Letting of 10/26/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 073-01-0005
Parish: RAPIDES
Routes: LA 112
Description: LA 112 BRIDGES
Type Const: clearing and grubbing, grading, drainage structures, class ii base course, lime
treatment, superpave asphaltic concrete pavement, concrete slab span bridges, and related work.
 
RankLicenseBidderAmount
108815 W. E. MCDONALD & SON, LLC. $5,993,584.43
209090 GUINN BROTHERS, LLC. $7,828,259.07
 
Item Number Item Description Quantity Unit of Measure - 1 -
W. E. MCDONALD & SON, LLC.
- 2 -
GUINN BROTHERS, LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 120,000.00 120,000.00 225,000.00 225,000.00        
202-01 removal of structures & obstructions lump      lump 35,000.00 35,000.00 15,000.00 15,000.00        
202-02-A-01 removal of bridge (sta. 1+385.30; 7.12 m x 12.1 m
timber bridge)
1      ea 13,000.00 13,000.00 12,000.00 12,000.00        
202-02-A-02 removal of bridge (sta. 2+187.87; 7.15 m x 12.0 m
timber bridge)
1      ea 13,000.00 13,000.00 12,000.00 12,000.00        
202-02-A-03 removal of bridge (sta. 2+486.34; 7.07 m x 11.8 m
timber bridge)
1      ea 13,000.00 13,000.00 10,000.00 10,000.00        
202-02-A-04 removal of bridge (sta. 3+503.58; 7.00 m x 12.0 m
timber bridge)
1      ea 15,000.00 15,000.00 10,000.00 10,000.00        
202-02-A-05 removal of bridge (sta. 4+262.74; 6.90 m x 6.60 m
timber bridge)
1      ea 12,000.00 12,000.00 5,000.00 5,000.00        
202-02-A-06 removal of bridge (sta. 5+201.60; 6.9 m x 35.35 m
timber bridge)
1      ea 22,000.00 22,000.00 12,000.00 12,000.00        
202-02-A-07 removal of bridge (sta. 6+200.42; 5.68 m x 23.3 m
timber bridge)
1      ea 18,000.00 18,000.00 12,000.00 12,000.00        
202-02-A-08 removal of bridge (sta. 7+766.86; 5.83 m x 24.1 m
timber bridge)
1      ea 18,000.00 18,000.00 10,000.00 10,000.00        
202-02-D removal of concrete walks & drives 42      sq m 25.00 1,050.00 10.00 420.00        
202-02-G removal of surfacing & stabilized base 11,855.3    sq m 5.00 59,276.50 4.00 47,421.20        
202-02-H removal of guard rail 1,114      ln m 7.00 7,798.00 12.00 13,368.00        
202-02-01 removal of block building (left of sta. 8+141; 6.5 m x
6.3 m)
1      ea 2,500.00 2,500.00 10,000.00 10,000.00        
202-02-02 removal of block building (right of sta. 8+157; 11.5 m
x 9 m)
1      ea 2,500.00 2,500.00 12,000.00 12,000.00        
202-02-03 removal of block building (right of sta. 8+200; 27 m x
12 m)
1      ea 2,500.00 2,500.00 15,000.00 15,000.00        
203-01 general excavation 27,182      cu m 6.00 163,092.00 7.00 190,274.00        
203-02 drainage excavation 9,730      cu m 8.00 77,840.00 8.00 77,840.00        
203-04 embankment 17,688      cu m 9.00 159,192.00 15.00 265,320.00        
204-05-A temporary sediment check dam (hay) 100      each 50.00 5,000.00 100.00 10,000.00        
204-06 temporary silt fencing 4,230      ln m 8.00 33,840.00 6.00 25,380.00        
302-01-A class ii base course (crushed stone) 5,531.7    cu m 90.00 497,853.00 85.00 470,194.50        
304-01 lime 63.50   Mg 150.00 9,525.00 150.00 9,525.00        
304-04-D lime treatment (type d) (300 mm thick) 4,200      sq m 5.00 21,000.00 6.00 25,200.00        
401-01 aggregate surface course (net section) 93.9    cu m 80.00 7,512.00 85.00 7,981.50        
402-01 traffic maintenance aggregate (vehicular measurement) 1,000.0    cu m 1.00 1,000.00 30.00 30,000.00        
502-01 superpave asphaltic concrete 5,907.8    Mg 79.00 466,716.20 90.00 531,702.00        
502-01-A superpave asphaltic concrete, drives, turnouts, and
miscellaneous
1,175.4    Mg 79.00 92,856.60 175.00 205,695.00        
701-05-I side drain pipe (600 mm) 135.0    ln m 165.00 22,275.00 92.00 12,420.00        
701-05-I-01 side drain pipe (600 mm) (erosion) 240.0    ln m 175.00 42,000.00 92.00 22,080.00        
702-08-A side drain safety end (type 1) 4      ea 1,200.00 4,800.00 2,600.00 10,400.00        
704-03 blocked out guard rail 377.22   ln m 49.95 18,842.13 56.00 21,124.32        
704-08-A guard rail transitions (single thrie beam) 121.92   ln m 148.00 18,044.16 175.00 21,336.00        
704-11-A guard rail end treatment (flared) 16      each 1,850.00 29,600.00 2,200.00 35,200.00        
705-01 barbed wire fence 1,597      ln m 16.40 26,190.80 17.50 27,947.50        
705-02 combination mesh & barbed wire fence 385      ln m 17.80 6,853.00 25.00 9,625.00        
705-04 single swinging driveway gates 3      ea 400.00 1,200.00 1,000.00 3,000.00        
705-05 double swinging driveway gates 1      dbgt 550.00 550.00 1,750.00 1,750.00        
706-02-A concrete drive (100 mm thick) 42.4    sq m 50.00 2,120.00 65.00 2,756.00        
708-01 right-of-way monument 120      ea 150.00 18,000.00 225.00 27,000.00        
708-02 right-of-way monument witness post 120      ea 150.00 18,000.00 225.00 27,000.00        
709-01 steel cattle guard 2      ea 5,000.00 10,000.00 15,000.00 30,000.00        
712-04 flexible revetment 1,900      sq m 48.00 91,200.00 60.00 114,000.00        
713-01 temporary signs & barricades lump      lump 125,000.00 125,000.00 145,000.00 145,000.00        
713-05-A temporary pavement markings (solid line) (100 mm width) 13.656  km 308.00 4,206.04 450.00 6,145.20        
714-01 slab sodding 100      sq m 4.50 450.00 25.00 2,500.00        
716-01-A mulch (vegetative) 16.0    hc 1,425.00 22,800.00 2,500.00 40,000.00        
717-01 seeding 720      kg 16.00 11,520.00 15.00 10,800.00        
718-01 fertilizer 17,920      kg 0.53 9,497.60 0.60 10,752.00        
720-01-B erosion control system, slope protection (type b) 9,019      sq m 1.50 13,528.50 1.40 12,626.60        
720-01-C erosion control system, flexible channel liner (type c) 2,235      sq m 2.00 4,470.00 1.40 3,129.00        
720-01-D erosion control system, flexible channel liner (type d) 3,555      sq m 2.00 7,110.00 1.90 6,754.50        
720-01-E erosion control system, flexible channel liner (type e) 655      sq m 3.00 1,965.00 3.25 2,128.75        
722-01 project site laboratory 1      ea 10,000.00 10,000.00 15,000.00 15,000.00        
725-01 temporary detour roads 2,515.9    ln m 415.00 1,044,098.50 550.00 1,383,745.00        
725-03 temporary detour bridging 72.00   ln m 2,000.00 144,000.00 4,000.00 288,000.00        
726-01 bedding material 232.0    cu m 60.00 13,920.00 80.00 18,560.00        
727-01 mobilization lump      lump 250,000.00 250,000.00 765,000.00 765,000.00        
729-16-C object marker assembly (type 3) 16      ea 70.00 1,120.00 100.00 1,600.00        
729-19-A dead end road installations (type a) 1      ea 1,500.00 1,500.00 2,000.00 2,000.00        
731-02 reflectorized raised pavement markers 250      ea 4.50 1,125.00 7.00 1,750.00        
732-02-A plastic pavement striping (solid line) (100 mm width) 8.250  km 1,150.00 9,487.50 1,600.00 13,200.00        
732-03-A plastic pavement striping (broken line)(100 mm width) 3.900  km 432.00 1,684.80 900.00 3,510.00        
732-05 removal of existing markings 3.500  km 1,850.00 6,475.00 3,200.00 11,200.00        
735-01 mailboxes 6      ea 1.00 6.00 100.00 600.00        
735-02 mailbox supports (single) 4      ea 225.00 900.00 100.00 400.00        
735-03 mailbox supports (double) 1      ea 500.00 500.00 200.00 200.00        
740-01 construction layout lump      lump 80,000.00 80,000.00 200,000.00 200,000.00        
744-01 traffic control management lump      lump 60,000.00 60,000.00 15,000.00 15,000.00        
804-01-C precast concrete piles (400 mm) 2,567.5    ln m 135.00 346,612.50 165.00 423,637.50        
804-12 loading permanent piles 4      ea 2,000.00 8,000.00 1.00 4.00        
805-01-B class a concrete (box culvert headwalls) 100.30   cu m 1,100.00 110,330.00 1,500.00 150,450.00        
805-01-F class a concrete (bents) 148.21   cu m 750.00 111,157.50 750.00 111,157.50        
805-03 class aa concrete 630.00   cu m 650.00 409,500.00 685.00 431,550.00        
805-12-I reinforced concrete box culverts (1500 mm x 1500 mm) 212.00   ln m 1,000.00 212,000.00 1,250.00 265,000.00        
805-12-P reinforced concrete box culverts (2100 mm x 2100 mm) 195.00   ln m 1,800.00 351,000.00 1,800.00 351,000.00        
806-01 deformed reinforcing steel 80,726      kg 1.75 141,270.50 1.70 137,234.20        
810-01 concrete railing (barrier) 264.00   ln m 140.00 36,960.00 175.00 46,200.00        
813-01 concrete approach slabs 1,180.08   sq m 170.00 200,613.60 185.00 218,314.80        
S-001 relocation of cattle guard and fence lump      lump 15,000.00 15,000.00 20,000.00 20,000.00        
S-002 obliterate existing roadway and grade to drain (site 8) 521.0    ln.m 50.00 26,050.00 150.00 78,150.00        
                       
 CONTRACTOR TOTAL       5,993,584.43   7,828,259.07        