| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JAMES CONSTRUCTION GROUP LLC |
- 2 - AUSTIN BRIDGE & ROAD, LP |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
- 4 - GILBERT SOUTHERN CORP |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
385,000.00 |
385,000.00 |
350,000.00 |
350,000.00 |
1,600,000.00 |
1,600,000.00 |
400,000.00 |
400,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
40,000.00 |
40,000.00 |
15,800.00 |
15,800.00 |
50,000.00 |
50,000.00 |
100,000.00 |
100,000.00 |
| 202-02-A |
removal of bridges
|
1   |
ea |
800,000.00 |
800,000.00 |
2,000,000.00 |
2,000,000.00 |
800,000.00 |
800,000.00 |
500,000.00 |
500,000.00 |
| 202-02-B |
removal of concrete box culverts (sta. 17+953; 1-1.22m
x 1.22m x 21.61m r.c . box) |
1   |
ea |
2,000.00 |
2,000.00 |
3,200.00 |
3,200.00 |
3,500.00 |
3,500.00 |
10,000.00 |
10,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
3,393   |
sq m |
12.00 |
40,716.00 |
12.00 |
40,716.00 |
5.00 |
16,965.00 |
10.00 |
33,930.00 |
| 202-02-D |
removal of concrete walks & drives
|
6,478   |
sq m |
8.00 |
51,824.00 |
12.00 |
77,736.00 |
5.00 |
32,390.00 |
8.00 |
51,824.00 |
| 202-02-F |
removal of concrete combination curb & gutter
|
87.0 |
ln m |
26.00 |
2,262.00 |
26.00 |
2,262.00 |
25.00 |
2,175.00 |
20.00 |
1,740.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
8,893.3 |
sq m |
7.00 |
62,253.10 |
5.00 |
44,466.50 |
5.00 |
44,466.50 |
8.00 |
71,146.40 |
| 202-02-I |
removal of existing traffic signal equipment
|
lump |
lump |
2,000.00 |
2,000.00 |
2,100.00 |
2,100.00 |
2,400.00 |
2,400.00 |
2,000.00 |
2,000.00 |
| 202-02-01 |
removal of concrete slab (sta. 15+287, rt., 60 square
meters) |
1   |
ea |
500.00 |
500.00 |
500.00 |
500.00 |
800.00 |
800.00 |
500.00 |
500.00 |
| 202-02-02 |
removal of concrete building (sta. 15+371, rt.,
27 square meters) |
1   |
ea |
900.00 |
900.00 |
500.00 |
500.00 |
800.00 |
800.00 |
500.00 |
500.00 |
| 202-02-03 |
removal of 2-story brick building (sta. 15+404, lt.,
335 square meters) |
1   |
ea |
10,400.00 |
10,400.00 |
10,300.00 |
10,300.00 |
5,500.00 |
5,500.00 |
10,000.00 |
10,000.00 |
| 202-02-04 |
removal of 3" pipe fencing (sta. 15+404, lt.)
|
1   |
ea |
500.00 |
500.00 |
500.00 |
500.00 |
1,500.00 |
1,500.00 |
500.00 |
500.00 |
| 202-02-05 |
removal of underground storage tank (sta. 15+462,
approximately 4.5m rt.) |
1   |
ea |
3,000.00 |
3,000.00 |
8,800.00 |
8,800.00 |
10,000.00 |
10,000.00 |
8,500.00 |
8,500.00 |
| 202-02-06 |
removal of concrete slab (sta. 15+550, rt., 11 square
meters) |
1   |
ea |
50.00 |
50.00 |
100.00 |
100.00 |
400.00 |
400.00 |
50.00 |
50.00 |
| 202-02-07 |
removal of brick building (sta. 15+575, 433 square
meters) |
1   |
ea |
6,400.00 |
6,400.00 |
7,700.00 |
7,700.00 |
15,000.00 |
15,000.00 |
7,500.00 |
7,500.00 |
| 202-02-08 |
removal of sign (sta. 15+575, pipe material)
|
1   |
ea |
200.00 |
200.00 |
200.00 |
200.00 |
500.00 |
500.00 |
200.00 |
200.00 |
| 202-02-09 |
removal of brick building (sta. 15+601, lt.,
1300 square meters) |
1   |
ea |
2,900.00 |
2,900.00 |
2,600.00 |
2,600.00 |
15,000.00 |
15,000.00 |
2,500.00 |
2,500.00 |
| 202-02-10 |
removal of concrete cinderblock building (sta. 15+601,
lt., 232 square mete rs) |
1   |
ea |
700.00 |
700.00 |
300.00 |
300.00 |
5,000.00 |
5,000.00 |
300.00 |
300.00 |
| 202-02-11 |
removal of underground storage tanks (located on
parcel 3-1, 3000 gallon/ea ch) |
5   |
ea |
4,000.00 |
20,000.00 |
8,800.00 |
44,000.00 |
10,000.00 |
50,000.00 |
8,500.00 |
42,500.00 |
| 202-02-12 |
removal of undergound storage tanks (located on parcel
3-4) |
4   |
ea |
4,000.00 |
16,000.00 |
8,800.00 |
35,200.00 |
10,000.00 |
40,000.00 |
8,500.00 |
34,000.00 |
| 202-02-13 |
removal of concrete slab (sta. 15+659, lt.,
1106 square meters) |
1   |
ea |
2,000.00 |
2,000.00 |
2,100.00 |
2,100.00 |
5,000.00 |
5,000.00 |
2,000.00 |
2,000.00 |
| 202-02-14 |
removal of metal storage building (sta. 15+705, rt.,
28 square meters) |
1   |
ea |
300.00 |
300.00 |
300.00 |
300.00 |
800.00 |
800.00 |
300.00 |
300.00 |
| 202-02-15 |
removal of metal/cinderblock building (sta. 15+730,
1300 square meters) |
1   |
ea |
8,400.00 |
8,400.00 |
8,300.00 |
8,300.00 |
20,000.00 |
20,000.00 |
8,000.00 |
8,000.00 |
| 202-02-16 |
removal of wood frame 2-story residence (sta. 15+830,
rt., 285 square meter s) |
1   |
ea |
2,400.00 |
2,400.00 |
2,600.00 |
2,600.00 |
5,000.00 |
5,000.00 |
2,000.00 |
2,000.00 |
| 202-02-17 |
removal of dop pen (sta. 15+830, rt.ta. 15+830, rt.,
6 square meters) |
1   |
ea |
1.00 |
1.00 |
300.00 |
300.00 |
500.00 |
500.00 |
1.00 |
1.00 |
| 202-02-18 |
removal of metal radio tower (sta. 17+250)
|
1   |
ea |
500.00 |
500.00 |
2,600.00 |
2,600.00 |
800.00 |
800.00 |
100.00 |
100.00 |
| 202-02-19 |
removal of metal mobile home (immobilized)(sta. 17+460)
|
1   |
ea |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
1,000.00 |
1,000.00 |
| 202-02-20 |
removal of concrete slab (sta. 17+460, 13 square
meters) |
1   |
ea |
300.00 |
300.00 |
300.00 |
300.00 |
500.00 |
500.00 |
300.00 |
300.00 |
| 202-02-21 |
removal of wood carport (sta. 17+945, rt.)
|
1   |
ea |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
500.00 |
500.00 |
100.00 |
100.00 |
| 202-02-22 |
removal of garage (sta. 18+129, rt., 24 square meters)
|
1   |
ea |
500.00 |
500.00 |
500.00 |
500.00 |
800.00 |
800.00 |
500.00 |
500.00 |
| 202-02-23 |
removal of fence and 2 gates (sta. 18+129, rt.)
|
1   |
ea |
300.00 |
300.00 |
300.00 |
300.00 |
800.00 |
800.00 |
300.00 |
300.00 |
| 202-02-24 |
removal of building (sta. 18+300, rt., 372 square
meters) |
1   |
ea |
7,400.00 |
7,400.00 |
7,200.00 |
7,200.00 |
5,500.00 |
5,500.00 |
7,000.00 |
7,000.00 |
| 202-02-25 |
removal of underground storage tanks (sta. 18+300, rt.)
|
1   |
ea |
4,000.00 |
4,000.00 |
8,800.00 |
8,800.00 |
10,000.00 |
10,000.00 |
8,500.00 |
8,500.00 |
| 202-02-26 |
removal of concrete slab (sta. 18+300, rt., 11 square
meters) |
1   |
ea |
300.00 |
300.00 |
300.00 |
300.00 |
500.00 |
500.00 |
300.00 |
300.00 |
| 202-02-27 |
removal of canopy (sta. 18+300, rt., 78 square meters)
|
1   |
ea |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
800.00 |
800.00 |
1,000.00 |
1,000.00 |
| 202-02-28 |
removal of dispensing pump (sta. 18+300, rt.)
|
1   |
ea |
500.00 |
500.00 |
4,600.00 |
4,600.00 |
5,000.00 |
5,000.00 |
4,500.00 |
4,500.00 |
| 202-02-29 |
removal of coin operated vacuums (sta. 18+344, rt.)
|
1   |
ea |
200.00 |
200.00 |
200.00 |
200.00 |
400.00 |
400.00 |
200.00 |
200.00 |
| 202-02-30 |
removal of cinderblock car wash bay (sta. 18+344, rt.)
|
1   |
ea |
3,000.00 |
3,000.00 |
3,100.00 |
3,100.00 |
10,000.00 |
10,000.00 |
3,000.00 |
3,000.00 |
| 202-02-31 |
removal of underground storage tanks (located on
parcel 10-11, 4000 gallon/ each) |
4   |
ea |
4,000.00 |
16,000.00 |
8,800.00 |
35,200.00 |
10,000.00 |
40,000.00 |
8,500.00 |
34,000.00 |
| 202-02-32 |
removal of sign frame (sta. 18+400, rt.)
|
1   |
ea |
200.00 |
200.00 |
200.00 |
200.00 |
400.00 |
400.00 |
200.00 |
200.00 |
| 202-02-33 |
removal of mobile home (sta. 1+105, rt. 75 square
meters) |
1   |
ea |
300.00 |
300.00 |
300.00 |
300.00 |
1,500.00 |
1,500.00 |
300.00 |
300.00 |
| 202-02-34 |
removal of storage building (sta. 1+163, rt.,
24 square meters) |
1   |
ea |
300.00 |
300.00 |
300.00 |
300.00 |
800.00 |
800.00 |
300.00 |
300.00 |
| 202-02-35 |
removal of metal mobile home (sta. 1+212, rt.
58 square meters) |
1   |
ea |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
800.00 |
800.00 |
1,000.00 |
1,000.00 |
| 202-02-36 |
removal of storage building (sta. 1+270, rt., 6 square
meters) |
1   |
ea |
100.00 |
100.00 |
100.00 |
100.00 |
400.00 |
400.00 |
100.00 |
100.00 |
| 202-02-37 |
removal of storage building (sta. 1+350, rt.,
13 square meters) |
1   |
ea |
200.00 |
200.00 |
200.00 |
200.00 |
400.00 |
400.00 |
200.00 |
200.00 |
| 202-02-38 |
removal of storage building (sta. 1+352, rt.,
22 square meters) |
1   |
ea |
300.00 |
300.00 |
300.00 |
300.00 |
800.00 |
800.00 |
300.00 |
300.00 |
| 202-02-39 |
removal of pig pen (sta. 1+370, rt., 14 square meters)
|
1   |
ea |
0.01 |
0.01 |
300.00 |
300.00 |
400.00 |
400.00 |
1.00 |
1.00 |
| 202-05 |
excavation, disposal and backfilling of contaminated
soil (parcel 1-2, (3)1 000 gallon ust's) |
130   |
cu m |
85.00 |
11,050.00 |
200.00 |
26,000.00 |
225.00 |
29,250.00 |
250.00 |
32,500.00 |
| 202-06 |
removal and disposal of contaminated fluid
|
60,000   |
l |
1.00 |
60,000.00 |
1.60 |
96,000.00 |
0.60 |
36,000.00 |
1.50 |
90,000.00 |
| 203-01 |
general excavation
|
62,245   |
cu m |
7.00 |
435,715.00 |
5.00 |
311,225.00 |
8.00 |
497,960.00 |
10.00 |
622,450.00 |
| 203-02 |
drainage excavation
|
418   |
cu m |
16.00 |
6,688.00 |
8.00 |
3,344.00 |
8.00 |
3,344.00 |
10.00 |
4,180.00 |
| 203-03 |
muck excavation
|
28,000   |
cu m |
15.00 |
420,000.00 |
7.00 |
196,000.00 |
11.00 |
308,000.00 |
10.00 |
280,000.00 |
| 203-04 |
embankment
|
165,799   |
cu m |
15.50 |
2,569,884.50 |
10.00 |
1,657,990.00 |
20.00 |
3,315,980.00 |
15.00 |
2,486,985.00 |
| 204-02 |
temporary hay or straw bales
|
10   |
ea |
10.00 |
100.00 |
10.00 |
100.00 |
100.00 |
1,000.00 |
6.00 |
60.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
10   |
ea |
150.00 |
1,500.00 |
206.00 |
2,060.00 |
500.00 |
5,000.00 |
85.00 |
850.00 |
| 204-06 |
temporary silt fencing
|
1,800   |
ln m |
4.00 |
7,200.00 |
4.00 |
7,200.00 |
10.00 |
18,000.00 |
3.00 |
5,400.00 |
| 302-02-B |
class ii base course (220mm thick)
|
3,240.9 |
sq m |
24.00 |
77,781.60 |
36.00 |
116,672.40 |
25.00 |
81,022.50 |
15.00 |
48,613.50 |
| 302-02-C |
class ii base course (250mm thick)
|
12,047.2 |
sq m |
26.00 |
313,227.20 |
30.00 |
361,416.00 |
25.00 |
301,180.00 |
23.00 |
277,085.60 |
| 302-02-D |
class ii base course (300mm thick)
|
36,342.0 |
sq m |
32.00 |
1,162,944.00 |
33.00 |
1,199,286.00 |
30.00 |
1,090,260.00 |
25.00 |
908,550.00 |
| 304-01 |
lime
|
354.00 |
Mg |
150.00 |
53,100.00 |
155.00 |
54,870.00 |
150.00 |
53,100.00 |
150.00 |
53,100.00 |
| 304-04-B |
lime treatment (type d) (220mm thick)
|
1,059   |
sq m |
4.00 |
4,236.00 |
6.00 |
6,354.00 |
5.00 |
5,295.00 |
5.00 |
5,295.00 |
| 304-04-D |
lime treatment (type d) (300mm thick)
|
22,601   |
sq m |
3.00 |
67,803.00 |
5.00 |
113,005.00 |
5.00 |
113,005.00 |
3.00 |
67,803.00 |
| 401-01 |
aggregate surface course (net section)
|
47.1 |
cu m |
75.00 |
3,532.50 |
75.00 |
3,532.50 |
100.00 |
4,710.00 |
60.00 |
2,826.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
490.0 |
cu m |
95.00 |
46,550.00 |
66.00 |
32,340.00 |
100.00 |
49,000.00 |
40.00 |
19,600.00 |
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
400.0 |
cu m |
115.00 |
46,000.00 |
103.00 |
41,200.00 |
70.00 |
28,000.00 |
80.00 |
32,000.00 |
| 502-01 |
superpave asphaltic concrete
|
21,970.0 |
Mg |
85.00 |
1,867,450.00 |
88.00 |
1,933,360.00 |
75.00 |
1,647,750.00 |
85.00 |
1,867,450.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
196.9 |
Mg |
185.00 |
36,426.50 |
191.00 |
37,607.90 |
300.00 |
59,070.00 |
185.00 |
36,426.50 |
| 509-01 |
cold planing asphaltic pavement
|
4,559   |
sq m |
3.00 |
13,677.00 |
3.00 |
13,677.00 |
5.00 |
22,795.00 |
2.00 |
9,118.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 114   |
cu m |
0.01 |
- 1.14 |
1.00 |
- 114.00 |
1.00 |
- 114.00 |
1.05 |
- 119.70 |
| 601-01-K |
portland cement concrete pavement (250mm thick)
|
9,122.2 |
sq m |
90.00 |
820,998.00 |
73.00 |
665,920.60 |
75.00 |
684,165.00 |
57.00 |
519,965.40 |
| 601-02-K |
portland cement concrete pavement (250mm thick)
(crossovers & turnouts) |
1,964.2 |
sq m |
90.00 |
176,778.00 |
75.00 |
147,315.00 |
95.00 |
186,599.00 |
60.00 |
117,852.00 |
| 701-01-I |
cross drain pipe (600mm rcp/pcp)
|
104.5 |
ln m |
240.00 |
25,080.00 |
210.00 |
21,945.00 |
250.00 |
26,125.00 |
200.00 |
20,900.00 |
| 701-02-E |
cross drain pipe arch (750mm equiv. rcpa)
|
60.0 |
ln m |
350.00 |
21,000.00 |
250.00 |
15,000.00 |
300.00 |
18,000.00 |
240.00 |
14,400.00 |
| 701-02-H |
cross drain pipe arch (1200mm equiv. rcpa)
|
320.0 |
ln m |
540.00 |
172,800.00 |
550.00 |
176,000.00 |
550.00 |
176,000.00 |
520.00 |
166,400.00 |
| 701-03-F |
storm drain pipe (375mm rcp/pcp)
|
450.6 |
ln m |
150.00 |
67,590.00 |
130.00 |
58,578.00 |
150.00 |
67,590.00 |
120.00 |
54,072.00 |
| 701-03-G |
storm drain pipe (450mm rcp/pcp)
|
243.8 |
ln m |
165.00 |
40,227.00 |
150.00 |
36,570.00 |
190.00 |
46,322.00 |
140.00 |
34,132.00 |
| 701-03-I |
storm drain pipe (600mm rcp/pcp)
|
143.2 |
ln m |
240.00 |
34,368.00 |
190.00 |
27,208.00 |
260.00 |
37,232.00 |
180.00 |
25,776.00 |
| 701-03-K |
storm drain pipe (750mm rcp/pcp)
|
207.8 |
ln m |
260.00 |
54,028.00 |
260.00 |
54,028.00 |
300.00 |
62,340.00 |
250.00 |
51,950.00 |
| 701-03-N |
storm drain pipe (1050mm rcp/pcp)
|
300.4 |
ln m |
465.00 |
139,686.00 |
470.00 |
141,188.00 |
500.00 |
150,200.00 |
450.00 |
135,180.00 |
| 701-03-O |
storm drain pipe (1200mm rcp/pcp)
|
79.0 |
ln m |
535.00 |
42,265.00 |
580.00 |
45,820.00 |
750.00 |
59,250.00 |
550.00 |
43,450.00 |
| 701-03-Q |
storm drain pipe (1500mm rcp/pcp)
|
41.7 |
ln m |
810.00 |
33,777.00 |
790.00 |
32,943.00 |
800.00 |
33,360.00 |
750.00 |
31,275.00 |
| 701-05-G |
side drain pipe (450mm)
|
128.9 |
ln m |
175.00 |
22,557.50 |
150.00 |
19,335.00 |
200.00 |
25,780.00 |
140.00 |
18,046.00 |
| 702-02-F |
manholes (mh-01)
|
8   |
ea |
4,500.00 |
36,000.00 |
3,400.00 |
27,200.00 |
3,000.00 |
24,000.00 |
3,200.00 |
25,600.00 |
| 702-03-A |
catch basins (cb-01)
|
13   |
ea |
3,100.00 |
40,300.00 |
3,400.00 |
44,200.00 |
3,000.00 |
39,000.00 |
3,200.00 |
41,600.00 |
| 702-03-B |
catch basins (cb-02)
|
3   |
ea |
3,600.00 |
10,800.00 |
5,900.00 |
17,700.00 |
7,500.00 |
22,500.00 |
5,600.00 |
16,800.00 |
| 702-03-C |
catch basins (cb-06)
|
24   |
ea |
3,150.00 |
75,600.00 |
4,200.00 |
100,800.00 |
4,500.00 |
108,000.00 |
4,000.00 |
96,000.00 |
| 702-03-D |
catch basins (cb-07)
|
2   |
ea |
3,500.00 |
7,000.00 |
5,500.00 |
11,000.00 |
6,000.00 |
12,000.00 |
5,200.00 |
10,400.00 |
| 702-03-F |
catch basins (cb-08)
|
9   |
ea |
5,600.00 |
50,400.00 |
7,500.00 |
67,500.00 |
9,000.00 |
81,000.00 |
7,100.00 |
63,900.00 |
| 702-03-G |
catch basins (cb-09)
|
2   |
ea |
3,900.00 |
7,800.00 |
5,600.00 |
11,200.00 |
8,000.00 |
16,000.00 |
5,300.00 |
10,600.00 |
| 702-04-A |
adjusting manholes
|
3   |
ea |
1,600.00 |
4,800.00 |
1,100.00 |
3,300.00 |
2,000.00 |
6,000.00 |
1,000.00 |
3,000.00 |
| 704-03 |
blocked out guard rail
|
68.58 |
ln m |
55.00 |
3,771.90 |
62.00 |
4,251.96 |
65.00 |
4,457.70 |
60.00 |
4,114.80 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
15.24 |
ln m |
175.00 |
2,667.00 |
160.00 |
2,438.40 |
165.00 |
2,514.60 |
150.00 |
2,286.00 |
| 704-11-A |
guard rail end treatment (flared)
|
2   |
ea |
2,000.00 |
4,000.00 |
2,600.00 |
5,200.00 |
2,600.00 |
5,200.00 |
2,500.00 |
5,000.00 |
| 705-02 |
combination mesh & barbed wire fence
|
140   |
ln m |
20.00 |
2,800.00 |
18.40 |
2,576.00 |
20.00 |
2,800.00 |
18.00 |
2,520.00 |
| 705-06-C |
chain link fence (1800mm height)
|
601   |
ln m |
70.00 |
42,070.00 |
61.00 |
36,661.00 |
65.00 |
39,065.00 |
60.00 |
36,060.00 |
| 706-02-C |
concrete drive (150mm thick)
|
870.0 |
sq m |
50.00 |
43,500.00 |
69.00 |
60,030.00 |
55.00 |
47,850.00 |
50.00 |
43,500.00 |
| 706-03-C |
incidental concrete paving (150mm thick)
|
22.5 |
sq m |
100.00 |
2,250.00 |
110.00 |
2,475.00 |
200.00 |
4,500.00 |
100.00 |
2,250.00 |
| 707-01 |
concrete curb
|
1,098.2 |
ln m |
30.00 |
32,946.00 |
7.00 |
7,687.40 |
30.00 |
32,946.00 |
20.00 |
21,964.00 |
| 707-03 |
combination concrete curb & gutter
|
357.7 |
ln m |
55.00 |
19,673.50 |
100.00 |
35,770.00 |
120.00 |
42,924.00 |
50.00 |
17,885.00 |
| 708-01 |
right-of-way monument
|
89   |
ea |
150.00 |
13,350.00 |
300.00 |
26,700.00 |
300.00 |
26,700.00 |
150.00 |
13,350.00 |
| 708-02 |
right-of-way monument witness post
|
44   |
ea |
150.00 |
6,600.00 |
200.00 |
8,800.00 |
300.00 |
13,200.00 |
150.00 |
6,600.00 |
| 711-01-D |
riprap (25 kg, 300mm thick)
|
1,499   |
sq m |
45.00 |
67,455.00 |
49.00 |
73,451.00 |
60.00 |
89,940.00 |
50.00 |
74,950.00 |
| 711-04 |
geotextile fabric
|
1,499   |
sq m |
4.00 |
5,996.00 |
2.00 |
2,998.00 |
4.00 |
5,996.00 |
4.00 |
5,996.00 |
| 712-01-A |
concrete cast-in-place revetment (100mm thick)
|
736.0 |
sq m |
60.00 |
44,160.00 |
66.00 |
48,576.00 |
100.00 |
73,600.00 |
100.00 |
73,600.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
125,000.00 |
125,000.00 |
250,000.00 |
250,000.00 |
150,000.00 |
150,000.00 |
250,000.00 |
250,000.00 |
| 713-03-A |
temporary pavement markings (100mm width)
|
2,400   |
ln m |
1.00 |
2,400.00 |
1.00 |
2,400.00 |
1.00 |
2,400.00 |
0.65 |
1,560.00 |
| 713-05-A-01 |
temporary pavement markings (solid line)(100 mm width)
(type i removable) |
1.600 |
km |
8,900.00 |
14,240.00 |
9,200.00 |
14,720.00 |
9,000.00 |
14,400.00 |
8,200.00 |
13,120.00 |
| 716-01-A |
mulch (vegetative)
|
19.3 |
hctr |
1,500.00 |
28,950.00 |
1,900.00 |
36,670.00 |
1,600.00 |
30,880.00 |
935.00 |
18,045.50 |
| 717-01 |
seeding
|
1,130   |
kg |
16.00 |
18,080.00 |
19.00 |
21,470.00 |
20.00 |
22,600.00 |
16.50 |
18,645.00 |
| 718-01 |
fertilizer
|
21,627   |
kg |
0.50 |
10,813.50 |
0.70 |
15,138.90 |
0.60 |
12,976.20 |
0.50 |
10,813.50 |
| 722-01 |
project site laboratory
|
1   |
ea |
15,000.00 |
15,000.00 |
14,000.00 |
14,000.00 |
24,000.00 |
24,000.00 |
10,000.00 |
10,000.00 |
| 724-01-B |
pavement patching (300mm minimum thickness)
|
330   |
sq m |
150.00 |
49,500.00 |
110.00 |
36,300.00 |
160.00 |
52,800.00 |
50.00 |
16,500.00 |
| 725-02 |
temporary detour roads
|
524.8 |
sq m |
90.00 |
47,232.00 |
103.00 |
54,054.40 |
65.00 |
34,112.00 |
50.00 |
26,240.00 |
| 726-01 |
bedding material
|
1,579.1 |
cu m |
75.00 |
118,432.50 |
59.00 |
93,166.90 |
100.00 |
157,910.00 |
50.00 |
78,955.00 |
| 727-01 |
mobilization
|
lump |
lump |
2,500,000.00 |
2,500,000.00 |
3,250,000.00 |
3,250,000.00 |
3,200,000.00 |
3,200,000.00 |
3,400,000.00 |
3,400,000.00 |
| 729-01 |
sign (type a)
|
3.72 |
sq m |
150.00 |
558.00 |
130.00 |
483.60 |
150.00 |
558.00 |
125.00 |
465.00 |
| 729-16-C |
object marker assembly (type 3)
|
30   |
ea |
80.00 |
2,400.00 |
72.00 |
2,160.00 |
85.00 |
2,550.00 |
70.00 |
2,100.00 |
| 729-17 |
milepost assembly (ground mounted)
|
8   |
ea |
115.00 |
920.00 |
120.00 |
960.00 |
130.00 |
1,040.00 |
115.00 |
920.00 |
| 729-19-B |
dead end road installation (type b)
|
1   |
ea |
1,500.00 |
1,500.00 |
1,500.00 |
1,500.00 |
2,500.00 |
2,500.00 |
1,500.00 |
1,500.00 |
| 729-19-C |
dead end road installation (type c)
|
4   |
ea |
450.00 |
1,800.00 |
600.00 |
2,400.00 |
600.00 |
2,400.00 |
550.00 |
2,200.00 |
| 729-21 |
u-channel post
|
4   |
ea |
80.00 |
320.00 |
77.00 |
308.00 |
85.00 |
340.00 |
75.00 |
300.00 |
| 731-01 |
nonreflectorized raised pavement markers
|
1,020   |
ea |
10.00 |
10,200.00 |
10.00 |
10,200.00 |
15.00 |
15,300.00 |
14.00 |
14,280.00 |
| 731-02 |
reflectorized raised pavement markers
|
993   |
ea |
5.00 |
4,965.00 |
5.00 |
4,965.00 |
6.00 |
5,958.00 |
5.50 |
5,461.50 |
| 732-01-B |
plastic pavement striping (150mm width)
|
140   |
ln m |
2.00 |
280.00 |
2.00 |
280.00 |
2.50 |
350.00 |
2.00 |
280.00 |
| 732-01-C |
plastic pavement striping (200mm width)
|
160   |
ln m |
3.00 |
480.00 |
3.00 |
480.00 |
4.00 |
640.00 |
3.00 |
480.00 |
| 732-01-D |
plastic pavement striping (300mm width)
|
130   |
ln m |
4.00 |
520.00 |
4.00 |
520.00 |
5.00 |
650.00 |
4.00 |
520.00 |
| 732-02-A |
plastic pavement striping (solid line)(100mm width)
|
15.256 |
km |
1,200.00 |
18,307.20 |
1,200.00 |
18,307.20 |
1,600.00 |
24,409.60 |
1,500.00 |
22,884.00 |
| 732-02-E |
plastic pavement striping (solid line)(600mm width)
|
0.497 |
km |
7,800.00 |
3,876.60 |
8,100.00 |
4,025.70 |
9,500.00 |
4,721.50 |
9,000.00 |
4,473.00 |
| 732-03-A |
plastic pavement striping (broken line)(100mm width)
|
6.891 |
km |
500.00 |
3,445.50 |
500.00 |
3,445.50 |
1,400.00 |
9,647.40 |
1,300.00 |
8,958.30 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
14   |
ea |
125.00 |
1,750.00 |
130.00 |
1,820.00 |
200.00 |
2,800.00 |
150.00 |
2,100.00 |
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
1   |
ea |
200.00 |
200.00 |
210.00 |
210.00 |
250.00 |
250.00 |
1.00 |
1.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
15   |
ea |
150.00 |
2,250.00 |
150.00 |
2,250.00 |
200.00 |
3,000.00 |
155.00 |
2,325.00 |
| 735-01 |
mailboxes
|
20   |
ea |
75.00 |
1,500.00 |
26.00 |
520.00 |
100.00 |
2,000.00 |
10.00 |
200.00 |
| 735-02 |
mailbox supports (single)
|
20   |
ea |
300.00 |
6,000.00 |
155.00 |
3,100.00 |
200.00 |
4,000.00 |
100.00 |
2,000.00 |
| 736-01 |
trenching and backfilling
|
116   |
ln m |
10.00 |
1,160.00 |
11.00 |
1,276.00 |
12.00 |
1,392.00 |
10.00 |
1,160.00 |
| 736-04-A |
signal support (7.62m galvanized steel strain pole)
|
1   |
ea |
6,000.00 |
6,000.00 |
6,200.00 |
6,200.00 |
6,500.00 |
6,500.00 |
6,000.00 |
6,000.00 |
| 736-04-B |
signal support (7.92m galvanized steel strain pole)
|
3   |
ea |
6,000.00 |
18,000.00 |
6,200.00 |
18,600.00 |
6,500.00 |
19,500.00 |
6,000.00 |
18,000.00 |
| 736-05 |
signal heads (3-section, 300mm lens)
|
10   |
ea |
1,000.00 |
10,000.00 |
1,000.00 |
10,000.00 |
1,100.00 |
11,000.00 |
1,000.00 |
10,000.00 |
| 736-06 |
signal service
|
1   |
ea |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,100.00 |
1,100.00 |
1,000.00 |
1,000.00 |
| 736-08 |
signal controller (type iii, pole mounted, 8-phase)
|
1   |
ea |
14,000.00 |
14,000.00 |
14,500.00 |
14,500.00 |
15,000.00 |
15,000.00 |
14,000.00 |
14,000.00 |
| 736-09 |
loop detector
|
261   |
ln m |
25.00 |
6,525.00 |
26.00 |
6,786.00 |
27.00 |
7,047.00 |
25.00 |
6,525.00 |
| 736-10 |
underground junction box (type d)
|
6   |
ea |
350.00 |
2,100.00 |
360.00 |
2,160.00 |
500.00 |
3,000.00 |
350.00 |
2,100.00 |
| 736-11 |
conduit (25mm rigid)
|
116   |
ln m |
8.50 |
986.00 |
9.00 |
1,044.00 |
9.00 |
1,044.00 |
8.50 |
986.00 |
| 736-12-A |
conductor (2c loop lead - in/#16 awg)
|
127   |
ln m |
4.00 |
508.00 |
4.00 |
508.00 |
4.50 |
571.50 |
4.00 |
508.00 |
| 736-12-B |
conductor (power)
|
7   |
ln m |
15.00 |
105.00 |
15.00 |
105.00 |
16.00 |
112.00 |
15.00 |
105.00 |
| 740-01 |
construction layout
|
lump |
lump |
300,000.00 |
300,000.00 |
500,000.00 |
500,000.00 |
260,000.00 |
260,000.00 |
300,000.00 |
300,000.00 |
| 742-01 |
sanitary sewer pipe (200mm)
|
148   |
ln m |
50.00 |
7,400.00 |
210.00 |
31,080.00 |
100.00 |
14,800.00 |
200.00 |
29,600.00 |
| 742-02 |
adjusting sanitary sewer house connections
|
6   |
ea |
500.00 |
3,000.00 |
970.00 |
5,820.00 |
1,500.00 |
9,000.00 |
600.00 |
3,600.00 |
| 742-03 |
adjusting sanitary sewer service lines
|
85   |
ln m |
90.00 |
7,650.00 |
390.00 |
33,150.00 |
85.00 |
7,225.00 |
80.00 |
6,800.00 |
| 744-01 |
traffic control management
|
lump |
lump |
10,000.00 |
10,000.00 |
100,000.00 |
100,000.00 |
80,000.00 |
80,000.00 |
100,000.00 |
100,000.00 |
| 802-02 |
structural excavation for intermediate bents
|
4,187.3 |
cu m |
30.00 |
125,619.00 |
31.00 |
129,806.30 |
25.00 |
104,682.50 |
25.00 |
104,682.50 |
| 802-04 |
structural excavation for piers (wet)
|
716.1 |
cu m |
100.00 |
71,610.00 |
33.00 |
23,631.30 |
40.00 |
28,644.00 |
200.00 |
143,220.00 |
| 804-01-B |
precast concrete piles (350mm)
|
17,607.0 |
ln m |
140.00 |
2,464,980.00 |
140.00 |
2,464,980.00 |
110.00 |
1,936,770.00 |
145.00 |
2,553,015.00 |
| 804-05 |
precast concrete test piles
|
2   |
ea |
25,000.00 |
50,000.00 |
7,900.00 |
15,800.00 |
30,000.00 |
60,000.00 |
10,000.00 |
20,000.00 |
| 804-09 |
loading test piles
|
2   |
ea |
8,000.00 |
16,000.00 |
27,800.00 |
55,600.00 |
5,000.00 |
10,000.00 |
5,000.00 |
10,000.00 |
| 804-10 |
reloading test piles
|
2   |
ea |
1,000.00 |
2,000.00 |
7,700.00 |
15,400.00 |
100.00 |
200.00 |
5,000.00 |
10,000.00 |
| 804-11 |
redriving test piles
|
2   |
ea |
1,000.00 |
2,000.00 |
3,900.00 |
7,800.00 |
100.00 |
200.00 |
5,000.00 |
10,000.00 |
| 804-12 |
loading permanent piles
|
2   |
ea |
500.00 |
1,000.00 |
15,000.00 |
30,000.00 |
100.00 |
200.00 |
5,000.00 |
10,000.00 |
| 804-17 |
dynamic monitoring
|
7   |
ea |
1,500.00 |
10,500.00 |
3,000.00 |
21,000.00 |
3,000.00 |
21,000.00 |
5,000.00 |
35,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
45.30 |
cu m |
1,200.00 |
54,360.00 |
1,300.00 |
58,890.00 |
1,500.00 |
67,950.00 |
1,000.00 |
45,300.00 |
| 805-01-D |
class a concrete (footings)
|
1,785.65 |
cu m |
250.00 |
446,412.50 |
350.00 |
624,977.50 |
500.00 |
892,825.00 |
400.00 |
714,260.00 |
| 805-01-F |
class a concrete (bents)
|
2,205.57 |
cu m |
600.00 |
1,323,342.00 |
470.00 |
1,036,617.90 |
800.00 |
1,764,456.00 |
1,214.00 |
2,677,561.98 |
| 805-03 |
class aa concrete
|
4,804.70 |
cu m |
570.00 |
2,738,679.00 |
580.00 |
2,786,726.00 |
600.00 |
2,882,820.00 |
700.00 |
3,363,290.00 |
| 805-07 |
class s concrete
|
125.20 |
cu m |
275.00 |
34,430.00 |
1,390.00 |
174,028.00 |
250.00 |
31,300.00 |
200.00 |
25,040.00 |
| 805-08-G |
precast-prestressed concrete girders (type bt-72)
|
5,973.96 |
ln m |
700.00 |
4,181,772.00 |
770.00 |
4,599,949.20 |
650.00 |
3,883,074.00 |
750.00 |
4,480,470.00 |
| 805-11 |
strip seal joints (102mm)
|
312.00 |
ln m |
380.00 |
118,560.00 |
410.00 |
127,920.00 |
400.00 |
124,800.00 |
500.00 |
156,000.00 |
| 805-12-M |
reinforced concrete box culverts (1800mm x 1800mm)
|
452.80 |
ln m |
1,700.00 |
769,760.00 |
1,500.00 |
679,200.00 |
1,300.00 |
588,640.00 |
1,400.00 |
633,920.00 |
| 806-01 |
deformed reinforcing steel
|
1,110,669   |
kg |
1.80 |
1,999,204.20 |
1.70 |
1,888,137.30 |
1.60 |
1,777,070.40 |
2.00 |
2,221,338.00 |
| 807-06 |
structural metalwork
|
lump |
lump |
70,000.00 |
70,000.00 |
50,000.00 |
50,000.00 |
30,000.00 |
30,000.00 |
200,000.00 |
200,000.00 |
| 810-01-A |
concrete railing (barrier)
|
1,564.40 |
ln m |
175.00 |
273,770.00 |
160.00 |
250,304.00 |
140.00 |
219,016.00 |
100.00 |
156,440.00 |
| 810-01-B |
concrete railing (median barrier)
|
1,396.34 |
ln m |
200.00 |
279,268.00 |
180.00 |
251,341.20 |
160.00 |
223,414.40 |
100.00 |
139,634.00 |
| 813-01 |
concrete approach slabs
|
590.00 |
sq m |
190.00 |
112,100.00 |
190.00 |
112,100.00 |
155.00 |
91,450.00 |
250.00 |
147,500.00 |
| S-001 |
traffic maintenance superpave asphaltic concrete
|
150.0 |
Mg |
250.00 |
37,500.00 |
110.00 |
16,500.00 |
250.00 |
37,500.00 |
250.00 |
37,500.00 |
| S-002 |
rumble strips(ground-in)
|
12.3 |
km |
500.00 |
6,150.00 |
700.00 |
8,610.00 |
800.00 |
9,840.00 |
700.00 |
8,610.00 |
| S-101 |
median barrier footing
|
588.14 |
ln m |
150.00 |
88,221.00 |
150.00 |
88,221.00 |
135.00 |
79,398.90 |
200.00 |
117,628.00 |
| S-102 |
barrier mounted sound wall (2 440mm high)
|
176.60 |
ln m |
800.00 |
141,280.00 |
1,020.00 |
180,132.00 |
900.00 |
158,940.00 |
900.00 |
158,940.00 |
| S-103 |
impact attenuator (kinetic)
|
1   |
ea |
24,000.00 |
24,000.00 |
20,400.00 |
20,400.00 |
23,000.00 |
23,000.00 |
20,000.00 |
20,000.00 |
| S-104 |
concrete railing (barrier)(concrete only)(main span
rail) |
384.00 |
ln m |
115.00 |
44,160.00 |
109.00 |
41,856.00 |
120.00 |
46,080.00 |
100.00 |
38,400.00 |
| S-105 |
concrete railing (median)(concrete only)(main span
rail) |
192.00 |
ln m |
125.00 |
24,000.00 |
121.00 |
23,232.00 |
160.00 |
30,720.00 |
100.00 |
19,200.00 |
| S-106 |
dynamic analysis
|
7   |
ea |
750.00 |
5,250.00 |
1,600.00 |
11,200.00 |
1,500.00 |
10,500.00 |
1,000.00 |
7,000.00 |
| S-107 |
precast-prestressed high performance concrete (hpc)
girders (type bt-72) |
1,867.97 |
ln m |
775.00 |
1,447,676.75 |
770.00 |
1,438,336.90 |
700.00 |
1,307,579.00 |
785.00 |
1,466,356.45 |
| S-108 |
vibration monitoring
|
lump |
lump |
12,000.00 |
12,000.00 |
27,000.00 |
27,000.00 |
32,000.00 |
32,000.00 |
27,000.00 |
27,000.00 |
| S-109 |
installation of finger joint and strip seal joint
|
lump |
lump |
8,000.00 |
8,000.00 |
7,000.00 |
7,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
31,242,022.92 |
|
32,829,652.46 |
|
33,500,114.70 |
|
34,237,756.23 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - KEY CONSTRUCTORS, INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
1,000,000.00 |
1,000,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
250,000.00 |
250,000.00 |
|
|
|
|
|
|
| 202-02-A |
removal of bridges
|
1   |
ea |
750,000.00 |
750,000.00 |
|
|
|
|
|
|
| 202-02-B |
removal of concrete box culverts (sta. 17+953; 1-1.22m
x 1.22m x 21.61m r.c . box) |
1   |
ea |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
3,393   |
sq m |
10.00 |
33,930.00 |
|
|
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
6,478   |
sq m |
12.00 |
77,736.00 |
|
|
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
87.0 |
ln m |
30.00 |
2,610.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
8,893.3 |
sq m |
6.00 |
53,359.80 |
|
|
|
|
|
|
| 202-02-I |
removal of existing traffic signal equipment
|
lump |
lump |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| 202-02-01 |
removal of concrete slab (sta. 15+287, rt., 60 square
meters) |
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-02 |
removal of concrete building (sta. 15+371, rt.,
27 square meters) |
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-03 |
removal of 2-story brick building (sta. 15+404, lt.,
335 square meters) |
1   |
ea |
11,000.00 |
11,000.00 |
|
|
|
|
|
|
| 202-02-04 |
removal of 3" pipe fencing (sta. 15+404, lt.)
|
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-05 |
removal of underground storage tank (sta. 15+462,
approximately 4.5m rt.) |
1   |
ea |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| 202-02-06 |
removal of concrete slab (sta. 15+550, rt., 11 square
meters) |
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-07 |
removal of brick building (sta. 15+575, 433 square
meters) |
1   |
ea |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 202-02-08 |
removal of sign (sta. 15+575, pipe material)
|
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-09 |
removal of brick building (sta. 15+601, lt.,
1300 square meters) |
1   |
ea |
4,000.00 |
4,000.00 |
|
|
|
|
|
|
| 202-02-10 |
removal of concrete cinderblock building (sta. 15+601,
lt., 232 square mete rs) |
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-11 |
removal of underground storage tanks (located on
parcel 3-1, 3000 gallon/ea ch) |
5   |
ea |
5,000.00 |
25,000.00 |
|
|
|
|
|
|
| 202-02-12 |
removal of undergound storage tanks (located on parcel
3-4) |
4   |
ea |
5,000.00 |
20,000.00 |
|
|
|
|
|
|
| 202-02-13 |
removal of concrete slab (sta. 15+659, lt.,
1106 square meters) |
1   |
ea |
3,000.00 |
3,000.00 |
|
|
|
|
|
|
| 202-02-14 |
removal of metal storage building (sta. 15+705, rt.,
28 square meters) |
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-15 |
removal of metal/cinderblock building (sta. 15+730,
1300 square meters) |
1   |
ea |
9,000.00 |
9,000.00 |
|
|
|
|
|
|
| 202-02-16 |
removal of wood frame 2-story residence (sta. 15+830,
rt., 285 square meter s) |
1   |
ea |
3,000.00 |
3,000.00 |
|
|
|
|
|
|
| 202-02-17 |
removal of dop pen (sta. 15+830, rt.ta. 15+830, rt.,
6 square meters) |
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-18 |
removal of metal radio tower (sta. 17+250)
|
1   |
ea |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 202-02-19 |
removal of metal mobile home (immobilized)(sta. 17+460)
|
1   |
ea |
2,000.00 |
2,000.00 |
|
|
|
|
|
|
| 202-02-20 |
removal of concrete slab (sta. 17+460, 13 square
meters) |
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-21 |
removal of wood carport (sta. 17+945, rt.)
|
1   |
ea |
2,000.00 |
2,000.00 |
|
|
|
|
|
|
| 202-02-22 |
removal of garage (sta. 18+129, rt., 24 square meters)
|
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-23 |
removal of fence and 2 gates (sta. 18+129, rt.)
|
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-24 |
removal of building (sta. 18+300, rt., 372 square
meters) |
1   |
ea |
8,000.00 |
8,000.00 |
|
|
|
|
|
|
| 202-02-25 |
removal of underground storage tanks (sta. 18+300, rt.)
|
1   |
ea |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| 202-02-26 |
removal of concrete slab (sta. 18+300, rt., 11 square
meters) |
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-27 |
removal of canopy (sta. 18+300, rt., 78 square meters)
|
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-28 |
removal of dispensing pump (sta. 18+300, rt.)
|
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-29 |
removal of coin operated vacuums (sta. 18+344, rt.)
|
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-30 |
removal of cinderblock car wash bay (sta. 18+344, rt.)
|
1   |
ea |
3,000.00 |
3,000.00 |
|
|
|
|
|
|
| 202-02-31 |
removal of underground storage tanks (located on
parcel 10-11, 4000 gallon/ each) |
4   |
ea |
5,000.00 |
20,000.00 |
|
|
|
|
|
|
| 202-02-32 |
removal of sign frame (sta. 18+400, rt.)
|
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-33 |
removal of mobile home (sta. 1+105, rt. 75 square
meters) |
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-34 |
removal of storage building (sta. 1+163, rt.,
24 square meters) |
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-35 |
removal of metal mobile home (sta. 1+212, rt.
58 square meters) |
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-36 |
removal of storage building (sta. 1+270, rt., 6 square
meters) |
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-37 |
removal of storage building (sta. 1+350, rt.,
13 square meters) |
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-38 |
removal of storage building (sta. 1+352, rt.,
22 square meters) |
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-39 |
removal of pig pen (sta. 1+370, rt., 14 square meters)
|
1   |
ea |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-05 |
excavation, disposal and backfilling of contaminated
soil (parcel 1-2, (3)1 000 gallon ust's) |
130   |
cu m |
50.00 |
6,500.00 |
|
|
|
|
|
|
| 202-06 |
removal and disposal of contaminated fluid
|
60,000   |
l |
3.00 |
180,000.00 |
|
|
|
|
|
|
| 203-01 |
general excavation
|
62,245   |
cu m |
10.00 |
622,450.00 |
|
|
|
|
|
|
| 203-02 |
drainage excavation
|
418   |
cu m |
12.00 |
5,016.00 |
|
|
|
|
|
|
| 203-03 |
muck excavation
|
28,000   |
cu m |
12.00 |
336,000.00 |
|
|
|
|
|
|
| 203-04 |
embankment
|
165,799   |
cu m |
14.00 |
2,321,186.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
10   |
ea |
10.00 |
100.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
10   |
ea |
150.00 |
1,500.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,800   |
ln m |
5.00 |
9,000.00 |
|
|
|
|
|
|
| 302-02-B |
class ii base course (220mm thick)
|
3,240.9 |
sq m |
20.00 |
64,818.00 |
|
|
|
|
|
|
| 302-02-C |
class ii base course (250mm thick)
|
12,047.2 |
sq m |
22.00 |
265,038.40 |
|
|
|
|
|
|
| 302-02-D |
class ii base course (300mm thick)
|
36,342.0 |
sq m |
25.00 |
908,550.00 |
|
|
|
|
|
|
| 304-01 |
lime
|
354.00 |
Mg |
140.00 |
49,560.00 |
|
|
|
|
|
|
| 304-04-B |
lime treatment (type d) (220mm thick)
|
1,059   |
sq m |
2.00 |
2,118.00 |
|
|
|
|
|
|
| 304-04-D |
lime treatment (type d) (300mm thick)
|
22,601   |
sq m |
2.00 |
45,202.00 |
|
|
|
|
|
|
| 401-01 |
aggregate surface course (net section)
|
47.1 |
cu m |
100.00 |
4,710.00 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
490.0 |
cu m |
50.00 |
24,500.00 |
|
|
|
|
|
|
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
400.0 |
cu m |
70.00 |
28,000.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
21,970.0 |
Mg |
100.00 |
2,197,000.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
196.9 |
Mg |
160.00 |
31,504.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
4,559   |
sq m |
2.00 |
9,118.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 114   |
cu m |
3.00 |
- 342.00 |
|
|
|
|
|
|
| 601-01-K |
portland cement concrete pavement (250mm thick)
|
9,122.2 |
sq m |
60.00 |
547,332.00 |
|
|
|
|
|
|
| 601-02-K |
portland cement concrete pavement (250mm thick)
(crossovers & turnouts) |
1,964.2 |
sq m |
70.00 |
137,494.00 |
|
|
|
|
|
|
| 701-01-I |
cross drain pipe (600mm rcp/pcp)
|
104.5 |
ln m |
230.00 |
24,035.00 |
|
|
|
|
|
|
| 701-02-E |
cross drain pipe arch (750mm equiv. rcpa)
|
60.0 |
ln m |
350.00 |
21,000.00 |
|
|
|
|
|
|
| 701-02-H |
cross drain pipe arch (1200mm equiv. rcpa)
|
320.0 |
ln m |
500.00 |
160,000.00 |
|
|
|
|
|
|
| 701-03-F |
storm drain pipe (375mm rcp/pcp)
|
450.6 |
ln m |
150.00 |
67,590.00 |
|
|
|
|
|
|
| 701-03-G |
storm drain pipe (450mm rcp/pcp)
|
243.8 |
ln m |
160.00 |
39,008.00 |
|
|
|
|
|
|
| 701-03-I |
storm drain pipe (600mm rcp/pcp)
|
143.2 |
ln m |
200.00 |
28,640.00 |
|
|
|
|
|
|
| 701-03-K |
storm drain pipe (750mm rcp/pcp)
|
207.8 |
ln m |
250.00 |
51,950.00 |
|
|
|
|
|
|
| 701-03-N |
storm drain pipe (1050mm rcp/pcp)
|
300.4 |
ln m |
420.00 |
126,168.00 |
|
|
|
|
|
|
| 701-03-O |
storm drain pipe (1200mm rcp/pcp)
|
79.0 |
ln m |
700.00 |
55,300.00 |
|
|
|
|
|
|
| 701-03-Q |
storm drain pipe (1500mm rcp/pcp)
|
41.7 |
ln m |
800.00 |
33,360.00 |
|
|
|
|
|
|
| 701-05-G |
side drain pipe (450mm)
|
128.9 |
ln m |
150.00 |
19,335.00 |
|
|
|
|
|
|
| 702-02-F |
manholes (mh-01)
|
8   |
ea |
4,000.00 |
32,000.00 |
|
|
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
13   |
ea |
3,000.00 |
39,000.00 |
|
|
|
|
|
|
| 702-03-B |
catch basins (cb-02)
|
3   |
ea |
4,000.00 |
12,000.00 |
|
|
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
24   |
ea |
3,500.00 |
84,000.00 |
|
|
|
|
|
|
| 702-03-D |
catch basins (cb-07)
|
2   |
ea |
5,000.00 |
10,000.00 |
|
|
|
|
|
|
| 702-03-F |
catch basins (cb-08)
|
9   |
ea |
6,000.00 |
54,000.00 |
|
|
|
|
|
|
| 702-03-G |
catch basins (cb-09)
|
2   |
ea |
6,000.00 |
12,000.00 |
|
|
|
|
|
|
| 702-04-A |
adjusting manholes
|
3   |
ea |
1,000.00 |
3,000.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
68.58 |
ln m |
60.00 |
4,114.80 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
15.24 |
ln m |
155.00 |
2,362.20 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
ea |
2,500.00 |
5,000.00 |
|
|
|
|
|
|
| 705-02 |
combination mesh & barbed wire fence
|
140   |
ln m |
20.00 |
2,800.00 |
|
|
|
|
|
|
| 705-06-C |
chain link fence (1800mm height)
|
601   |
ln m |
70.00 |
42,070.00 |
|
|
|
|
|
|
| 706-02-C |
concrete drive (150mm thick)
|
870.0 |
sq m |
55.00 |
47,850.00 |
|
|
|
|
|
|
| 706-03-C |
incidental concrete paving (150mm thick)
|
22.5 |
sq m |
60.00 |
1,350.00 |
|
|
|
|
|
|
| 707-01 |
concrete curb
|
1,098.2 |
ln m |
30.00 |
32,946.00 |
|
|
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
357.7 |
ln m |
80.00 |
28,616.00 |
|
|
|
|
|
|
| 708-01 |
right-of-way monument
|
89   |
ea |
200.00 |
17,800.00 |
|
|
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
44   |
ea |
200.00 |
8,800.00 |
|
|
|
|
|
|
| 711-01-D |
riprap (25 kg, 300mm thick)
|
1,499   |
sq m |
50.00 |
74,950.00 |
|
|
|
|
|
|
| 711-04 |
geotextile fabric
|
1,499   |
sq m |
3.00 |
4,497.00 |
|
|
|
|
|
|
| 712-01-A |
concrete cast-in-place revetment (100mm thick)
|
736.0 |
sq m |
65.00 |
47,840.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
200,000.00 |
200,000.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (100mm width)
|
2,400   |
ln m |
0.65 |
1,560.00 |
|
|
|
|
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(100 mm width)
(type i removable) |
1.600 |
km |
8,200.00 |
13,120.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
19.3 |
hctr |
1,600.00 |
30,880.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
1,130   |
kg |
15.00 |
16,950.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
21,627   |
kg |
0.70 |
15,138.90 |
|
|
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
ea |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (300mm minimum thickness)
|
330   |
sq m |
75.00 |
24,750.00 |
|
|
|
|
|
|
| 725-02 |
temporary detour roads
|
524.8 |
sq m |
100.00 |
52,480.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
1,579.1 |
cu m |
70.00 |
110,537.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
lump |
4,000,000.00 |
4,000,000.00 |
|
|
|
|
|
|
| 729-01 |
sign (type a)
|
3.72 |
sq m |
300.00 |
1,116.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
30   |
ea |
100.00 |
3,000.00 |
|
|
|
|
|
|
| 729-17 |
milepost assembly (ground mounted)
|
8   |
ea |
250.00 |
2,000.00 |
|
|
|
|
|
|
| 729-19-B |
dead end road installation (type b)
|
1   |
ea |
1,500.00 |
1,500.00 |
|
|
|
|
|
|
| 729-19-C |
dead end road installation (type c)
|
4   |
ea |
600.00 |
2,400.00 |
|
|
|
|
|
|
| 729-21 |
u-channel post
|
4   |
ea |
100.00 |
400.00 |
|
|
|
|
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
1,020   |
ea |
14.00 |
14,280.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
993   |
ea |
5.50 |
5,461.50 |
|
|
|
|
|
|
| 732-01-B |
plastic pavement striping (150mm width)
|
140   |
ln m |
2.20 |
308.00 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (200mm width)
|
160   |
ln m |
3.50 |
560.00 |
|
|
|
|
|
|
| 732-01-D |
plastic pavement striping (300mm width)
|
130   |
ln m |
4.40 |
572.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line)(100mm width)
|
15.256 |
km |
1,600.00 |
24,409.60 |
|
|
|
|
|
|
| 732-02-E |
plastic pavement striping (solid line)(600mm width)
|
0.497 |
km |
10,000.00 |
4,970.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(100mm width)
|
6.891 |
km |
1,400.00 |
9,647.40 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
14   |
ea |
150.00 |
2,100.00 |
|
|
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
1   |
ea |
210.00 |
210.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
15   |
ea |
160.00 |
2,400.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
20   |
ea |
100.00 |
2,000.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
20   |
ea |
150.00 |
3,000.00 |
|
|
|
|
|
|
| 736-01 |
trenching and backfilling
|
116   |
ln m |
20.00 |
2,320.00 |
|
|
|
|
|
|
| 736-04-A |
signal support (7.62m galvanized steel strain pole)
|
1   |
ea |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 736-04-B |
signal support (7.92m galvanized steel strain pole)
|
3   |
ea |
10,000.00 |
30,000.00 |
|
|
|
|
|
|
| 736-05 |
signal heads (3-section, 300mm lens)
|
10   |
ea |
2,000.00 |
20,000.00 |
|
|
|
|
|
|
| 736-06 |
signal service
|
1   |
ea |
2,000.00 |
2,000.00 |
|
|
|
|
|
|
| 736-08 |
signal controller (type iii, pole mounted, 8-phase)
|
1   |
ea |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 736-09 |
loop detector
|
261   |
ln m |
50.00 |
13,050.00 |
|
|
|
|
|
|
| 736-10 |
underground junction box (type d)
|
6   |
ea |
600.00 |
3,600.00 |
|
|
|
|
|
|
| 736-11 |
conduit (25mm rigid)
|
116   |
ln m |
15.00 |
1,740.00 |
|
|
|
|
|
|
| 736-12-A |
conductor (2c loop lead - in/#16 awg)
|
127   |
ln m |
12.00 |
1,524.00 |
|
|
|
|
|
|
| 736-12-B |
conductor (power)
|
7   |
ln m |
12.00 |
84.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
lump |
400,000.00 |
400,000.00 |
|
|
|
|
|
|
| 742-01 |
sanitary sewer pipe (200mm)
|
148   |
ln m |
150.00 |
22,200.00 |
|
|
|
|
|
|
| 742-02 |
adjusting sanitary sewer house connections
|
6   |
ea |
500.00 |
3,000.00 |
|
|
|
|
|
|
| 742-03 |
adjusting sanitary sewer service lines
|
85   |
ln m |
100.00 |
8,500.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
lump |
150,000.00 |
150,000.00 |
|
|
|
|
|
|
| 802-02 |
structural excavation for intermediate bents
|
4,187.3 |
cu m |
50.00 |
209,365.00 |
|
|
|
|
|
|
| 802-04 |
structural excavation for piers (wet)
|
716.1 |
cu m |
100.00 |
71,610.00 |
|
|
|
|
|
|
| 804-01-B |
precast concrete piles (350mm)
|
17,607.0 |
ln m |
200.00 |
3,521,400.00 |
|
|
|
|
|
|
| 804-05 |
precast concrete test piles
|
2   |
ea |
20,000.00 |
40,000.00 |
|
|
|
|
|
|
| 804-09 |
loading test piles
|
2   |
ea |
15,000.00 |
30,000.00 |
|
|
|
|
|
|
| 804-10 |
reloading test piles
|
2   |
ea |
1,000.00 |
2,000.00 |
|
|
|
|
|
|
| 804-11 |
redriving test piles
|
2   |
ea |
1,000.00 |
2,000.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
2   |
ea |
4,000.00 |
8,000.00 |
|
|
|
|
|
|
| 804-17 |
dynamic monitoring
|
7   |
ea |
3,000.00 |
21,000.00 |
|
|
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
45.30 |
cu m |
1,200.00 |
54,360.00 |
|
|
|
|
|
|
| 805-01-D |
class a concrete (footings)
|
1,785.65 |
cu m |
400.00 |
714,260.00 |
|
|
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
2,205.57 |
cu m |
600.00 |
1,323,342.00 |
|
|
|
|
|
|
| 805-03 |
class aa concrete
|
4,804.70 |
cu m |
600.00 |
2,882,820.00 |
|
|
|
|
|
|
| 805-07 |
class s concrete
|
125.20 |
cu m |
250.00 |
31,300.00 |
|
|
|
|
|
|
| 805-08-G |
precast-prestressed concrete girders (type bt-72)
|
5,973.96 |
ln m |
800.00 |
4,779,168.00 |
|
|
|
|
|
|
| 805-11 |
strip seal joints (102mm)
|
312.00 |
ln m |
350.00 |
109,200.00 |
|
|
|
|
|
|
| 805-12-M |
reinforced concrete box culverts (1800mm x 1800mm)
|
452.80 |
ln m |
1,500.00 |
679,200.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
1,110,669   |
kg |
1.75 |
1,943,670.75 |
|
|
|
|
|
|
| 807-06 |
structural metalwork
|
lump |
lump |
50,000.00 |
50,000.00 |
|
|
|
|
|
|
| 810-01-A |
concrete railing (barrier)
|
1,564.40 |
ln m |
150.00 |
234,660.00 |
|
|
|
|
|
|
| 810-01-B |
concrete railing (median barrier)
|
1,396.34 |
ln m |
150.00 |
209,451.00 |
|
|
|
|
|
|
| 813-01 |
concrete approach slabs
|
590.00 |
sq m |
180.00 |
106,200.00 |
|
|
|
|
|
|
| S-001 |
traffic maintenance superpave asphaltic concrete
|
150.0 |
Mg |
100.00 |
15,000.00 |
|
|
|
|
|
|
| S-002 |
rumble strips(ground-in)
|
12.3 |
km |
800.00 |
9,840.00 |
|
|
|
|
|
|
| S-101 |
median barrier footing
|
588.14 |
ln m |
150.00 |
88,221.00 |
|
|
|
|
|
|
| S-102 |
barrier mounted sound wall (2 440mm high)
|
176.60 |
ln m |
1,000.00 |
176,600.00 |
|
|
|
|
|
|
| S-103 |
impact attenuator (kinetic)
|
1   |
ea |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| S-104 |
concrete railing (barrier)(concrete only)(main span
rail) |
384.00 |
ln m |
150.00 |
57,600.00 |
|
|
|
|
|
|
| S-105 |
concrete railing (median)(concrete only)(main span
rail) |
192.00 |
ln m |
150.00 |
28,800.00 |
|
|
|
|
|
|
| S-106 |
dynamic analysis
|
7   |
ea |
2,000.00 |
14,000.00 |
|
|
|
|
|
|
| S-107 |
precast-prestressed high performance concrete (hpc)
girders (type bt-72) |
1,867.97 |
ln m |
800.00 |
1,494,376.00 |
|
|
|
|
|
|
| S-108 |
vibration monitoring
|
lump |
lump |
50,000.00 |
50,000.00 |
|
|
|
|
|
|
| S-109 |
installation of finger joint and strip seal joint
|
lump |
lump |
300,000.00 |
300,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
35,861,584.35 |
|
|
|
|
|
|
|