| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JAMES CONSTRUCTION GROUP LLC |
- 2 - HIGHWAY SPECIALISTS INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
lump |
200,000.00 |
200,000.00 |
250,000.00 |
250,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
30,000.00 |
30,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge (sta. 50+690; 8.53 m x 60.96 m
concrete slab bridge) |
1   |
each |
35,000.00 |
35,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 202-02-A-02 |
removal of bridge (sta. 50+906; 8.53 m x 36.58 m
concrete slab bridge) |
1   |
each |
25,000.00 |
25,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 202-02-B-01 |
removal of concrete box culverts (sta. 50+578.4;
1219 mm x 1219 mm x 22 m) |
1   |
each |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 202-02-B-02 |
removal of concrete box culverts (sta. 52+099.2;
914 mm x 610 mm x 32 m) |
1   |
each |
3,500.00 |
3,500.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 202-02-B-03 |
removal of concrete box culverts (sta. 52+740.8;
1219 mm x 610 mm x 22 m) |
1   |
each |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
50,391   |
sq m |
10.00 |
503,910.00 |
9.00 |
453,519.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks and drives
|
413   |
sq m |
7.00 |
2,891.00 |
14.00 |
5,782.00 |
|
|
|
|
| 202-02-G |
removal of surfacing and stabilized base
|
24,363.0 |
sq m |
5.00 |
121,815.00 |
6.00 |
146,178.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
592   |
ln m |
20.00 |
11,840.00 |
18.00 |
10,656.00 |
|
|
|
|
| 202-02-I |
removal of safety end treatment
|
64   |
each |
300.00 |
19,200.00 |
400.00 |
25,600.00 |
|
|
|
|
| 202-02-01 |
removal of 14.9 m x 11.7 m brick residence (lt. of
sta. 51+300.0) |
1   |
each |
4,000.00 |
4,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-02 |
removal of 5.0 m x 7.5 m wood frame shed (lt. of sta.
51+340.3) |
1   |
each |
200.00 |
200.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-03 |
removal of 12.3 m x 9.2 m wood frame residence (lt. of
sta. 51+371.5) |
1   |
each |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-04 |
removal of 10.0 m x 17.3 m wood frame residence (lt.
of sta. 51+377.5) (contains non-friable asbestos) |
1   |
each |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-05 |
removal of 10.0 m x 11.0 m wood frame building (rt. of
sta. 51+414.9) |
1   |
each |
1,000.00 |
1,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-06 |
removal of 12.2 m x 15.2 m shop on slab (lt. of sta.
51+810.3) |
1   |
each |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-07 |
removal of 14.7 m x 14.2 m residence (rt. of sta.
51+827.1)(contains friable asbestos) |
1   |
each |
6,000.00 |
6,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-08 |
removal of 3.4 m x 3.7 m wood shed (rt. of sta.
51+857.4) |
1   |
each |
200.00 |
200.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-09 |
removal of 12.2 m x 5.5 m shop on slab (rt. of sta.
51+860.9) |
1   |
each |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-10 |
removal of 9.6 m x 7.7 m wood frame building (rt. of
sta. 51+870.4) |
1   |
each |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-11 |
removal of 4.9 m x 3.7 m portable building (rt. of
sta. 51+887.2) |
1   |
each |
500.00 |
500.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-12 |
removal of 3.8 m x 2.1 m portable building (rt. of
sta. 51+893.4) |
1   |
each |
300.00 |
300.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-13 |
removal of 12.4 m x 3.6 m mobile home (rt. of sta.
51+918.5)(contains non-friable asbestos) |
1   |
each |
500.00 |
500.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-14 |
removal of 14.1 m x 7.7 m mobile home (rt. of sta.
51+924.9) |
1   |
each |
1,000.00 |
1,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-15 |
removal of 2.5 m x 2.5 m storage shed (rt. of sta.
51+933.5) |
1   |
each |
1,000.00 |
1,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-16 |
removal of 4.9 m x 3.7 m portable building (lt. of
sta. 52+294.7) |
1   |
each |
1,000.00 |
1,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-17 |
removal of 33.8 m x 22.2 m brick building (lt. of sta.
52+537.5) (contains non-friable asbestos) |
1   |
each |
5,000.00 |
5,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-18 |
removal of 12.3 m x 8.8 m brick residence (rt. of sta.
52+369.1) (contains non-friable asbestos) |
1   |
each |
4,000.00 |
4,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-19 |
removal of 14.9 m x 7.9 m brick residence (lt. of sta.
52+689.5) |
1   |
each |
4,000.00 |
4,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-20 |
removal of 6.1 m x 4.3 m wood shed (rt. of sta.
52+683.2) |
1   |
each |
300.00 |
300.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-21 |
removal of 15.2 m x 8.9 m brick residence (lt. of sta.
52+818.1) |
1   |
each |
5,000.00 |
5,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-22 |
removal of 22.0 m x 9.7 m wood frame residence (rt. of
sta. 52+933.2) (contains non-friable asbestos) |
1   |
each |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-23 |
removal of 2.4 m x 10.0 m mobile home (rt. of sta.
53+058.0) |
1   |
each |
300.00 |
300.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-24 |
removal of 2.5 m x 7.9 m mobile home (rt. of sta.
53+065.9) |
1   |
each |
1,000.00 |
1,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-25 |
removal of 3.6 m x 12.9 m mobile home (rt. of sta.
53+114.6) |
1   |
each |
1,000.00 |
1,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-26 |
removal of 4.2 m x 23.3 m mobile home (rt. of sta.
53+117.8) |
1   |
each |
1,000.00 |
1,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-27 |
removal of 3.7 m x 3.2 m shed (rt. of sta. 53+130.2)
|
1   |
each |
200.00 |
200.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-28 |
removal of 3.8 m x 12.2 m mobile home (rt. of sta.
53+172.8) |
1   |
each |
500.00 |
500.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-29 |
removal of 30.5 m x 15.8 m wood frame building (rt. of
sta. 53+210.8) |
1   |
each |
6,000.00 |
6,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-30 |
removal of 12.2 m x 8.3 m brick building (rt. of sta.
53+346.3) (contains non-friable asbestos) |
1   |
each |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-31 |
removal of 19.1 m x 12.4 m wood frame residence (rt.
of sta. 53+821.8) (contains non-friable asbestos) |
1   |
each |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-32 |
removal of 13.0 m x 8.7 m wood frame residence (lt. of
sta. 53+845.5) (contains non-friable asbestos) |
1   |
each |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-33 |
removal of 20.7 m x 9.1 m wood frame residence (rt. of
sta. 53+887.6) |
1   |
each |
4,000.00 |
4,000.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-34 |
removal of 3.6 m x 17. 1 m mobile home (rt. of sta.
1+063.1 - barmore road)(contains friable asbestos) |
1   |
each |
200.00 |
200.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-35 |
removal of 5.4 m x 4.0 m shed (rt. of sta. 1+068.2 -
barmore road) |
1   |
each |
200.00 |
200.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-36 |
removal of 3.3 m x 12. 5 m mobile home (rt. of sta.
1+084.8 - barmore road)(contains friable asbestos) |
1   |
each |
200.00 |
200.00 |
1.00 |
1.00 |
|
|
|
|
| 202-02-37 |
removal of 14.2 m x 4.3 m mobile home (rt. of sta.
1+097.0 - barmore road) |
1   |
each |
300.00 |
300.00 |
1.00 |
1.00 |
|
|
|
|
| 203-01 |
general excavation
|
460,063   |
cu m |
2.60 |
1,196,163.80 |
5.00 |
2,300,315.00 |
|
|
|
|
| 203-02 |
drainage excavation
|
37,662   |
cu m |
13.00 |
489,606.00 |
6.00 |
225,972.00 |
|
|
|
|
| 203-03 |
muck excavation
|
2,002   |
cu m |
15.00 |
30,030.00 |
6.00 |
12,012.00 |
|
|
|
|
| 203-04 |
embankment
|
214,292   |
cu m |
3.85 |
825,024.20 |
4.00 |
857,168.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
125   |
ea |
80.00 |
10,000.00 |
150.00 |
18,750.00 |
|
|
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
125   |
ea |
250.00 |
31,250.00 |
500.00 |
62,500.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
3,658   |
ln m |
6.00 |
21,948.00 |
4.25 |
15,546.50 |
|
|
|
|
| 204-07 |
temporary stone construction entrance
|
4   |
ea |
5,000.00 |
20,000.00 |
2,500.00 |
10,000.00 |
|
|
|
|
| 302-02-B-01 |
class ii base course (220 mm thick)(stone or recylcled
pccp) |
3,941.6 |
sq m |
35.00 |
137,956.00 |
33.00 |
130,072.80 |
|
|
|
|
| 304-01 |
lime
|
526.64 |
Mg |
140.00 |
73,729.60 |
155.00 |
81,629.20 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (300 mm thick)
|
34,831   |
sq m |
1.50 |
52,246.50 |
1.80 |
62,695.80 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
474   |
cu m |
60.00 |
28,440.00 |
125.00 |
59,250.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
2,500.0 |
cu m |
30.00 |
75,000.00 |
95.00 |
237,500.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
681.2 |
Mg |
150.00 |
102,180.00 |
150.00 |
102,180.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives,turnouts
and miscellaneous |
1,792.8 |
Mg |
150.00 |
268,920.00 |
150.00 |
268,920.00 |
|
|
|
|
| 701-01-I |
cross drain pipe (600 mm rcp/pcp)
|
271.0 |
ln m |
200.00 |
54,200.00 |
450.00 |
121,950.00 |
|
|
|
|
| 701-01-N |
cross drain pipe (1050 mm rcp/pcp)
|
77.0 |
ln m |
640.00 |
49,280.00 |
650.00 |
50,050.00 |
|
|
|
|
| 701-01-O |
cross drain pipe (1200 mm rcp/pcp)
|
85.0 |
ln m |
730.00 |
62,050.00 |
700.00 |
59,500.00 |
|
|
|
|
| 701-02-G |
cross drain pipe arch (1050 mm equiv. rcpa)
|
61.0 |
ln m |
550.00 |
33,550.00 |
800.00 |
48,800.00 |
|
|
|
|
| 701-05-G |
side drain pipe (450 mm rcp/pcp)
|
732.5 |
ln m |
150.00 |
109,875.00 |
110.00 |
80,575.00 |
|
|
|
|
| 701-05-I |
side drain pipe (600 mm rcp/pcp)
|
376.5 |
ln m |
190.00 |
71,535.00 |
120.00 |
45,180.00 |
|
|
|
|
| 701-05-I-01 |
side drain pipe (600 mm rcp/pcp)(erosion)
|
38.0 |
ln m |
170.00 |
6,460.00 |
200.00 |
7,600.00 |
|
|
|
|
| 701-05-K |
side drain pipe (750 mm rcp/pcp)(erosion)
|
84.5 |
ln m |
300.00 |
25,350.00 |
215.00 |
18,167.50 |
|
|
|
|
| 702-02-C |
manholes (r-cb-11 mod)
|
1   |
ea |
6,000.00 |
6,000.00 |
9,000.00 |
9,000.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
16   |
ea |
5,000.00 |
80,000.00 |
6,000.00 |
96,000.00 |
|
|
|
|
| 703-03 |
perforated pipe underdrains (150 mm diameter)
|
225   |
ln m |
110.00 |
24,750.00 |
170.00 |
38,250.00 |
|
|
|
|
| 703-04 |
nonperforated pipe underdrains (150 mm diameter)
|
75   |
ln m |
110.00 |
8,250.00 |
160.00 |
12,000.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
266.70 |
ln m |
60.00 |
16,002.00 |
58.00 |
15,468.60 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
60.96 |
ln m |
60.00 |
3,657.60 |
140.00 |
8,534.40 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
8   |
ea |
2,000.00 |
16,000.00 |
1,950.00 |
15,600.00 |
|
|
|
|
| 705-01 |
barbed wire fence
|
1,328   |
ln m |
16.50 |
21,912.00 |
18.00 |
23,904.00 |
|
|
|
|
| 705-04 |
single swinging driveway gates
|
3   |
ea |
500.00 |
1,500.00 |
500.00 |
1,500.00 |
|
|
|
|
| 705-06-A |
chain link fence (1200 mm height)
|
405   |
ln m |
50.00 |
20,250.00 |
60.00 |
24,300.00 |
|
|
|
|
| 705-06-C |
chain link fence (1800 mm height)
|
276   |
ln m |
65.00 |
17,940.00 |
70.00 |
19,320.00 |
|
|
|
|
| 705-07-A |
4.0-meter single gates for chain link fence (1200 mm
height) |
4   |
ea |
650.00 |
2,600.00 |
750.00 |
3,000.00 |
|
|
|
|
| 705-09 |
rebuilt fence
|
14   |
ln m |
80.00 |
1,120.00 |
100.00 |
1,400.00 |
|
|
|
|
| 706-02-C |
concrete drive (150 mm thick)
|
620.9 |
sq m |
55.00 |
34,149.50 |
55.00 |
34,149.50 |
|
|
|
|
| 708-01 |
right-of-way monument
|
104   |
ea |
200.00 |
20,800.00 |
125.00 |
13,000.00 |
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
104   |
ea |
200.00 |
20,800.00 |
85.00 |
8,840.00 |
|
|
|
|
| 711-01-D |
riprap (25 kg, 460 mm thick)
|
57   |
sq m |
100.00 |
5,700.00 |
200.00 |
11,400.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
57   |
sq m |
6.00 |
342.00 |
3.00 |
171.00 |
|
|
|
|
| 712-04 |
flexible revetment
|
2,715   |
sq m |
80.00 |
217,200.00 |
60.00 |
162,900.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
60,000.00 |
60,000.00 |
750,000.00 |
750,000.00 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(100 mm width)
|
14.200 |
km |
310.00 |
4,402.00 |
850.00 |
12,070.00 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
4   |
ea |
50.00 |
200.00 |
100.00 |
400.00 |
|
|
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
4   |
ea |
50.00 |
200.00 |
100.00 |
400.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
52.9 |
hctr |
1,600.00 |
84,640.00 |
615.00 |
32,533.50 |
|
|
|
|
| 717-01 |
seeding
|
1,587   |
kg |
14.00 |
22,218.00 |
26.00 |
41,262.00 |
|
|
|
|
| 718-01 |
fertilizer
|
26,136   |
kg |
1.00 |
26,136.00 |
0.89 |
23,261.04 |
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
9,647   |
sq m |
1.50 |
14,470.50 |
1.50 |
14,470.50 |
|
|
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
540   |
sq m |
1.50 |
810.00 |
2.00 |
1,080.00 |
|
|
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
3,728   |
sq m |
1.50 |
5,592.00 |
1.50 |
5,592.00 |
|
|
|
|
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
328   |
sq m |
3.00 |
984.00 |
5.00 |
1,640.00 |
|
|
|
|
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
48   |
sq m |
5.00 |
240.00 |
5.00 |
240.00 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
ea |
15,000.00 |
15,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 724-02 |
pavement widening
|
781.0 |
sq m |
115.00 |
89,815.00 |
85.00 |
66,385.00 |
|
|
|
|
| 725-01 |
temporary detour roads
|
1,066.5 |
ln m |
425.00 |
453,262.50 |
500.00 |
533,250.00 |
|
|
|
|
| 726-01 |
bedding material
|
392.4 |
cu m |
90.00 |
35,316.00 |
150.00 |
58,860.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
lump |
1,000,000.00 |
1,000,000.00 |
1,850,000.00 |
1,850,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
ea |
70.00 |
280.00 |
70.00 |
280.00 |
|
|
|
|
| 729-19-A |
dead end road installation (type a)
|
1   |
ea |
1,250.00 |
1,250.00 |
1,250.00 |
1,250.00 |
|
|
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
240   |
ea |
10.00 |
2,400.00 |
12.00 |
2,880.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
975   |
ea |
5.00 |
4,875.00 |
6.25 |
6,093.75 |
|
|
|
|
| 732-01-C |
plastic pavement striping (200 mm width)
|
160   |
ln m |
3.50 |
560.00 |
25.00 |
4,000.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
14.483 |
km |
1,325.00 |
19,189.97 |
1,800.00 |
26,069.40 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
5   |
ea |
200.00 |
1,000.00 |
275.00 |
1,375.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
5   |
ea |
200.00 |
1,000.00 |
275.00 |
1,375.00 |
|
|
|
|
| 735-01 |
mailboxes
|
34   |
ea |
5.00 |
170.00 |
5.00 |
170.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
34   |
ea |
150.00 |
5,100.00 |
125.00 |
4,250.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
lump |
100,000.00 |
100,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
lump |
10,000.00 |
10,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 804-01-D |
precast concrete piles (450 mm)
|
5,040.0 |
ln m |
200.00 |
1,008,000.00 |
200.00 |
1,008,000.00 |
|
|
|
|
| 804-05 |
precast concrete test piles
|
2   |
ea |
35,000.00 |
70,000.00 |
35,000.00 |
70,000.00 |
|
|
|
|
| 804-09 |
loading test piles
|
2   |
ea |
2,000.00 |
4,000.00 |
2,000.00 |
4,000.00 |
|
|
|
|
| 804-10 |
reloading test piles
|
2   |
ea |
1,000.00 |
2,000.00 |
1,000.00 |
2,000.00 |
|
|
|
|
| 804-11 |
redriving test piles
|
2   |
ea |
1,000.00 |
2,000.00 |
1,000.00 |
2,000.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
2   |
ea |
1,000.00 |
2,000.00 |
15,000.00 |
30,000.00 |
|
|
|
|
| 804-17 |
dynamic monitoring
|
6   |
ea |
1,500.00 |
9,000.00 |
5,000.00 |
30,000.00 |
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
422.40 |
cu m |
650.00 |
274,560.00 |
750.00 |
316,800.00 |
|
|
|
|
| 805-03 |
class aa concrete
|
1,920.80 |
cu m |
420.00 |
806,736.00 |
640.00 |
1,229,312.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
42,900   |
kg |
1.50 |
64,350.00 |
2.00 |
85,800.00 |
|
|
|
|
| 806-02 |
deformed reinforcing steel (epoxy coated)
|
192,500   |
kg |
2.00 |
385,000.00 |
2.25 |
433,125.00 |
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
840.00 |
ln m |
140.00 |
117,600.00 |
200.00 |
168,000.00 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
590.40 |
sq m |
165.00 |
97,416.00 |
250.00 |
147,600.00 |
|
|
|
|
| S-001 |
plugging existing water wells
|
4   |
each |
1,500.00 |
6,000.00 |
1,500.00 |
6,000.00 |
|
|
|
|
| S-002 |
rumble strips (ground-in)
|
13.6 |
km |
370.00 |
5,032.00 |
700.00 |
9,520.00 |
|
|
|
|
| S-101 |
dynamic analysis
|
6   |
ea |
750.00 |
4,500.00 |
2,000.00 |
12,000.00 |
|
|
|
|
| | SUBTOTAL GENERAL |
|
|
|
10,143,128.17 |
|
14,005,187.49 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
|
|
|
|
|
|
|
|
|
|
|
| 302-02-E-01 |
class ii base course (100 mm thick)(stone or recycled
pccp) |
71,378.0 |
sq m |
11.50 |
820,847.00 |
14.00 |
999,292.00 |
|
|
|
|
| 302-02-F-01 |
class ii base course (200 mm thick)(stone or recycled
pccp) |
26,138.0 |
sq m |
18.00 |
470,484.00 |
30.00 |
784,140.00 |
|
|
|
|
| 302-02-F-02 |
class ii base course (200 mm thick)(soil cement)
|
71,378.0 |
sq m |
8.50 |
606,713.00 |
12.80 |
913,638.40 |
|
|
|
|
| 302-02-G-01 |
class ii base course (50 mm thick)(selected soils)
|
97,516.0 |
sq m |
1.00 |
97,516.00 |
0.50 |
48,758.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
26,340.9 |
Mg |
73.00 |
1,922,885.70 |
73.00 |
1,922,885.70 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
7.600 |
km |
500.00 |
3,800.00 |
800.00 |
6,080.00 |
|
|
|
|
| | SUBTOTAL ALT A1 |
|
|
|
3,922,245.70 |
|
4,674,794.10 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
|
|
|
|
|
|
|
|
|
|
|
| 302-02-C-01 |
class ii base course (250 mm thick)(stone or recycled
pccp) |
26,138.0 |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 302-02-E-01 |
class ii base course (100 mm thick)(stone or recycled
pccp) |
71,378.0 |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 302-02-F-02 |
class ii base course (200 mm thick)(soil cement)
|
71,378.0 |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,896.8 |
Mg |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 601-01-G |
portland cement concrete pavement (200 mm thick)
|
61,912.3 |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 601-02-G |
portland cement concrete pavement (200 mm thick)
(crossovers and turnouts) |
4,642.9 |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 601-04 |
portland cement concrete pavement coring
|
78   |
ea |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 732-03-A-01 |
plastic pavement striping (broken line)(100 mm width)
(preformed marking tape - type v) |
7.600 |
km |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
14,065,373.87 |
|
18,679,981.59 |
|
|
|
|
|