| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
- 3 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-B |
removal of concrete box culverts (2-4'x3' rc box)
|
1   |
EACH |
2,600.00 |
2,600.00 |
4,000.00 |
4,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-H |
removal of guard rail
|
2,706   |
LNFT |
6.00 |
16,236.00 |
6.30 |
17,047.80 |
3.00 |
8,118.00 |
|
|
| 202-02-I |
removal of headwalls
|
28   |
EACH |
500.00 |
14,000.00 |
800.00 |
22,400.00 |
350.00 |
9,800.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
5,211   |
CUYD |
11.00 |
57,321.00 |
8.40 |
43,772.40 |
10.00 |
52,110.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
62   |
EACH |
10.00 |
620.00 |
6.00 |
372.00 |
10.00 |
620.00 |
|
|
| 204-06 |
temporary silt fencing
|
620   |
LNFT |
3.00 |
1,860.00 |
1.50 |
930.00 |
3.00 |
1,860.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
3,525   |
CUYD |
35.00 |
123,375.00 |
3.28 |
11,562.00 |
30.00 |
105,750.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
12,472.8 |
TON |
48.00 |
598,694.40 |
47.00 |
586,221.60 |
55.00 |
686,004.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,004.8 |
TON |
100.00 |
100,480.00 |
47.00 |
47,225.60 |
55.00 |
55,264.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
8,834   |
SQYD |
2.50 |
22,085.00 |
3.80 |
33,569.20 |
4.00 |
35,336.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 245   |
CUYD |
0.10 |
- 24.50 |
5.00 |
- 1,225.00 |
0.10 |
- 24.50 |
|
|
| 701-02-H |
cross drain pipe arch (48" equiv. rcpa)
|
96   |
LNFT |
180.00 |
17,280.00 |
230.00 |
22,080.00 |
200.00 |
19,200.00 |
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
8   |
LNFT |
134.00 |
1,072.00 |
92.00 |
736.00 |
150.00 |
1,200.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
58   |
LNFT |
140.00 |
8,120.00 |
108.00 |
6,264.00 |
200.00 |
11,600.00 |
|
|
| 701-15 |
concrete collar
|
14   |
EACH |
600.00 |
8,400.00 |
900.00 |
12,600.00 |
400.00 |
5,600.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
775.0 |
LNFT |
36.00 |
27,900.00 |
36.00 |
27,900.00 |
32.00 |
24,800.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
1,506.0 |
LNFT |
50.00 |
75,300.00 |
50.00 |
75,300.00 |
46.00 |
69,276.00 |
|
|
| 704-03 |
blocked out guard rail
|
600.0 |
LNFT |
17.00 |
10,200.00 |
17.00 |
10,200.00 |
16.00 |
9,600.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
28   |
EACH |
2,000.00 |
56,000.00 |
2,000.00 |
56,000.00 |
1,825.00 |
51,100.00 |
|
|
| 711-03-C |
riprap (30 lb)
|
50.1 |
TON |
57.00 |
2,855.70 |
85.00 |
4,258.50 |
75.00 |
3,757.50 |
|
|
| 711-03-D |
riprap (55 lb)
|
100.0 |
TON |
57.00 |
5,700.00 |
85.00 |
8,500.00 |
90.00 |
9,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
8,000.00 |
8,000.00 |
40,000.00 |
40,000.00 |
150,000.00 |
150,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
9.326 |
MILE |
140.00 |
1,305.64 |
150.00 |
1,398.90 |
500.00 |
4,663.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
9.230 |
MILE |
260.00 |
2,399.80 |
20.00 |
184.60 |
100.00 |
923.00 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
47.681 |
MILE |
518.00 |
24,698.75 |
30.00 |
1,430.43 |
100.00 |
4,768.10 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
60   |
SQYD |
5.00 |
300.00 |
6.00 |
360.00 |
4.00 |
240.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
100   |
SQYD |
150.00 |
15,000.00 |
65.00 |
6,500.00 |
105.00 |
10,500.00 |
|
|
| 726-01 |
bedding material
|
67.0 |
CUYD |
42.00 |
2,814.00 |
55.00 |
3,685.00 |
50.00 |
3,350.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
50,000.00 |
50,000.00 |
170,000.00 |
170,000.00 |
150,000.00 |
150,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
88   |
EACH |
70.00 |
6,160.00 |
70.00 |
6,160.00 |
70.00 |
6,160.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
957   |
EACH |
5.00 |
4,785.00 |
5.50 |
5,263.50 |
7.00 |
6,699.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
23.840 |
MILE |
1,900.00 |
45,296.00 |
2,200.00 |
52,448.00 |
2,600.00 |
61,984.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.250 |
MILE |
725.00 |
3,081.25 |
750.00 |
3,187.50 |
900.00 |
3,825.00 |
|
|
| 735-01 |
mailboxes
|
69   |
EACH |
15.00 |
1,035.00 |
2.00 |
138.00 |
1.00 |
69.00 |
|
|
| 735-02 |
mailbox supports (single)
|
69   |
EACH |
150.00 |
10,350.00 |
130.00 |
8,970.00 |
150.00 |
10,350.00 |
|
|
| 739-01 |
hydro-seeding
|
8.70 |
ACRE |
900.00 |
7,830.00 |
950.00 |
8,265.00 |
1,000.00 |
8,700.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
8,000.00 |
8,000.00 |
20,000.00 |
20,000.00 |
75,000.00 |
75,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
1,000.00 |
1,000.00 |
27,000.00 |
27,000.00 |
100,000.00 |
100,000.00 |
|
|
| 805-01-A |
class a concrete (pipe headwalls)
|
69.18 |
CUYD |
825.00 |
57,073.50 |
1,100.00 |
76,098.00 |
800.00 |
55,344.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
107.75 |
CUYD |
780.00 |
84,045.00 |
1,100.00 |
118,525.00 |
750.00 |
80,812.50 |
|
|
| 805-12-A |
reinforced concrete box culverts (4'x 3')
|
32.0 |
LNFT |
518.00 |
16,576.00 |
650.00 |
20,800.00 |
500.00 |
16,000.00 |
|
|
| 805-12-B |
reinforced concrete box culverts (5'x 3')
|
24.0 |
LNFT |
625.00 |
15,000.00 |
670.00 |
16,080.00 |
600.00 |
14,400.00 |
|
|
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
144.0 |
LNFT |
390.00 |
56,160.00 |
550.00 |
79,200.00 |
500.00 |
72,000.00 |
|
|
| 805-12-I |
reinforced concrete box culverts (5'x 5')
|
30.0 |
LNFT |
673.00 |
20,190.00 |
680.00 |
20,400.00 |
600.00 |
18,000.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
12,386   |
LB |
1.00 |
12,386.00 |
1.70 |
21,056.20 |
1.00 |
12,386.00 |
|
|
| S-001 |
u-channel post installation
|
40   |
EACH |
68.00 |
2,720.00 |
65.00 |
2,600.00 |
55.00 |
2,200.00 |
|
|
| S-002 |
cleaning existing ditches
|
1,000   |
LNFT |
3.00 |
3,000.00 |
6.50 |
6,500.00 |
5.00 |
5,000.00 |
|
|
| S-003 |
relocation of ditches
|
300   |
LNFT |
5.00 |
1,500.00 |
6.50 |
1,950.00 |
10.00 |
3,000.00 |
|
|
| S-004 |
surface preparation
|
lump |
LUMP |
30,000.00 |
30,000.00 |
31,000.00 |
31,000.00 |
71,000.00 |
71,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,640,780.54 |
|
1,738,914.23 |
|
2,112,344.60 |
|
|
|