Letting of 10/12/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 275-02-0008
Parish: WASHINGTON
Routes: LA 438, LA 438-S
Description: JUNCTION ROUTE LA 430 - MISSISSIPPI STATE LINE
Type Const: grading, drainage structures, cold planing asphaltic concrete,cement treated base
course, superpave asphaltic concrete pavement, and related work
 
RankLicenseBidderAmount
122040 COVINGTON PAVING CO. $699,288.84
206276 BARRIERE CONSTRUCTION CO., LLC. $795,938.15
312487 DIAMOND B CONSTRUCTION CO., L.L.C. $863,519.90
 
Item Number Item Description Quantity Unit of Measure - 1 -
COVINGTON PAVING CO.
- 2 -
BARRIERE CONSTRUCTION CO., LLC.
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 2,122      CUYD 10.00 21,220.00 8.00 16,976.00 19.00 40,318.00    
203-08-A borrow (vehicular meas.)(selected soils) 4,243      CUYD 10.00 42,430.00 8.00 33,944.00 14.00 59,402.00    
204-02 temporary hay or straw bales 28      EACH 7.00 196.00 7.00 196.00 6.00 168.00    
204-06 temporary silt fencing 5,500      LNFT 1.60 8,800.00 1.40 7,700.00 1.50 8,250.00    
303-02 removal of existing patches 750      SQYD FREE FREE 1.00 750.00 7.00 5,250.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
25      CUYD 50.00 1,250.00 60.00 1,500.00 43.00 1,075.00    
502-01 superpave asphaltic concrete 6,765.5    TON 47.82 323,526.21 47.00 317,978.50 50.00 338,275.00    
502-01-A superpave asphaltic concrete, drives, turnouts, and
miscellaneous
421.1    TON 65.00 27,371.50 47.00 19,791.70 100.00 42,110.00    
509-01 cold planing asphaltic pavement 18,083      SQYD 1.20 21,699.60 1.50 27,124.50 1.50 27,124.50    
509-02 contractor retained reclaimed asphaltic pavement - 502      CUYD 3.00 - 1,506.00 5.00 - 2,510.00 0.10 - 50.20    
701-01-I/I cross drain pipe (24" rcp/pcp or 24" cmp) 48      LNFT 64.00 3,072.00 106.00 5,088.00 62.00 2,976.00    
701-01-I/K cross drain pipe (24" rcp/pcp or 30" cmp) 160      LNFT 68.00 10,880.00 110.00 17,600.00 66.00 10,560.00    
701-01-K/M cross drain pipe (30" rcp/pcp or 36" cmp) 56      LNFT 83.00 4,648.00 130.00 7,280.00 80.00 4,480.00    
701-02-D/D cross drain pipe arch (24" equiv. rcpa or 24" equiv.
cmpa)
48      LNFT 66.00 3,168.00 108.00 5,184.00 64.00 3,072.00    
701-02-I/J cross drain pipe arch (54" equiv. rcpa or 60" equiv.
cmpa)
112      LNFT 165.00 18,480.00 210.00 23,520.00 160.00 17,920.00    
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00 12,000.00 12,000.00 10,000.00 10,000.00    
713-03-E temporary pavement markings (24" width) 60      LNFT 0.66 39.60 1.30 78.00 0.64 38.40    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
6.160  MILE 250.00 1,540.00 150.00 924.00 150.00 924.00    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
1.980  MILE 275.00 544.50 20.00 39.60 267.00 528.66    
713-05-A temporary pavement markings (solid line)(4" width) 22.030  MILE 550.00 12,116.50 40.00 881.20 10.00 220.30    
717-01 seeding 79      LB 8.00 632.00 12.00 948.00 11.00 869.00    
718-01 fertilizer 2,630      LB 0.52 1,367.60 0.40 1,052.00 0.31 815.30    
721-01 asphalt mulch 637      GAL 3.15 2,006.55 2.60 1,656.20 2.67 1,700.79    
722-01 project site laboratory 1      EACH 2,000.00 2,000.00 500.00 500.00 10,000.00 10,000.00    
726-01 bedding material 192.0    CUYD 44.00 8,448.00 50.00 9,600.00 43.00 8,256.00    
727-01 mobilization lump      LUMP 5,000.00 5,000.00 40,000.00 40,000.00 40,000.00 40,000.00    
729-16-C object marker assembly (type 3) 20      EACH 70.00 1,400.00 75.00 1,500.00 75.00 1,500.00    
731-02 reflectorized raised pavement markers 286      EACH 5.00 1,430.00 5.50 1,573.00 5.00 1,430.00    
732-01-E plastic pavement striping (24" width) 30      LNFT 4.00 120.00 5.00 150.00 3.20 96.00    
732-02-A plastic pavement striping (solid line) (4" width) 7.810  MILE 2,000.00 15,620.00 2,400.00 18,744.00 2,000.00 15,620.00    
732-03-A plastic pavement striping (broken line)(4" width) 0.660  MILE 800.00 528.00 820.00 541.20 750.00 495.00    
735-01 mailboxes 28      EACH 5.00 140.00 2.00 56.00 15.00 420.00    
735-02 mailbox supports (single) 28      EACH 135.00 3,780.00 140.00 3,920.00 150.00 4,200.00    
740-01 construction layout lump      LUMP 4,000.00 4,000.00 12,000.00 12,000.00 14,000.00 14,000.00    
744-01 traffic control management lump      LUMP 4,000.00 4,000.00 18,000.00 18,000.00 1,000.00 1,000.00    
S-001 cement treated base course (12 inch depth) 34,489      SQYD 4.02 138,645.78 5.25 181,067.25 5.35 184,516.15    
S-002 u-channel post installation 53      each 65.00 3,445.00 70.00 3,710.00 70.00 3,710.00    
S-003 cleaning existing ditches 750      LNFT 3.00 2,250.00 6.50 4,875.00 3.00 2,250.00    
                       
 CONTRACTOR TOTAL       699,288.84   795,938.15   863,519.90    