| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COVINGTON PAVING CO. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
2,122   |
CUYD |
10.00 |
21,220.00 |
8.00 |
16,976.00 |
19.00 |
40,318.00 |
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
4,243   |
CUYD |
10.00 |
42,430.00 |
8.00 |
33,944.00 |
14.00 |
59,402.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
28   |
EACH |
7.00 |
196.00 |
7.00 |
196.00 |
6.00 |
168.00 |
|
|
| 204-06 |
temporary silt fencing
|
5,500   |
LNFT |
1.60 |
8,800.00 |
1.40 |
7,700.00 |
1.50 |
8,250.00 |
|
|
| 303-02 |
removal of existing patches
|
750   |
SQYD |
FREE |
FREE |
1.00 |
750.00 |
7.00 |
5,250.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
25   |
CUYD |
50.00 |
1,250.00 |
60.00 |
1,500.00 |
43.00 |
1,075.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
6,765.5 |
TON |
47.82 |
323,526.21 |
47.00 |
317,978.50 |
50.00 |
338,275.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
miscellaneous |
421.1 |
TON |
65.00 |
27,371.50 |
47.00 |
19,791.70 |
100.00 |
42,110.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
18,083   |
SQYD |
1.20 |
21,699.60 |
1.50 |
27,124.50 |
1.50 |
27,124.50 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 502   |
CUYD |
3.00 |
- 1,506.00 |
5.00 |
- 2,510.00 |
0.10 |
- 50.20 |
|
|
| 701-01-I/I |
cross drain pipe (24" rcp/pcp or 24" cmp)
|
48   |
LNFT |
64.00 |
3,072.00 |
106.00 |
5,088.00 |
62.00 |
2,976.00 |
|
|
| 701-01-I/K |
cross drain pipe (24" rcp/pcp or 30" cmp)
|
160   |
LNFT |
68.00 |
10,880.00 |
110.00 |
17,600.00 |
66.00 |
10,560.00 |
|
|
| 701-01-K/M |
cross drain pipe (30" rcp/pcp or 36" cmp)
|
56   |
LNFT |
83.00 |
4,648.00 |
130.00 |
7,280.00 |
80.00 |
4,480.00 |
|
|
| 701-02-D/D |
cross drain pipe arch (24" equiv. rcpa or 24" equiv.
cmpa) |
48   |
LNFT |
66.00 |
3,168.00 |
108.00 |
5,184.00 |
64.00 |
3,072.00 |
|
|
| 701-02-I/J |
cross drain pipe arch (54" equiv. rcpa or 60" equiv.
cmpa) |
112   |
LNFT |
165.00 |
18,480.00 |
210.00 |
23,520.00 |
160.00 |
17,920.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
12,000.00 |
12,000.00 |
10,000.00 |
10,000.00 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
60   |
LNFT |
0.66 |
39.60 |
1.30 |
78.00 |
0.64 |
38.40 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
6.160 |
MILE |
250.00 |
1,540.00 |
150.00 |
924.00 |
150.00 |
924.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.980 |
MILE |
275.00 |
544.50 |
20.00 |
39.60 |
267.00 |
528.66 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
22.030 |
MILE |
550.00 |
12,116.50 |
40.00 |
881.20 |
10.00 |
220.30 |
|
|
| 717-01 |
seeding
|
79   |
LB |
8.00 |
632.00 |
12.00 |
948.00 |
11.00 |
869.00 |
|
|
| 718-01 |
fertilizer
|
2,630   |
LB |
0.52 |
1,367.60 |
0.40 |
1,052.00 |
0.31 |
815.30 |
|
|
| 721-01 |
asphalt mulch
|
637   |
GAL |
3.15 |
2,006.55 |
2.60 |
1,656.20 |
2.67 |
1,700.79 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
2,000.00 |
2,000.00 |
500.00 |
500.00 |
10,000.00 |
10,000.00 |
|
|
| 726-01 |
bedding material
|
192.0 |
CUYD |
44.00 |
8,448.00 |
50.00 |
9,600.00 |
43.00 |
8,256.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
5,000.00 |
5,000.00 |
40,000.00 |
40,000.00 |
40,000.00 |
40,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
20   |
EACH |
70.00 |
1,400.00 |
75.00 |
1,500.00 |
75.00 |
1,500.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
286   |
EACH |
5.00 |
1,430.00 |
5.50 |
1,573.00 |
5.00 |
1,430.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
30   |
LNFT |
4.00 |
120.00 |
5.00 |
150.00 |
3.20 |
96.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.810 |
MILE |
2,000.00 |
15,620.00 |
2,400.00 |
18,744.00 |
2,000.00 |
15,620.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.660 |
MILE |
800.00 |
528.00 |
820.00 |
541.20 |
750.00 |
495.00 |
|
|
| 735-01 |
mailboxes
|
28   |
EACH |
5.00 |
140.00 |
2.00 |
56.00 |
15.00 |
420.00 |
|
|
| 735-02 |
mailbox supports (single)
|
28   |
EACH |
135.00 |
3,780.00 |
140.00 |
3,920.00 |
150.00 |
4,200.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
4,000.00 |
4,000.00 |
12,000.00 |
12,000.00 |
14,000.00 |
14,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
4,000.00 |
4,000.00 |
18,000.00 |
18,000.00 |
1,000.00 |
1,000.00 |
|
|
| S-001 |
cement treated base course (12 inch depth)
|
34,489   |
SQYD |
4.02 |
138,645.78 |
5.25 |
181,067.25 |
5.35 |
184,516.15 |
|
|
| S-002 |
u-channel post installation
|
53   |
each |
65.00 |
3,445.00 |
70.00 |
3,710.00 |
70.00 |
3,710.00 |
|
|
| S-003 |
cleaning existing ditches
|
750   |
LNFT |
3.00 |
2,250.00 |
6.50 |
4,875.00 |
3.00 |
2,250.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
699,288.84 |
|
795,938.15 |
|
863,519.90 |
|
|
|