| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - COASTAL BRIDGE CO., L.L.C. |
- 3 - GUINN BROTHERS, LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
28,500.00 |
28,500.00 |
50,000.00 |
50,000.00 |
45,000.00 |
45,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
4,500.00 |
4,500.00 |
500.00 |
500.00 |
8,000.00 |
8,000.00 |
|
|
| 202-02-A-01 |
removal of bridges (sta. 10+149.394) 7.3m x 93.3m
precast concrete deck bridge |
1   |
ea |
18,800.00 |
18,800.00 |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
|
|
| 202-02-A-02 |
removal of bridges (sta. 10+890.730) 8.5m x 12.2m
bridge |
1   |
ea |
7,400.00 |
7,400.00 |
5,000.00 |
5,000.00 |
6,500.00 |
6,500.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
4,222.0 |
sq m |
7.80 |
32,931.60 |
4.25 |
17,943.50 |
5.00 |
21,110.00 |
|
|
| 202-02-H |
removal of guard rail
|
169   |
ln m |
7.90 |
1,335.10 |
20.00 |
3,380.00 |
10.00 |
1,690.00 |
|
|
| 203-01 |
general excavation
|
1,540   |
cu m |
7.90 |
12,166.00 |
2.00 |
3,080.00 |
9.00 |
13,860.00 |
|
|
| 203-02 |
drainage excavation
|
1,339   |
cu m |
12.10 |
16,201.90 |
5.00 |
6,695.00 |
9.00 |
12,051.00 |
|
|
| 203-04 |
embankment
|
9,306   |
cu m |
11.90 |
110,741.40 |
14.67 |
136,519.02 |
18.00 |
167,508.00 |
|
|
| 302-01 |
class ii base course
|
1,745.8 |
cu m |
82.20 |
143,504.76 |
100.00 |
174,580.00 |
85.00 |
148,393.00 |
|
|
| 304-01 |
lime
|
24.88 |
Mg |
156.00 |
3,881.28 |
150.00 |
3,732.00 |
175.00 |
4,354.00 |
|
|
| 304-04 |
lime treatment (type d) (300 mm thick)
|
1,646   |
sq m |
1.10 |
1,810.60 |
1.00 |
1,646.00 |
12.00 |
19,752.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
27   |
cu m |
76.30 |
2,060.10 |
70.00 |
1,890.00 |
85.00 |
2,295.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
50.0 |
cu m |
46.60 |
2,330.00 |
55.00 |
2,750.00 |
50.00 |
2,500.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
1,210.1 |
Mg |
106.30 |
128,633.63 |
93.50 |
113,144.35 |
115.00 |
139,161.50 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
6.5 |
Mg |
291.00 |
1,891.50 |
300.00 |
1,950.00 |
500.00 |
3,250.00 |
|
|
| 701-05-I |
side drain pipe (600 mm)
|
31.8 |
ln m |
128.00 |
4,070.40 |
160.00 |
5,088.00 |
300.00 |
9,540.00 |
|
|
| 701-05-K |
side drain pipe (750 mm)
|
10.3 |
ln m |
165.00 |
1,699.50 |
200.00 |
2,060.00 |
375.00 |
3,862.50 |
|
|
| 701-10-I-1 |
reinforced concrete pipe (extension)(610 mm)
|
0.8 |
ln m |
1,100.00 |
880.00 |
400.00 |
320.00 |
3,000.00 |
2,400.00 |
|
|
| 702-07-A |
cross drain safety end (type 1)
|
2   |
ea |
1,770.00 |
3,540.00 |
1,300.00 |
2,600.00 |
2,500.00 |
5,000.00 |
|
|
| 702-08-A |
side drain safety end (type 1)
|
2   |
ea |
1,770.00 |
3,540.00 |
1,300.00 |
2,600.00 |
2,500.00 |
5,000.00 |
|
|
| 702-08-B |
side drain safety end (type 2)
|
1   |
ea |
3,000.00 |
3,000.00 |
2,300.00 |
2,300.00 |
3,500.00 |
3,500.00 |
|
|
| 704-03 |
blocked out guard rail
|
91.44 |
ln m |
56.15 |
5,134.35 |
55.00 |
5,029.20 |
65.00 |
5,943.60 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
30.48 |
ln m |
194.40 |
5,925.31 |
140.00 |
4,267.20 |
170.00 |
5,181.60 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
ea |
2,160.00 |
8,640.00 |
1,750.00 |
7,000.00 |
2,000.00 |
8,000.00 |
|
|
| 705-01 |
barbed wire fence
|
797   |
ln m |
5.95 |
4,742.15 |
6.50 |
5,180.50 |
17.50 |
13,947.50 |
|
|
| 705-02 |
combination mesh & barbed wire fence
|
164.0 |
ln m |
6.75 |
1,107.00 |
7.25 |
1,189.00 |
25.00 |
4,100.00 |
|
|
| 705-04 |
single swinging driveway gates
|
3   |
ea |
435.00 |
1,305.00 |
450.00 |
1,350.00 |
1,000.00 |
3,000.00 |
|
|
| 708-01 |
right-of-way monument
|
20   |
ea |
185.00 |
3,700.00 |
200.00 |
4,000.00 |
385.00 |
7,700.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
20   |
ea |
170.00 |
3,400.00 |
200.00 |
4,000.00 |
385.00 |
7,700.00 |
|
|
| 712-04 |
flexible revetment
|
469   |
sq m |
64.20 |
30,109.80 |
55.00 |
25,795.00 |
65.00 |
30,485.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
16,500.00 |
16,500.00 |
25,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
|
|
| 717-01 |
seeding
|
57   |
kg |
26.25 |
1,496.25 |
25.00 |
1,425.00 |
25.00 |
1,425.00 |
|
|
| 718-01 |
fertilizer
|
1,891   |
kg |
0.80 |
1,512.80 |
0.75 |
1,418.25 |
1.00 |
1,891.00 |
|
|
| 726-01 |
bedding material
|
225.1 |
cu m |
98.00 |
22,059.80 |
20.00 |
4,502.00 |
80.00 |
18,008.00 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
129,000.00 |
129,000.00 |
150,000.00 |
150,000.00 |
250,000.00 |
250,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
ea |
85.00 |
340.00 |
70.00 |
280.00 |
100.00 |
400.00 |
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
176   |
ea |
13.00 |
2,288.00 |
15.00 |
2,640.00 |
16.00 |
2,816.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
51   |
ea |
6.50 |
331.50 |
8.00 |
408.00 |
10.00 |
510.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
1.285 |
km |
1,250.00 |
1,606.25 |
2,000.00 |
2,570.00 |
2,500.00 |
3,212.50 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
0.560 |
km |
837.00 |
468.72 |
1,500.00 |
840.00 |
1,500.00 |
840.00 |
|
|
| 735-01 |
mailboxes
|
2   |
ea |
11.00 |
22.00 |
2.00 |
4.00 |
100.00 |
200.00 |
|
|
| 735-02 |
mailbox supports (single)
|
2   |
ea |
190.00 |
380.00 |
175.00 |
350.00 |
100.00 |
200.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
32,000.00 |
32,000.00 |
35,000.00 |
35,000.00 |
20,000.00 |
20,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
lump |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
30,000.00 |
30,000.00 |
|
|
| 804-01-D |
precast concrete piles (450 mm)
|
2,100.0 |
ln m |
164.65 |
345,765.00 |
185.00 |
388,500.00 |
202.00 |
424,200.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
ea |
3,000.00 |
3,000.00 |
100.00 |
100.00 |
1.00 |
1.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
15.74 |
cu m |
1,745.00 |
27,466.30 |
850.00 |
13,379.00 |
2,600.00 |
40,924.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
115.10 |
cu m |
740.00 |
85,174.00 |
800.00 |
92,080.00 |
750.00 |
86,325.00 |
|
|
| 805-03 |
class aa concrete
|
534.47 |
cu m |
455.00 |
243,183.85 |
550.00 |
293,958.50 |
685.00 |
366,111.95 |
|
|
| 805-12-H-01 |
reinforced concrete box culverts (2134 mm x 1219 mm)
|
128.00 |
ln m |
1,150.00 |
147,200.00 |
1,660.00 |
212,480.00 |
2,000.00 |
256,000.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
65,107   |
kg |
1.63 |
106,124.41 |
1.65 |
107,426.55 |
1.85 |
120,447.95 |
|
|
| 810-01 |
concrete railing
|
228.00 |
ln m |
127.00 |
28,956.00 |
150.00 |
34,200.00 |
180.00 |
41,040.00 |
|
|
| 813-01 |
concrete approach slabs
|
295.20 |
sq m |
178.00 |
52,545.60 |
170.00 |
50,184.00 |
195.00 |
57,564.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,849,901.86 |
|
2,037,334.07 |
|
2,487,901.10 |
|
|
|