DBE GOAL FED
Lead Project: 071-04-0011
Parish: MOREHOUSE
Routes: LA 133
Description: NORTH JUNCTION OF ROUTE LA 134 - 4.741 MILES NORTH
Type Const: grading,drainage structures,cold planing asphaltic pavement, cement treated base
course, superpave asphaltic concrete pavement, portland cement concrete drives, and related work.
 
RankLicenseBidderAmount
105789 D & J CONSTRUCTION CO., INC. $1,917,048.67
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,979,111.35
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 20,000.00 20,000.00 25,000.00 25,000.00        
202-02-D removal of concrete walks & drives 322      SQYD 10.00 3,220.00 15.00 4,830.00        
202-02-H removal of guard rail 273      LNFT 10.00 2,730.00 5.00 1,365.00        
203-08 borrow (vehicular measurement) 350      CUYD 50.00 17,500.00 28.00 9,800.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
205      CUYD 16.00 3,280.00 36.00 7,380.00        
402-01 traffic maintenance aggregate (vehicular measurement) 600.0    CUYD 5.00 3,000.00 33.00 19,800.00        
502-01 superpave asphaltic concrete 14,983.0    TON 59.75 895,234.25 66.00 988,878.00        
502-01-A superpave asphaltic concrete, drives, turnouts, and
miscellaneous
278.1    TON 59.75 16,616.47 125.00 34,762.50        
509-01 cold planing asphaltic pavement 61,412      SQYD 2.00 122,824.00 2.00 122,824.00        
509-02 contractor retained reclaimed asphaltic pavement - 2,984      CUYD 0.01 - 29.84 0.10 - 298.40        
701-10-I reinforced concrete pipe (extension)(24") 12      LNFT 100.00 1,200.00 142.00 1,704.00        
701-15 concrete collar 2      EACH 500.00 1,000.00 1,500.00 3,000.00        
704-03 blocked out guard rail 962.6    LNFT 15.00 14,439.00 22.00 21,177.20        
704-07-A guard rail bridge attachments (single thrie beam) 96.0    LNFT 38.00 3,648.00 54.00 5,184.00        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 44.00 4,400.00 62.00 6,200.00        
704-11-A guard rail end treatment (flared) 4      EACH 1,800.00 7,200.00 2,600.00 10,400.00        
706-02-C concrete drive (6" thick) 199.2    SQYD 42.00 8,366.40 72.00 14,342.40        
713-01 temporary signs & barricades lump      LUMP 75,000.00 75,000.00 16,000.00 16,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
9.482  MILE 175.00 1,659.35 177.00 1,678.31        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
9.282  MILE 1.00 9.28 350.00 3,248.70        
713-05-A temporary pavement markings (solid line)(4" width) 21.462  MILE 1.00 21.46 712.00 15,280.94        
716-01-A mulch (vegetative) 4.60   ACRE 650.00 2,990.00 925.00 4,255.00        
717-01 seeding 207      LB 7.00 1,449.00 10.00 2,070.00        
718-01 fertilizer 4,600      LB 0.50 2,300.00 0.71 3,266.00        
722-01 project site laboratory 1      EACH 10,000.00 10,000.00 15,000.00 15,000.00        
726-01 bedding material 5.6    CUYD 72.00 403.20 65.00 364.00        
727-01 mobilization lump      LUMP 125,000.00 125,000.00 60,000.00 60,000.00        
729-16-C object marker assembly (type 3) 4      EACH 70.00 280.00 100.00 400.00        
731-02 reflectorized raised pavement markers 651      EACH 7.50 4,882.50 7.00 4,557.00        
732-02-A plastic pavement striping (solid line) (4" width) 10.731  MILE 2,200.00 23,608.20 2,700.00 28,973.70        
732-03-A plastic pavement striping (broken line)(4" width) 4.641  MILE 1,200.00 5,569.20 1,000.00 4,641.00        
735-01 mailboxes 10      EACH 1.00 10.00 15.00 150.00        
735-02 mailbox supports (single) 8      EACH 125.00 1,000.00 150.00 1,200.00        
735-03 mailbox supports (double) 1      EACH 175.00 175.00 500.00 500.00        
740-01 construction layout lump      LUMP 18,000.00 18,000.00 12,000.00 12,000.00        
744-01 traffic control management lump      LUMP 25,000.00 25,000.00 1,000.00 1,000.00        
S-001 cement treated base course (12 inch depth) 80,912      SQYD 6.10 493,563.20 6.50 525,928.00        
S-002 cleaning existing ditches 150      LNFT 10.00 1,500.00 15.00 2,250.00        
                       
 CONTRACTOR TOTAL       1,917,048.67   1,979,111.35        