Letting of 10/26/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-29-0101
Parish: LAFOURCHE
Routes:
Description: ST. JOHN BRIDGE OVER BAYOU LAFOURCHE
Type Const: grading, class ii base course, superpave asphaltic concrete pavement, concrete
slab span bridge and related work.
 
RankLicenseBidderAmount
100481 COASTAL BRIDGE CO., L.L.C. $492,566.00
202109 CHAMBERS CONSTRUCTION CO., INC. $572,612.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
COASTAL BRIDGE CO., L.L.C.
- 2 -
CHAMBERS CONSTRUCTION CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 20,000.00 20,000.00 5,000.00 5,000.00        
202-02-A-01 removal of bridge (sta. 102+36.26, 24' w x 152' l,
concrete bridge)
1      EACH 20,000.00 20,000.00 25,000.00 25,000.00        
202-02-C removal of portland cement concrete pavement 1,044      SQYD 8.00 8,352.00 12.00 12,528.00        
203-06 excavation & embankment lump      LUMP 13,000.00 13,000.00 30,000.00 30,000.00        
204-02 temporary hay or straw bales 25      EACH 1.00 25.00 25.00 625.00        
204-03 temporary slope drains 240      LNFT 1.00 240.00 3.00 720.00        
204-05-A temporary sediment check dams (hay) 4      EACH 100.00 400.00 125.00 500.00        
204-06 temporary silt fencing 550      LNFT 1.00 550.00 2.00 1,100.00        
302-01-A class ii base course(stone or recycled pccp) 197.8    CUYD 95.00 18,791.00 125.00 24,725.00        
502-01 superpave asphaltic concrete 223.2    TON 140.00 31,248.00 220.00 49,104.00        
704-11-A guard rail end treatment (flared) 4      EACH 2,500.00 10,000.00 3,000.00 12,000.00        
711-01-C riprap (30 lb., 14" thick) 470      SQYD 54.00 25,380.00 50.00 23,500.00        
711-04 geotextile fabric 470      SQYD 2.00 940.00 3.00 1,410.00        
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00 5,000.00 5,000.00        
727-01 mobilization lump      LUMP 40,000.00 40,000.00 52,000.00 52,000.00        
729-16-C object marker assembly (type 3) 4      EACH 80.00 320.00 100.00 400.00        
740-01 construction layout lump      LUMP 5,000.00 5,000.00 10,000.00 10,000.00        
804-01-B precast concrete piles (14") 2,040      LNFT 43.00 87,720.00 50.00 102,000.00        
804-12 loading permanent piles 1      EACH 100.00 100.00 1,000.00 1,000.00        
805-10-A bridge superstructure & substructure (28' roadway,
90 degree crossing)
9      SPAN 21,500.00 193,500.00 22,000.00 198,000.00        
S-101 concrete approach slabs (28' rdwy.,90 degree crossing;
w/ asphaltic concrete wearing course)
2      EACH 6,000.00 12,000.00 9,000.00 18,000.00        
                       
 CONTRACTOR TOTAL       492,566.00   572,612.00        