00 41,262.00        
718-01 fertilizer 26,136      kg 1.00 26,136.00 0.89 23,261.04        
720-01-A erosion control system, slope protection (type a) 9,647      sq m 1.50 14,470.50 1.50 14,470.50        
720-01-C erosion control system, flexible channel liner (type c) 540      sq m 1.50 810.00 2.00 1,080.00        
720-01-D erosion control system, flexible channel liner (type d) 3,728      sq m 1.50 5,592.00 1.50 5,592.00        
720-01-E erosion control system, flexible channel liner (type e) 328      sq m 3.00 984.00 5.00 1,640.00        
720-01-F erosion control system, flexible channel liner (type f) 48      sq m 5.00 240.00 5.00 240.00        
722-02 project site laboratory (equipped) 1      ea 15,000.00 15,000.00 30,000.00 30,000.00        
724-02 pavement widening 781.0    sq m 115.00 89,815.00 85.00 66,385.00        
725-01 temporary detour roads 1,066.5    ln m 425.00 453,262.50 500.00 533,250.00        
726-01 bedding material 392.4    cu m 90.00 35,316.00 150.00 58,860.00        
727-01 mobilization lump      lump 1,000,000.00 1,000,000.00 1,850,000.00 1,850,000.00        
729-16-C object marker assembly (type 3) 4      ea 70.00 280.00 70.00 280.00        
729-19-A dead end road installation (type a) 1      ea 1,250.00 1,250.00 1,250.00 1,250.00        
731-01 nonreflectorized raised pavement markers 240      ea 10.00 2,400.00 12.00 2,880.00        
731-02 reflectorized raised pavement markers 975      ea 5.00 4,875.00 6.25 6,093.75        
732-01-C plastic pavement striping (200 mm width) 160      ln m 3.50 560.00 25.00 4,000.00        
732-02-A plastic pavement striping (solid line)(100 mm width) 14.483  km 1,325.00 19,189.97 1,800.00 26,069.40        
732-04-A plastic pavement legends & symbols (arrow) 5      ea 200.00 1,000.00 275.00 1,375.00        
732-04-C plastic pavement legends & symbols (only) 5      ea 200.00 1,000.00 275.00 1,375.00        
735-01 mailboxes 34      ea 5.00 170.00 5.00 170.00        
735-02 mailbox supports (single) 34      ea 150.00 5,100.00 125.00 4,250.00        
740-01 construction layout lump      lump 100,000.00 100,000.00 200,000.00 200,000.00        
744-01 traffic control management lump      lump 10,000.00 10,000.00 200,000.00 200,000.00        
804-01-D precast concrete piles (450 mm) 5,040.0    ln m 200.00 1,008,000.00 200.00 1,008,000.00        
804-05 precast concrete test piles 2      ea 35,000.00 70,000.00 35,000.00 70,000.00        
804-09 loading test piles 2      ea 2,000.00 4,000.00 2,000.00 4,000.00        
804-10 reloading test piles 2      ea 1,000.00 2,000.00 1,000.00 2,000.00        
804-11 redriving test piles 2      ea 1,000.00 2,000.00 1,000.00 2,000.00        
804-12 loading permanent piles 2      ea 1,000.00 2,000.00 15,000.00 30,000.00        
804-17 dynamic monitoring 6      ea 1,500.00 9,000.00 5,000.00 30,000.00        
805-01-F class a concrete (bents) 422.40   cu m 650.00 274,560.00 750.00 316,800.00        
805-03 class aa concrete 1,920.80   cu m 420.00 806,736.00 640.00 1,229,312.00        
806-01 deformed reinforcing steel 42,900      kg 1.50 64,350.00 2.00 85,800.00        
806-02 deformed reinforcing steel (epoxy coated) 192,500      kg 2.00 385,000.00 2.25 433,125.00        
810-01 concrete railing (barrier) 840.00   ln m 140.00 117,600.00 200.00 168,000.00        
813-01 concrete approach slabs 590.40   sq m 165.00 97,416.00 250.00 147,600.00        
S-001 plugging existing water wells 4      each 1,500.00 6,000.00 1,500.00 6,000.00        
S-002 rumble strips (ground-in) 13.6    km 370.00 5,032.00 700.00 9,520.00        
S-101 dynamic analysis 6      ea 750.00 4,500.00 2,000.00 12,000.00        
 SUBTOTAL GENERAL       10,143,128.17   14,005,187.49        
                       
ALTERNATE A                      
                       
ALTERNATE A1                      
302-02-E-01 class ii base course (100 mm thick)(stone or recycled
pccp)
71,378.0    sq m 11.50 820,847.00 14.00 999,292.00        
302-02-F-01 class ii base course (200 mm thick)(stone or recycled
pccp)
26,138.0    sq m 18.00 470,484.00 30.00 784,140.00        
302-02-F-02 class ii base course (200 mm thick)(soil cement) 71,378.0    sq m 8.50 606,713.00 12.80 913,638.40        
302-02-G-01 class ii base course (50 mm thick)(selected soils) 97,516.0    sq m 1.00 97,516.00 0.50 48,758.00        
502-01 superpave asphaltic concrete 26,340.9    Mg 73.00 1,922,885.70 73.00 1,922,885.70        
732-03-A plastic pavement striping (broken line)(100 mm width) 7.600  km 500.00 3,800.00 800.00 6,080.00        
 SUBTOTAL ALT A1       3,922,245.70   4,674,794.10        
                       
ALTERNATE A2                      
302-02-C-01 class ii base course (250 mm thick)(stone or recycled
pccp)
26,138.0    sq m 0.00 0.00 0.00 0.00        
302-02-E-01 class ii base course (100 mm thick)(stone or recycled
pccp)
71,378.0    sq m 0.00 0.00 0.00 0.00        
302-02-F-02 class ii base course (200 mm thick)(soil cement) 71,378.0    sq m 0.00 0.00 0.00 0.00        
502-01 superpave asphaltic concrete 2,896.8    Mg 0.00 0.00 0.00 0.00        
601-01-G portland cement concrete pavement (200 mm thick) 61,912.3    sq m 0.00 0.00 0.00 0.00        
601-02-G portland cement concrete pavement (200 mm thick)
(crossovers and turnouts)
4,642.9    sq m 0.00 0.00 0.00 0.00        
601-04 portland cement concrete pavement coring 78      ea 0.00 0.00 0.00 0.00        
732-03-A-01 plastic pavement striping (broken line)(100 mm width)
(preformed marking tape - type v)
7.600  km 0.00 0.00 0.00 0.00        
                       
 CONTRACTOR TOTAL       14,065,373.87   18,679,981.59        