Letting of 10/26/2005 LA DOTD Headquarters


READV
go back
Go Back
DBE GOAL FED
Lead Project: 455-09-0022
Parish: CADDO
Routes: I-49
Description: I-49 NORTH (MIRA-MYRTIS RD.-LA 168)(DRAINAGE & EMBANKMENT)
Type Const: clearing and grubbing, excavation, embankment, drainage structures, and related
work
 
RankLicenseBidderAmount
139670 EUTAW CONSTRUCTION CO. INC. $11,093,485.56
234567 JAMES CONSTRUCTION GROUP LLC $11,242,643.60
328665 GILBERT SOUTHERN CORP $15,910,717.85
436374 BEST-YET BUILDERS, LLC $17,590,435.45
512135 BLOUNT BROS. CONSTRUCTION, INC. $17,809,999.90
 
Item Number Item Description Quantity Unit of Measure - 1 -
EUTAW CONSTRUCTION CO. INC.
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
GILBERT SOUTHERN CORP
- 4 -
BEST-YET BUILDERS, LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 300,000.00 300,000.00 250,000.00 250,000.00 300,000.00 300,000.00 500,000.00 500,000.00
202-01 removal of structures & obstructions lump      LUMP 1.00 1.00 12,000.00 12,000.00 80,000.00 80,000.00 50,000.00 50,000.00
202-02-G removal of surfacing & stabilized base 1,596.8    SQYD 2.70 4,311.36 3.50 5,588.80 5.00 7,984.00 7.00 11,177.60
202-02-02 removal of old tires (sta. 101+50 and 117+00 to 119+00) 42      EACH 36.00 1,512.00 20.00 840.00 30.00 1,260.00 10.00 420.00
203-01 general excavation 2,513,150      CUYD 1.90 4,774,985.00 1.50 3,769,725.00 2.26 5,679,719.00 3.50 8,796,025.00
203-02 drainage excavation 40,782      CUYD 3.50 142,737.00 7.00 285,474.00 8.00 326,256.00 4.00 163,128.00
203-04 embankment 1,911,737      CUYD 1.40 2,676,431.80 1.40 2,676,431.80 2.25 4,301,408.25 1.75 3,345,539.75
204-02 temporary hay or straw bales 2,000      EACH 8.00 16,000.00 8.00 16,000.00 9.00 18,000.00 7.00 14,000.00
204-04 temporary sediment basins 16      EACH 150.00 2,400.00 150.00 2,400.00 200.00 3,200.00 500.00 8,000.00
204-05-A temporary sediment check dam ( hay ) 1,000      EACH 100.00 100,000.00 100.00 100,000.00 110.00 110,000.00 150.00 150,000.00
204-06 temporary silt fencing 39,482      LNFT 1.00 39,482.00 2.00 78,964.00 2.00 78,964.00 1.50 59,223.00
204-07 temporary stone construction entrance 2      EACH 2,750.00 5,500.00 2,000.00 4,000.00 500.00 1,000.00 1,000.00 2,000.00
402-01 traffic maintenance aggregate (vehicular measurement ) 500      CUYD 50.00 25,000.00 40.00 20,000.00 75.00 37,500.00 45.00 22,500.00
701-01-F cross drain pipe (15" rcp/pcp) 536      LNFT 30.00 16,080.00 40.00 21,440.00 70.00 37,520.00 33.00 17,688.00
701-01-G cross drain pipe (18" rcp/pcp) 140      LNFT 34.00 4,760.00 65.00 9,100.00 80.00 11,200.00 39.00 5,460.00
701-01-M cross drain pipe (36" rcp/pcp) 292      LNFT 70.00 20,440.00 95.00 27,740.00 140.00 40,880.00 94.00 27,448.00
701-01-O cross drain pipe (48" rcp/pcp) 98      LNFT 128.00 12,544.00 155.00 15,190.00 160.00 15,680.00 148.00 14,504.00
701-01-Q cross drain pipe (60" rcp) 102      LNFT 175.00 17,850.00 180.00 18,360.00 200.00 20,400.00 275.00 28,050.00
701-01-S cross drain pipe (72" rcp) 362      LNFT 300.00 108,600.00 290.00 104,980.00 250.00 90,500.00 385.00 139,370.00
701-01-U cross drain pipe (84" rcp) 2,016      LNFT 440.00 887,040.00 450.00 907,200.00 300.00 604,800.00 550.00 1,108,800.00
701-05-F side drain pipe ( 15") 80      LNFT 30.00 2,400.00 40.00 3,200.00 70.00 5,600.00 45.00 3,600.00
702-03-A catch basins (cb-01) 5      EACH 2,800.00 14,000.00 4,500.00 22,500.00 3,000.00 15,000.00 3,200.00 16,000.00
702-05-A cross drain end treatment (1 barrel,84") 1      EACH 5,400.00 5,400.00 3,600.00 3,600.00 10,000.00 10,000.00 4,000.00 4,000.00
705-02 combination mesh & barbed wire fence 38,625      LNFT 5.00 193,125.00 5.00 193,125.00 5.20 200,850.00 5.35 206,643.75
708-01 right-of-way monument 56      EACH 160.00 8,960.00 150.00 8,400.00 110.00 6,160.00 130.00 7,280.00
708-02 right-of-way monument witness post 56      EACH 30.00 1,680.00 150.00 8,400.00 110.00 6,160.00 120.00 6,720.00
712-01-A concrete cast-in-place revetment (4" thick) 605      SQYD 53.00 32,065.00 40.00 24,200.00 80.00 48,400.00 45.00 27,225.00
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00 2,000.00 2,000.00 50,000.00 50,000.00 50,000.00 50,000.00
716-01-A mulch (vegetative) 540.00   ACRE 500.00 270,000.00 500.00 270,000.00 530.00 286,200.00 660.00 356,400.00
717-01 seeding 21,600      LB 6.00 129,600.00 6.00 129,600.00 6.25 135,000.00 6.38 137,808.00
718-01 fertilizer 540,000      LB 0.30 162,000.00 0.30 162,000.00 0.30 162,000.00 0.22 118,800.00
720-01-A erosion control system, slope protection (type a) 78,830      SQYD 1.25 98,537.50 1.25 98,537.50 1.30 102,479.00 1.00 78,830.00
720-01-C erosion control system, flexible channel liner (type c) 31,111      SQYD 1.50 46,666.50 1.50 46,666.50 1.60 49,777.60 1.05 32,666.55
720-01-D erosion control system, flexible channel liner (type d) 26,247      SQYD 1.50 39,370.50 1.50 39,370.50 1.60 41,995.20 1.05 27,559.35
720-01-E erosion control system, flexible channel liner (type e) 1,741      SQYD 1.50 2,611.50 1.50 2,611.50 1.60 2,785.60 5.45 9,488.45
720-01-F erosion control system, flexible channel liner (type f) 3,364      SQYD 1.75 5,887.00 1.75 5,887.00 1.80 6,055.20 5.45 18,333.80
722-02 project site laboratory( equipped ) 1      EACH 10,000.00 10,000.00 17,000.00 17,000.00 100,000.00 100,000.00 30,000.00 30,000.00
726-01 bedding material 5,000.0    CUYD 45.00 225,000.00 65.00 325,000.00 60.00 300,000.00 60.00 300,000.00
727-01 mobilization lump      LUMP 200,000.00 200,000.00 1,000,000.00 1,000,000.00 1,605,600.00 1,605,600.00 1,000,000.00 1,000,000.00
729-16-B object marker assembly (type 2) 20      EACH 55.00 1,100.00 55.00 1,100.00 60.00 1,200.00 85.00 1,700.00
729-19-A dead end road installations(type a) 2      EACH 2,850.00 5,700.00 3,000.00 6,000.00 4,000.00 8,000.00 3,500.00 7,000.00
740-01 construction layout lump      LUMP 200,000.00 200,000.00 150,000.00 150,000.00 400,000.00 400,000.00 250,000.00 250,000.00
744-01 traffic control management lump      LUMP 13,500.00 13,500.00 10,000.00 10,000.00 50,000.00 50,000.00 22,000.00 22,000.00
805-01-B class a concrete (box culvert headwalls) 32.64   CUYD 885.00 28,886.40 1,000.00 32,640.00 1,000.00 32,640.00 850.00 27,744.00
805-12-Q reinforced concrete box culverts (8'x 7') 330.5    LNFT 500.00 165,250.00 600.00 198,300.00 800.00 264,400.00 540.00 178,470.00
806-01 deformed reinforcing steel 2,072      LB 1.00 2,072.00 1.00 2,072.00 2.00 4,144.00 1.85 3,833.20
S-001 plugging/sealing encountered oil wells 5,000      LNFT 5.00 25,000.00 20.00 100,000.00 30.00 150,000.00 30.00 150,000.00
S-002 underground power line installation lump      LUMP 44,000.00 44,000.00 55,000.00 55,000.00 100,000.00 100,000.00 55,000.00 55,000.00
                       
 CONTRACTOR TOTAL       11,093,485.56   11,242,643.60   15,910,717.85   17,590,435.45
 
Item Number Item Description Quantity Unit of Measure - 5 -
BLOUNT BROS. CONSTRUCTION, INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 213,500.00 213,500.00            
202-01 removal of structures & obstructions lump      LUMP 75,000.00 75,000.00            
202-02-G removal of surfacing & stabilized base 1,596.8    SQYD 10.00 15,968.00            
202-02-02 removal of old tires (sta. 101+50 and 117+00 to 119+00) 42      EACH 25.00 1,050.00            
203-01 general excavation 2,513,150      CUYD 3.50 8,796,025.00            
203-02 drainage excavation 40,782      CUYD 7.00 285,474.00            
203-04 embankment 1,911,737      CUYD 1.95 3,727,887.15            
204-02 temporary hay or straw bales 2,000      EACH 10.00 20,000.00            
204-04 temporary sediment basins 16      EACH 200.00 3,200.00            
204-05-A temporary sediment check dam ( hay ) 1,000      EACH 150.00 150,000.00            
204-06 temporary silt fencing 39,482      LNFT 2.00 78,964.00            
204-07 temporary stone construction entrance 2      EACH 3,000.00 6,000.00            
402-01 traffic maintenance aggregate (vehicular measurement ) 500      CUYD 50.00 25,000.00            
701-01-F cross drain pipe (15" rcp/pcp) 536      LNFT 20.00 10,720.00            
701-01-G cross drain pipe (18" rcp/pcp) 140      LNFT 25.00 3,500.00            
701-01-M cross drain pipe (36" rcp/pcp) 292      LNFT 85.00 24,820.00            
701-01-O cross drain pipe (48" rcp/pcp) 98      LNFT 170.00 16,660.00            
701-01-Q cross drain pipe (60" rcp) 102      LNFT 250.00 25,500.00            
701-01-S cross drain pipe (72" rcp) 362      LNFT 450.00 162,900.00            
701-01-U cross drain pipe (84" rcp) 2,016      LNFT 700.00 1,411,200.00            
701-05-F side drain pipe ( 15") 80      LNFT 20.00 1,600.00            
702-03-A catch basins (cb-01) 5      EACH 4,000.00 20,000.00            
702-05-A cross drain end treatment (1 barrel,84") 1      EACH 10,000.00 10,000.00            
705-02 combination mesh & barbed wire fence 38,625      LNFT 5.50 212,437.50            
708-01 right-of-way monument 56      EACH 250.00 14,000.00            
708-02 right-of-way monument witness post 56      EACH 100.00 5,600.00            
712-01-A concrete cast-in-place revetment (4" thick) 605      SQYD 60.00 36,300.00            
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00            
716-01-A mulch (vegetative) 540.00   ACRE 600.00 324,000.00            
717-01 seeding 21,600      LB 7.00 151,200.00            
718-01 fertilizer 540,000      LB 0.40 216,000.00            
720-01-A erosion control system, slope protection (type a) 78,830      SQYD 1.50 118,245.00            
720-01-C erosion control system, flexible channel liner (type c) 31,111      SQYD 1.75 54,444.25            
720-01-D erosion control system, flexible channel liner (type d) 26,247      SQYD 1.75 45,932.25            
720-01-E erosion control system, flexible channel liner (type e) 1,741      SQYD 1.75 3,046.75            
720-01-F erosion control system, flexible channel liner (type f) 3,364      SQYD 2.00 6,728.00            
722-02 project site laboratory( equipped ) 1      EACH 40,000.00 40,000.00            
726-01 bedding material 5,000.0    CUYD 50.00 250,000.00            
727-01 mobilization lump      LUMP 575,000.00 575,000.00            
729-16-B object marker assembly (type 2) 20      EACH 250.00 5,000.00            
729-19-A dead end road installations(type a) 2      EACH 5,000.00 10,000.00            
740-01 construction layout lump      LUMP 250,000.00 250,000.00            
744-01 traffic control management lump      LUMP 10,000.00 10,000.00            
805-01-B class a concrete (box culvert headwalls) 32.64   CUYD 1,000.00 32,640.00            
805-12-Q reinforced concrete box culverts (8'x 7') 330.5    LNFT 700.00 231,350.00            
806-01 deformed reinforcing steel 2,072      LB 1.50 3,108.00            
S-001 plugging/sealing encountered oil wells 5,000      LNFT 10.00 50,000.00            
S-002 underground power line installation lump      LUMP 70,000.00 70,000.00            
                       
 CONTRACTOR TOTAL       17,809,999.90            