| 201-01 |
clearing and grubbing
|
lump |
lump |
120,000.00 |
120,000.00 |
225,000.00 |
225,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
35,000.00 |
35,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge (sta. 1+385.30; 7.12 m x 12.1 m
timber bridge) |
1   |
ea |
13,000.00 |
13,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| 202-02-A-02 |
removal of bridge (sta. 2+187.87; 7.15 m x 12.0 m
timber bridge) |
1   |
ea |
13,000.00 |
13,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| 202-02-A-03 |
removal of bridge (sta. 2+486.34; 7.07 m x 11.8 m
timber bridge) |
1   |
ea |
13,000.00 |
13,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-04 |
removal of bridge (sta. 3+503.58; 7.00 m x 12.0 m
timber bridge) |
1   |
ea |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-05 |
removal of bridge (sta. 4+262.74; 6.90 m x 6.60 m
timber bridge) |
1   |
ea |
12,000.00 |
12,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 202-02-A-06 |
removal of bridge (sta. 5+201.60; 6.9 m x 35.35 m
timber bridge) |
1   |
ea |
22,000.00 |
22,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| 202-02-A-07 |
removal of bridge (sta. 6+200.42; 5.68 m x 23.3 m
timber bridge) |
1   |
ea |
18,000.00 |
18,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| 202-02-A-08 |
removal of bridge (sta. 7+766.86; 5.83 m x 24.1 m
timber bridge) |
1   |
ea |
18,000.00 |
18,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
42   |
sq m |
25.00 |
1,050.00 |
10.00 |
420.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
11,855.3 |
sq m |
5.00 |
59,276.50 |
4.00 |
47,421.20 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
1,114   |
ln m |
7.00 |
7,798.00 |
12.00 |
13,368.00 |
|
|
|
|
| 202-02-01 |
removal of block building (left of sta. 8+141; 6.5 m x
6.3 m) |
1   |
ea |
2,500.00 |
2,500.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-02 |
removal of block building (right of sta. 8+157; 11.5 m
x 9 m) |
1   |
ea |
2,500.00 |
2,500.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| 202-02-03 |
removal of block building (right of sta. 8+200; 27 m x
12 m) |
1   |
ea |
2,500.00 |
2,500.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 203-01 |
general excavation
|
27,182   |
cu m |
6.00 |
163,092.00 |
7.00 |
190,274.00 |
|
|
|
|
| 203-02 |
drainage excavation
|
9,730   |
cu m |
8.00 |
77,840.00 |
8.00 |
77,840.00 |
|
|
|
|
| 203-04 |
embankment
|
17,688   |
cu m |
9.00 |
159,192.00 |
15.00 |
265,320.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dam (hay)
|
100   |
each |
50.00 |
5,000.00 |
100.00 |
10,000.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
4,230   |
ln m |
8.00 |
33,840.00 |
6.00 |
25,380.00 |
|
|
|
|
| 302-01-A |
class ii base course (crushed stone)
|
5,531.7 |
cu m |
90.00 |
497,853.00 |
85.00 |
470,194.50 |
|
|
|
|
| 304-01 |
lime
|
63.50 |
Mg |
150.00 |
9,525.00 |
150.00 |
9,525.00 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (300 mm thick)
|
4,200   |
sq m |
5.00 |
21,000.00 |
6.00 |
25,200.00 |
|
|
|
|
| 401-01 |
aggregate surface course (net section)
|
93.9 |
cu m |
80.00 |
7,512.00 |
85.00 |
7,981.50 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,000.0 |
cu m |
1.00 |
1,000.00 |
30.00 |
30,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
5,907.8 |
Mg |
79.00 |
466,716.20 |
90.00 |
531,702.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
miscellaneous |
1,175.4 |
Mg |
79.00 |
92,856.60 |
175.00 |
205,695.00 |
|
|
|
|
| 701-05-I |
side drain pipe (600 mm)
|
135.0 |
ln m |
165.00 |
22,275.00 |
92.00 |
12,420.00 |
|
|
|
|
| 701-05-I-01 |
side drain pipe (600 mm) (erosion)
|
240.0 |
ln m |
175.00 |
42,000.00 |
92.00 |
22,080.00 |
|
|
|
|
| 702-08-A |
side drain safety end (type 1)
|
4   |
ea |
1,200.00 |
4,800.00 |
2,600.00 |
10,400.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
377.22 |
ln m |
49.95 |
18,842.13 |
56.00 |
21,124.32 |
|
|
|
|
| 704-08-A |
guard rail transitions (single thrie beam)
|
121.92 |
ln m |
148.00 |
18,044.16 |
175.00 |
21,336.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
16   |
each |
1,850.00 |
29,600.00 |
2,200.00 |
35,200.00 |
|
|
|
|
| 705-01 |
barbed wire fence
|
1,597   |
ln m |
16.40 |
26,190.80 |
17.50 |
27,947.50 |
|
|
|
|
| 705-02 |
combination mesh & barbed wire fence
|
385   |
ln m |
17.80 |
6,853.00 |
25.00 |
9,625.00 |
|
|
|
|
| 705-04 |
single swinging driveway gates
|
3   |
ea |
400.00 |
1,200.00 |
1,000.00 |
3,000.00 |
|
|
|
|
| 705-05 |
double swinging driveway gates
|
1   |
dbgt |
550.00 |
550.00 |
1,750.00 |
1,750.00 |
|
|
|
|
| 706-02-A |
concrete drive (100 mm thick)
|
42.4 |
sq m |
50.00 |
2,120.00 |
65.00 |
2,756.00 |
|
|
|
|
| 708-01 |
right-of-way monument
|
120   |
ea |
150.00 |
18,000.00 |
225.00 |
27,000.00 |
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
120   |
ea |
150.00 |
18,000.00 |
225.00 |
27,000.00 |
|
|
|
|
| 709-01 |
steel cattle guard
|
2   |
ea |
5,000.00 |
10,000.00 |
15,000.00 |
30,000.00 |
|
|
|
|
| 712-04 |
flexible revetment
|
1,900   |
sq m |
48.00 |
91,200.00 |
60.00 |
114,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
125,000.00 |
125,000.00 |
145,000.00 |
145,000.00 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line) (100 mm width)
|
13.656 |
km |
308.00 |
4,206.04 |
450.00 |
6,145.20 |
|
|
|
|
| 714-01 |
slab sodding
|
100   |
sq m |
4.50 |
450.00 |
25.00 |
2,500.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
16.0 |
hc |
1,425.00 |
22,800.00 |
2,500.00 |
40,000.00 |
|
|
|
|
| 717-01 |
seeding
|
720   |
kg |
16.00 |
11,520.00 |
15.00 |
10,800.00 |
|
|
|
|
| 718-01 |
fertilizer
|
17,920   |
kg |
0.53 |
9,497.60 |
0.60 |
10,752.00 |
|
|
|
|
| 720-01-B |
erosion control system, slope protection (type b)
|
9,019   |
sq m |
1.50 |
13,528.50 |
1.40 |
12,626.60 |
|
|
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
2,235   |
sq m |
2.00 |
4,470.00 |
1.40 |
3,129.00 |
|
|
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
3,555   |
sq m |
2.00 |
7,110.00 |
1.90 |
6,754.50 |
|
|
|
|
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
655   |
sq m |
3.00 |
1,965.00 |
3.25 |
2,128.75 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
ea |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 725-01 |
temporary detour roads
|
2,515.9 |
ln m |
415.00 |
1,044,098.50 |
550.00 |
1,383,745.00 |
|
|
|
|
| 725-03 |
temporary detour bridging
|
72.00 |
ln m |
2,000.00 |
144,000.00 |
4,000.00 |
288,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
232.0 |
cu m |
60.00 |
13,920.00 |
80.00 |
18,560.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
lump |
250,000.00 |
250,000.00 |
765,000.00 |
765,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
ea |
70.00 |
1,120.00 |
100.00 |
1,600.00 |
|
|
|
|
| 729-19-A |
dead end road installations (type a)
|
1   |
ea |
1,500.00 |
1,500.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
250   |
ea |
4.50 |
1,125.00 |
7.00 |
1,750.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (100 mm width)
|
8.250 |
km |
1,150.00 |
9,487.50 |
1,600.00 |
13,200.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
3.900 |
km |
432.00 |
1,684.80 |
900.00 |
3,510.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
3.500 |
km |
1,850.00 |
6,475.00 |
3,200.00 |
11,200.00 |
|
|
|
|
| 735-01 |
mailboxes
|
6   |
ea |
1.00 |
6.00 |
100.00 |
600.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
4   |
ea |
225.00 |
900.00 |
100.00 |
400.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
1   |
ea |
500.00 |
500.00 |
200.00 |
200.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
lump |
80,000.00 |
80,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
lump |
60,000.00 |
60,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 804-01-C |
precast concrete piles (400 mm)
|
2,567.5 |
ln m |
135.00 |
346,612.50 |
165.00 |
423,637.50 |
|
|
|
|
| 804-12 |
loading permanent piles
|
4   |
ea |
2,000.00 |
8,000.00 |
1.00 |
4.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
100.30 |
cu m |
1,100.00 |
110,330.00 |
1,500.00 |
150,450.00 |
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
148.21 |
cu m |
750.00 |
111,157.50 |
750.00 |
111,157.50 |
|
|
|
|
| 805-03 |
class aa concrete
|
630.00 |
cu m |
650.00 |
409,500.00 |
685.00 |
431,550.00 |
|
|
|
|
| 805-12-I |
reinforced concrete box culverts (1500 mm x 1500 mm)
|
212.00 |
ln m |
1,000.00 |
212,000.00 |
1,250.00 |
265,000.00 |
|
|
|
|
| 805-12-P |
reinforced concrete box culverts (2100 mm x 2100 mm)
|
195.00 |
ln m |
1,800.00 |
351,000.00 |
1,800.00 |
351,000.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
80,726   |
kg |
1.75 |
141,270.50 |
1.70 |
137,234.20 |
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
264.00 |
ln m |
140.00 |
36,960.00 |
175.00 |
46,200.00 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
1,180.08 |
sq m |
170.00 |
200,613.60 |
185.00 |
218,314.80 |
|
|
|
|
| S-001 |
relocation of cattle guard and fence
|
lump |
lump |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-002 |
obliterate existing roadway and grade to drain (site 8)
|
521.0 |
ln.m |
50.00 |
26,050.00 |
150.00 |
78,150.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
5,993,584.43 |
|
7,828,259.07 |
|
|
|
|
|