| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - EUTAW CONSTRUCTION CO. INC. |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - GILBERT SOUTHERN CORP |
- 4 - BEST-YET BUILDERS, LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
300,000.00 |
300,000.00 |
250,000.00 |
250,000.00 |
300,000.00 |
300,000.00 |
500,000.00 |
500,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
1.00 |
1.00 |
12,000.00 |
12,000.00 |
80,000.00 |
80,000.00 |
50,000.00 |
50,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
1,596.8 |
SQYD |
2.70 |
4,311.36 |
3.50 |
5,588.80 |
5.00 |
7,984.00 |
7.00 |
11,177.60 |
| 202-02-02 |
removal of old tires (sta. 101+50 and 117+00 to 119+00)
|
42   |
EACH |
36.00 |
1,512.00 |
20.00 |
840.00 |
30.00 |
1,260.00 |
10.00 |
420.00 |
| 203-01 |
general excavation
|
2,513,150   |
CUYD |
1.90 |
4,774,985.00 |
1.50 |
3,769,725.00 |
2.26 |
5,679,719.00 |
3.50 |
8,796,025.00 |
| 203-02 |
drainage excavation
|
40,782   |
CUYD |
3.50 |
142,737.00 |
7.00 |
285,474.00 |
8.00 |
326,256.00 |
4.00 |
163,128.00 |
| 203-04 |
embankment
|
1,911,737   |
CUYD |
1.40 |
2,676,431.80 |
1.40 |
2,676,431.80 |
2.25 |
4,301,408.25 |
1.75 |
3,345,539.75 |
| 204-02 |
temporary hay or straw bales
|
2,000   |
EACH |
8.00 |
16,000.00 |
8.00 |
16,000.00 |
9.00 |
18,000.00 |
7.00 |
14,000.00 |
| 204-04 |
temporary sediment basins
|
16   |
EACH |
150.00 |
2,400.00 |
150.00 |
2,400.00 |
200.00 |
3,200.00 |
500.00 |
8,000.00 |
| 204-05-A |
temporary sediment check dam ( hay )
|
1,000   |
EACH |
100.00 |
100,000.00 |
100.00 |
100,000.00 |
110.00 |
110,000.00 |
150.00 |
150,000.00 |
| 204-06 |
temporary silt fencing
|
39,482   |
LNFT |
1.00 |
39,482.00 |
2.00 |
78,964.00 |
2.00 |
78,964.00 |
1.50 |
59,223.00 |
| 204-07 |
temporary stone construction entrance
|
2   |
EACH |
2,750.00 |
5,500.00 |
2,000.00 |
4,000.00 |
500.00 |
1,000.00 |
1,000.00 |
2,000.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement )
|
500   |
CUYD |
50.00 |
25,000.00 |
40.00 |
20,000.00 |
75.00 |
37,500.00 |
45.00 |
22,500.00 |
| 701-01-F |
cross drain pipe (15" rcp/pcp)
|
536   |
LNFT |
30.00 |
16,080.00 |
40.00 |
21,440.00 |
70.00 |
37,520.00 |
33.00 |
17,688.00 |
| 701-01-G |
cross drain pipe (18" rcp/pcp)
|
140   |
LNFT |
34.00 |
4,760.00 |
65.00 |
9,100.00 |
80.00 |
11,200.00 |
39.00 |
5,460.00 |
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
292   |
LNFT |
70.00 |
20,440.00 |
95.00 |
27,740.00 |
140.00 |
40,880.00 |
94.00 |
27,448.00 |
| 701-01-O |
cross drain pipe (48" rcp/pcp)
|
98   |
LNFT |
128.00 |
12,544.00 |
155.00 |
15,190.00 |
160.00 |
15,680.00 |
148.00 |
14,504.00 |
| 701-01-Q |
cross drain pipe (60" rcp)
|
102   |
LNFT |
175.00 |
17,850.00 |
180.00 |
18,360.00 |
200.00 |
20,400.00 |
275.00 |
28,050.00 |
| 701-01-S |
cross drain pipe (72" rcp)
|
362   |
LNFT |
300.00 |
108,600.00 |
290.00 |
104,980.00 |
250.00 |
90,500.00 |
385.00 |
139,370.00 |
| 701-01-U |
cross drain pipe (84" rcp)
|
2,016   |
LNFT |
440.00 |
887,040.00 |
450.00 |
907,200.00 |
300.00 |
604,800.00 |
550.00 |
1,108,800.00 |
| 701-05-F |
side drain pipe ( 15")
|
80   |
LNFT |
30.00 |
2,400.00 |
40.00 |
3,200.00 |
70.00 |
5,600.00 |
45.00 |
3,600.00 |
| 702-03-A |
catch basins (cb-01)
|
5   |
EACH |
2,800.00 |
14,000.00 |
4,500.00 |
22,500.00 |
3,000.00 |
15,000.00 |
3,200.00 |
16,000.00 |
| 702-05-A |
cross drain end treatment (1 barrel,84")
|
1   |
EACH |
5,400.00 |
5,400.00 |
3,600.00 |
3,600.00 |
10,000.00 |
10,000.00 |
4,000.00 |
4,000.00 |
| 705-02 |
combination mesh & barbed wire fence
|
38,625   |
LNFT |
5.00 |
193,125.00 |
5.00 |
193,125.00 |
5.20 |
200,850.00 |
5.35 |
206,643.75 |
| 708-01 |
right-of-way monument
|
56   |
EACH |
160.00 |
8,960.00 |
150.00 |
8,400.00 |
110.00 |
6,160.00 |
130.00 |
7,280.00 |
| 708-02 |
right-of-way monument witness post
|
56   |
EACH |
30.00 |
1,680.00 |
150.00 |
8,400.00 |
110.00 |
6,160.00 |
120.00 |
6,720.00 |
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
605   |
SQYD |
53.00 |
32,065.00 |
40.00 |
24,200.00 |
80.00 |
48,400.00 |
45.00 |
27,225.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
2,000.00 |
2,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
| 716-01-A |
mulch (vegetative)
|
540.00 |
ACRE |
500.00 |
270,000.00 |
500.00 |
270,000.00 |
530.00 |
286,200.00 |
660.00 |
356,400.00 |
| 717-01 |
seeding
|
21,600   |
LB |
6.00 |
129,600.00 |
6.00 |
129,600.00 |
6.25 |
135,000.00 |
6.38 |
137,808.00 |
| 718-01 |
fertilizer
|
540,000   |
LB |
0.30 |
162,000.00 |
0.30 |
162,000.00 |
0.30 |
162,000.00 |
0.22 |
118,800.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
78,830   |
SQYD |
1.25 |
98,537.50 |
1.25 |
98,537.50 |
1.30 |
102,479.00 |
1.00 |
78,830.00 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
31,111   |
SQYD |
1.50 |
46,666.50 |
1.50 |
46,666.50 |
1.60 |
49,777.60 |
1.05 |
32,666.55 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
26,247   |
SQYD |
1.50 |
39,370.50 |
1.50 |
39,370.50 |
1.60 |
41,995.20 |
1.05 |
27,559.35 |
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
1,741   |
SQYD |
1.50 |
2,611.50 |
1.50 |
2,611.50 |
1.60 |
2,785.60 |
5.45 |
9,488.45 |
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
3,364   |
SQYD |
1.75 |
5,887.00 |
1.75 |
5,887.00 |
1.80 |
6,055.20 |
5.45 |
18,333.80 |
| 722-02 |
project site laboratory( equipped )
|
1   |
EACH |
10,000.00 |
10,000.00 |
17,000.00 |
17,000.00 |
100,000.00 |
100,000.00 |
30,000.00 |
30,000.00 |
| 726-01 |
bedding material
|
5,000.0 |
CUYD |
45.00 |
225,000.00 |
65.00 |
325,000.00 |
60.00 |
300,000.00 |
60.00 |
300,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
200,000.00 |
200,000.00 |
1,000,000.00 |
1,000,000.00 |
1,605,600.00 |
1,605,600.00 |
1,000,000.00 |
1,000,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
20   |
EACH |
55.00 |
1,100.00 |
55.00 |
1,100.00 |
60.00 |
1,200.00 |
85.00 |
1,700.00 |
| 729-19-A |
dead end road installations(type a)
|
2   |
EACH |
2,850.00 |
5,700.00 |
3,000.00 |
6,000.00 |
4,000.00 |
8,000.00 |
3,500.00 |
7,000.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
200,000.00 |
200,000.00 |
150,000.00 |
150,000.00 |
400,000.00 |
400,000.00 |
250,000.00 |
250,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
13,500.00 |
13,500.00 |
10,000.00 |
10,000.00 |
50,000.00 |
50,000.00 |
22,000.00 |
22,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
32.64 |
CUYD |
885.00 |
28,886.40 |
1,000.00 |
32,640.00 |
1,000.00 |
32,640.00 |
850.00 |
27,744.00 |
| 805-12-Q |
reinforced concrete box culverts (8'x 7')
|
330.5 |
LNFT |
500.00 |
165,250.00 |
600.00 |
198,300.00 |
800.00 |
264,400.00 |
540.00 |
178,470.00 |
| 806-01 |
deformed reinforcing steel
|
2,072   |
LB |
1.00 |
2,072.00 |
1.00 |
2,072.00 |
2.00 |
4,144.00 |
1.85 |
3,833.20 |
| S-001 |
plugging/sealing encountered oil wells
|
5,000   |
LNFT |
5.00 |
25,000.00 |
20.00 |
100,000.00 |
30.00 |
150,000.00 |
30.00 |
150,000.00 |
| S-002 |
underground power line installation
|
lump |
LUMP |
44,000.00 |
44,000.00 |
55,000.00 |
55,000.00 |
100,000.00 |
100,000.00 |
55,000.00 |
55,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
11,093,485.56 |
|
11,242,643.60 |
|
15,910,717.85 |
|
17,590,435.45 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - BLOUNT BROS. CONSTRUCTION, INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
213,500.00 |
213,500.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
75,000.00 |
75,000.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
1,596.8 |
SQYD |
10.00 |
15,968.00 |
|
|
|
|
|
|
| 202-02-02 |
removal of old tires (sta. 101+50 and 117+00 to 119+00)
|
42   |
EACH |
25.00 |
1,050.00 |
|
|
|
|
|
|
| 203-01 |
general excavation
|
2,513,150   |
CUYD |
3.50 |
8,796,025.00 |
|
|
|
|
|
|
| 203-02 |
drainage excavation
|
40,782   |
CUYD |
7.00 |
285,474.00 |
|
|
|
|
|
|
| 203-04 |
embankment
|
1,911,737   |
CUYD |
1.95 |
3,727,887.15 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
2,000   |
EACH |
10.00 |
20,000.00 |
|
|
|
|
|
|
| 204-04 |
temporary sediment basins
|
16   |
EACH |
200.00 |
3,200.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dam ( hay )
|
1,000   |
EACH |
150.00 |
150,000.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
39,482   |
LNFT |
2.00 |
78,964.00 |
|
|
|
|
|
|
| 204-07 |
temporary stone construction entrance
|
2   |
EACH |
3,000.00 |
6,000.00 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement )
|
500   |
CUYD |
50.00 |
25,000.00 |
|
|
|
|
|
|
| 701-01-F |
cross drain pipe (15" rcp/pcp)
|
536   |
LNFT |
20.00 |
10,720.00 |
|
|
|
|
|
|
| 701-01-G |
cross drain pipe (18" rcp/pcp)
|
140   |
LNFT |
25.00 |
3,500.00 |
|
|
|
|
|
|
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
292   |
LNFT |
85.00 |
24,820.00 |
|
|
|
|
|
|
| 701-01-O |
cross drain pipe (48" rcp/pcp)
|
98   |
LNFT |
170.00 |
16,660.00 |
|
|
|
|
|
|
| 701-01-Q |
cross drain pipe (60" rcp)
|
102   |
LNFT |
250.00 |
25,500.00 |
|
|
|
|
|
|
| 701-01-S |
cross drain pipe (72" rcp)
|
362   |
LNFT |
450.00 |
162,900.00 |
|
|
|
|
|
|
| 701-01-U |
cross drain pipe (84" rcp)
|
2,016   |
LNFT |
700.00 |
1,411,200.00 |
|
|
|
|
|
|
| 701-05-F |
side drain pipe ( 15")
|
80   |
LNFT |
20.00 |
1,600.00 |
|
|
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
5   |
EACH |
4,000.00 |
20,000.00 |
|
|
|
|
|
|
| 702-05-A |
cross drain end treatment (1 barrel,84")
|
1   |
EACH |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 705-02 |
combination mesh & barbed wire fence
|
38,625   |
LNFT |
5.50 |
212,437.50 |
|
|
|
|
|
|
| 708-01 |
right-of-way monument
|
56   |
EACH |
250.00 |
14,000.00 |
|
|
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
56   |
EACH |
100.00 |
5,600.00 |
|
|
|
|
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
605   |
SQYD |
60.00 |
36,300.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
540.00 |
ACRE |
600.00 |
324,000.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
21,600   |
LB |
7.00 |
151,200.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
540,000   |
LB |
0.40 |
216,000.00 |
|
|
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
78,830   |
SQYD |
1.50 |
118,245.00 |
|
|
|
|
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
31,111   |
SQYD |
1.75 |
54,444.25 |
|
|
|
|
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
26,247   |
SQYD |
1.75 |
45,932.25 |
|
|
|
|
|
|
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
1,741   |
SQYD |
1.75 |
3,046.75 |
|
|
|
|
|
|
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
3,364   |
SQYD |
2.00 |
6,728.00 |
|
|
|
|
|
|
| 722-02 |
project site laboratory( equipped )
|
1   |
EACH |
40,000.00 |
40,000.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
5,000.0 |
CUYD |
50.00 |
250,000.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
575,000.00 |
575,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
20   |
EACH |
250.00 |
5,000.00 |
|
|
|
|
|
|
| 729-19-A |
dead end road installations(type a)
|
2   |
EACH |
5,000.00 |
10,000.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
250,000.00 |
250,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
32.64 |
CUYD |
1,000.00 |
32,640.00 |
|
|
|
|
|
|
| 805-12-Q |
reinforced concrete box culverts (8'x 7')
|
330.5 |
LNFT |
700.00 |
231,350.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
2,072   |
LB |
1.50 |
3,108.00 |
|
|
|
|
|
|
| S-001 |
plugging/sealing encountered oil wells
|
5,000   |
LNFT |
10.00 |
50,000.00 |
|
|
|
|
|
|
| S-002 |
underground power line installation
|
lump |
LUMP |
70,000.00 |
70,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
17,809,999.90 |
|
|
|
|
|
|
|