| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
150   |
LNFT |
3.00 |
450.00 |
3.00 |
450.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
100   |
CUYD |
13.00 |
1,300.00 |
39.00 |
3,900.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
1,590.2 |
TON |
58.00 |
92,231.60 |
64.00 |
101,772.80 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
miscellaneous |
157.3 |
TON |
58.00 |
9,123.40 |
200.00 |
31,460.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
15,821   |
SQYD |
1.00 |
15,821.00 |
2.00 |
31,642.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 363   |
CUYD |
5.00 |
- 1,815.00 |
0.10 |
- 36.30 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,000.00 |
8,000.00 |
2,000.00 |
8,000.00 |
|
|
|
|
| 706-01-C |
concrete walk (6" thick)
|
99.4 |
SQYD |
120.00 |
11,928.00 |
107.00 |
10,635.80 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 713-03-D |
temporary pavement markings (12" width)
|
384   |
LNFT |
0.50 |
192.00 |
0.64 |
245.76 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
120   |
LNFT |
1.00 |
120.00 |
1.25 |
150.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
1.934 |
MILE |
160.00 |
309.44 |
162.00 |
313.30 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.800 |
MILE |
20.00 |
16.00 |
850.00 |
680.00 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
6.936 |
MILE |
40.00 |
277.44 |
1.00 |
6.93 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
100   |
SQYD |
70.00 |
7,000.00 |
130.00 |
13,000.00 |
|
|
|
|
| 724-03 |
pavement joint repair
|
76.6 |
TON |
100.00 |
7,660.00 |
265.00 |
20,299.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
12,000.00 |
12,000.00 |
28,000.00 |
28,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
70.00 |
280.00 |
70.00 |
280.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
129   |
EACH |
6.00 |
774.00 |
6.00 |
774.00 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
192   |
LNFT |
2.00 |
384.00 |
1.61 |
309.12 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
60   |
LNFT |
6.00 |
360.00 |
3.21 |
192.60 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.468 |
MILE |
2,200.00 |
7,629.60 |
2,000.00 |
6,936.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.400 |
MILE |
700.00 |
280.00 |
850.00 |
340.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,000.00 |
3,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
7,000.00 |
7,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| S-001 |
u-channel post installation
|
44   |
ea |
70.00 |
3,080.00 |
79.00 |
3,476.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
193,401.48 |
|
282,827.01 |
|
|
|
|
|