| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JENSEN CONSTRUCTION CO. |
- 2 - AUSTIN BRIDGE & ROAD, LP |
- 3 - JAMES CONSTRUCTION GROUP LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
500,000.00 |
500,000.00 |
79,000.00 |
79,000.00 |
1,200,000.00 |
1,200,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
50,000.00 |
50,000.00 |
52,000.00 |
52,000.00 |
25,000.00 |
25,000.00 |
|
|
| 202-02-A |
removal of bridges (sta. 132+57, 20'x 925',swing span
bridge) |
1   |
EACH |
500,000.00 |
500,000.00 |
1,300,000.00 |
1,300,000.00 |
750,000.00 |
750,000.00 |
|
|
| 202-02-C-01 |
removal of portland cement concrete pavement w/ hmac
overlay |
6,370   |
SQYD |
9.00 |
57,330.00 |
9.50 |
60,515.00 |
3.00 |
19,110.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
2,960   |
SQYD |
7.00 |
20,720.00 |
7.30 |
21,608.00 |
3.00 |
8,880.00 |
|
|
| 202-02-E |
removal of concrete curbs
|
747.8 |
LNFT |
1.00 |
747.80 |
1.10 |
822.58 |
10.00 |
7,478.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
12,541.1 |
SQYD |
7.00 |
87,787.70 |
7.20 |
90,295.92 |
2.00 |
25,082.20 |
|
|
| 202-02-01 |
removal of structure(rt. of sta. 102+20;wood residence)
|
1   |
EACH |
6,000.00 |
6,000.00 |
4,200.00 |
4,200.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-02 |
removal of structure(lt. of sta. 146+60;concrete slab)
|
1   |
EACH |
1,000.00 |
1,000.00 |
3,100.00 |
3,100.00 |
4,000.00 |
4,000.00 |
|
|
| 202-02-03 |
removal of structure(sta. 147+85 lt;brick church
building) |
1   |
EACH |
20,000.00 |
20,000.00 |
7,300.00 |
7,300.00 |
8,000.00 |
8,000.00 |
|
|
| 202-02-04 |
removal of concrete slab; sta 145+25 rt
|
1   |
EACH |
4,000.00 |
4,000.00 |
4,200.00 |
4,200.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-05 |
removal of structure(sta. 151+11;30'x30' concrete slab)
|
1   |
EACH |
4,000.00 |
4,000.00 |
3,100.00 |
3,100.00 |
4,000.00 |
4,000.00 |
|
|
| 202-02-06 |
removal of structure(rt. of sta. 151+38;110'x 50'
brick restaurant) |
1   |
EACH |
20,000.00 |
20,000.00 |
6,300.00 |
6,300.00 |
7,000.00 |
7,000.00 |
|
|
| 202-02-07 |
removal of structure(rt. of sta. 152+87;23'x 30'
building) |
1   |
EACH |
5,000.00 |
5,000.00 |
4,200.00 |
4,200.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-08 |
removal of metal stprage bldg. sta 156+06 rt
|
1   |
EACH |
500.00 |
500.00 |
3,100.00 |
3,100.00 |
4,000.00 |
4,000.00 |
|
|
| 202-02-09 |
removal of concrete slab (248 sf) sta 158+20 lt
|
1   |
EACH |
1,000.00 |
1,000.00 |
2,100.00 |
2,100.00 |
3,000.00 |
3,000.00 |
|
|
| 202-02-10 |
removal of structure(rt. of sta. 156+29;20'x 30'
storage building) |
1   |
EACH |
3,000.00 |
3,000.00 |
3,100.00 |
3,100.00 |
4,000.00 |
4,000.00 |
|
|
| 202-02-11 |
removal of chicken coop (sta. 158+50 lt)
|
1   |
EACH |
500.00 |
500.00 |
300.00 |
300.00 |
1.00 |
1.00 |
|
|
| 202-02-12 |
removal of structure(lt. of sta. 158+07;30'x 30' tin
shop) |
1   |
EACH |
3,000.00 |
3,000.00 |
4,200.00 |
4,200.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-13 |
removal of structure(lt. of sta. 161+10;12'x 28' metal
office) |
1   |
EACH |
500.00 |
500.00 |
3,100.00 |
3,100.00 |
4,000.00 |
4,000.00 |
|
|
| 202-02-14 |
removal of playground equipment for apartments (sta
162+40 rt) |
1   |
EACH |
2,000.00 |
2,000.00 |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
|
|
| 202-02-15 |
removal of atm machine (sta 171+00 lt)
|
1   |
EACH |
3,000.00 |
3,000.00 |
300.00 |
300.00 |
1.00 |
1.00 |
|
|
| 202-02-16 |
removal of structure(rt. of sta. 164+17;12'x 15'
concrete slab) |
1   |
EACH |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
|
|
| 202-02-17 |
removal of structure(lt. of sta. 172+99; 75'x 95' meat
market/beauty shop) |
1   |
EACH |
20,000.00 |
20,000.00 |
8,400.00 |
8,400.00 |
9,000.00 |
9,000.00 |
|
|
| 202-02-18 |
removal of 6' board fence (lt. of sta. 160+95- sta
164+78) |
473   |
lnft |
2.00 |
946.00 |
0.40 |
189.20 |
1.00 |
473.00 |
|
|
| 202-02-19 |
removal of existing signal equipment
|
2   |
each |
3,000.00 |
6,000.00 |
3,100.00 |
6,200.00 |
4,000.00 |
8,000.00 |
|
|
| 202-02-20 |
removal of existing fender system and pile clusters
(timber) |
1   |
EACH |
50,000.00 |
50,000.00 |
9,800.00 |
9,800.00 |
100,000.00 |
100,000.00 |
|
|
| 202-02-21 |
removal of wood sign "marty hughes power wash" sta
102+38 lt |
1   |
EACH |
100.00 |
100.00 |
300.00 |
300.00 |
1.00 |
1.00 |
|
|
| 202-02-22 |
removal of wood sign "ouachita river trade days" sta
102+38 lt |
1   |
EACH |
100.00 |
100.00 |
300.00 |
300.00 |
1.00 |
1.00 |
|
|
| 202-02-23 |
removal of metal sign "day's steel & trailer barn" sta
103+53 lt |
1   |
EACH |
100.00 |
100.00 |
300.00 |
300.00 |
1.00 |
1.00 |
|
|
| 202-02-24 |
removal of metal & plastic sign sta 104+16 lt
|
1   |
EACH |
250.00 |
250.00 |
300.00 |
300.00 |
1.00 |
1.00 |
|
|
| 202-02-25 |
removal of light pole sta 104+20 lt
|
1   |
EACH |
250.00 |
250.00 |
1,600.00 |
1,600.00 |
100.00 |
100.00 |
|
|
| 202-02-26 |
removal of metal flag pole sta 104+24 lt
|
1   |
EACH |
100.00 |
100.00 |
300.00 |
300.00 |
1.00 |
1.00 |
|
|
| 202-02-27 |
removal of metal birdhouse sta 104+24 lt
|
1   |
EACH |
100.00 |
100.00 |
300.00 |
300.00 |
1.00 |
1.00 |
|
|
| 202-02-28 |
removal of metal playground equipment sta 141+68 lt
|
1   |
EACH |
1,000.00 |
1,000.00 |
500.00 |
500.00 |
1,000.00 |
1,000.00 |
|
|
| 202-02-29 |
removal of an a/c compressor unit sta 145+25 rt
|
1   |
EACH |
1,000.00 |
1,000.00 |
300.00 |
300.00 |
1.00 |
1.00 |
|
|
| 202-02-30 |
removal of metal & plastic sign (sta 171+32 rt) "cross
keys bank" |
1   |
EACH |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
100.00 |
100.00 |
|
|
| 202-02-31 |
removal of sign (sta 171+14 & 171+90 rt) cross keys
bank exit/enter sign |
2   |
EACH |
100.00 |
200.00 |
300.00 |
600.00 |
1.00 |
2.00 |
|
|
| 202-02-32 |
removal of sign & post (sta 172+60 lt) luther's meat
market |
1   |
EACH |
500.00 |
500.00 |
300.00 |
300.00 |
1.00 |
1.00 |
|
|
| 202-02-33 |
removal of storage bldg on slab (sta 172+65 lt)
-14'x20' |
1   |
EACH |
1,000.00 |
1,000.00 |
2,100.00 |
2,100.00 |
3,000.00 |
3,000.00 |
|
|
| 202-02-34 |
removal of 40'x100' metal building (sta 173+83 lt)
|
1   |
EACH |
15,000.00 |
15,000.00 |
5,200.00 |
5,200.00 |
6,000.00 |
6,000.00 |
|
|
| 202-02-35 |
removal of 4'x8' sign (sta 174+33 lt)-- "bumper to
bumper" |
1   |
EACH |
1,000.00 |
1,000.00 |
300.00 |
300.00 |
1.00 |
1.00 |
|
|
| 202-02-36 |
removal of 20'x23' canopy & pump island(sta 178+07 lt)
--attached to service station not in r/w. |
1   |
EACH |
2,500.00 |
2,500.00 |
4,700.00 |
4,700.00 |
1,800.00 |
1,800.00 |
|
|
| 202-02-37 |
removal of underground storage tanks (parcels 1-1,
12-4, and 17-1) |
5   |
EACH |
8,500.00 |
42,500.00 |
8,900.00 |
44,500.00 |
1,800.00 |
9,000.00 |
|
|
| 202-05 |
excavation, disposal and backfilling of contaminated
soil |
1,000   |
CUYD |
250.00 |
250,000.00 |
168.00 |
168,000.00 |
60.00 |
60,000.00 |
|
|
| 202-06 |
removal and disposal of contaminated fluid
|
2,500   |
GAL |
1.50 |
3,750.00 |
1.60 |
4,000.00 |
0.70 |
1,750.00 |
|
|
| 203-01 |
general excavation
|
32,325   |
CUYD |
8.00 |
258,600.00 |
8.00 |
258,600.00 |
5.00 |
161,625.00 |
|
|
| 203-02 |
drainage excavation
|
774   |
CUYD |
8.00 |
6,192.00 |
8.00 |
6,192.00 |
12.00 |
9,288.00 |
|
|
| 203-04 |
embankment
|
40,558   |
CUYD |
12.00 |
486,696.00 |
12.00 |
486,696.00 |
15.00 |
608,370.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
100   |
EACH |
6.00 |
600.00 |
8.00 |
800.00 |
10.00 |
1,000.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
EACH |
75.00 |
900.00 |
209.00 |
2,508.00 |
150.00 |
1,800.00 |
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
10   |
EACH |
600.00 |
6,000.00 |
393.00 |
3,930.00 |
400.00 |
4,000.00 |
|
|
| 204-06 |
temporary silt fencing
|
8,500   |
LNFT |
1.15 |
9,775.00 |
2.10 |
17,850.00 |
3.00 |
25,500.00 |
|
|
| 302-01 |
class ii base course (stone or recycled ppcp)
|
3,588.5 |
CUYD |
95.00 |
340,907.50 |
95.00 |
340,907.50 |
150.00 |
538,275.00 |
|
|
| 302-02-D |
class ii base course (12" thick)
|
2,200.0 |
SQYD |
33.00 |
72,600.00 |
33.00 |
72,600.00 |
30.00 |
66,000.00 |
|
|
| 302-02-E |
class ii base course (soil cement)(8" thick)
|
32,670.7 |
SQYD |
11.00 |
359,377.70 |
1.00 |
32,670.70 |
10.00 |
326,707.00 |
|
|
| 304-01 |
lime
|
269.75 |
TON |
150.00 |
40,462.50 |
150.00 |
40,462.50 |
160.00 |
43,160.00 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
19,795   |
SQYD |
3.00 |
59,385.00 |
3.00 |
59,385.00 |
1.50 |
29,692.50 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
172   |
CUYD |
103.00 |
17,716.00 |
103.00 |
17,716.00 |
90.00 |
15,480.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,500.0 |
CUYD |
48.00 |
72,000.00 |
48.00 |
72,000.00 |
80.00 |
120,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
7,777.4 |
TON |
82.00 |
637,746.80 |
89.00 |
692,188.60 |
80.00 |
622,192.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
4,252.3 |
TON |
103.00 |
437,986.90 |
112.00 |
476,257.60 |
100.00 |
425,230.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
1,257   |
SQYD |
13.00 |
16,341.00 |
7.30 |
9,176.10 |
5.50 |
6,913.50 |
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
158   |
LNFT |
61.00 |
9,638.00 |
76.00 |
12,008.00 |
70.00 |
11,060.00 |
|
|
| 701-01-Q |
cross drain pipe (60" rcp/pcp)
|
216   |
LNFT |
248.50 |
53,676.00 |
235.00 |
50,760.00 |
215.00 |
46,440.00 |
|
|
| 701-02-L |
cross drain pipe arch (72" equiv. rcpa)
|
378   |
LNFT |
293.00 |
110,754.00 |
315.00 |
119,070.00 |
300.00 |
113,400.00 |
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
511   |
LNFT |
46.00 |
23,506.00 |
48.00 |
24,528.00 |
45.00 |
22,995.00 |
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
220   |
LNFT |
52.00 |
11,440.00 |
48.00 |
10,560.00 |
45.00 |
9,900.00 |
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
428   |
LNFT |
61.00 |
26,108.00 |
71.00 |
30,388.00 |
70.00 |
29,960.00 |
|
|
| 701-04-H |
storm drain pipe arch (48" equiv. rcpa)
|
89   |
LNFT |
184.00 |
16,376.00 |
182.00 |
16,198.00 |
170.00 |
15,130.00 |
|
|
| 701-04-H-01 |
storm drain pipe arch (48" equiv. cmpa)(outfall)
|
57   |
LNFT |
203.00 |
11,571.00 |
182.00 |
10,374.00 |
170.00 |
9,690.00 |
|
|
| 701-05-G |
side drain pipe (18")
|
1,119   |
LNFT |
54.00 |
60,426.00 |
32.00 |
35,808.00 |
35.00 |
39,165.00 |
|
|
| 701-05-I |
side drain pipe (24")
|
798   |
LNFT |
65.00 |
51,870.00 |
47.00 |
37,506.00 |
45.00 |
35,910.00 |
|
|
| 701-05-K |
side drain pipe (30")
|
140   |
LNFT |
110.00 |
15,400.00 |
63.00 |
8,820.00 |
60.00 |
8,400.00 |
|
|
| 701-05-M |
side drain pipe (36")
|
170   |
LNFT |
125.00 |
21,250.00 |
83.00 |
14,110.00 |
80.00 |
13,600.00 |
|
|
| 701-06-F |
side drain pipe arch (36" equiv.)
|
138   |
LNFT |
135.00 |
18,630.00 |
99.00 |
13,662.00 |
95.00 |
13,110.00 |
|
|
| 701-06-H |
side drain pipe arch (48" equiv.)
|
210   |
LNFT |
165.00 |
34,650.00 |
263.00 |
55,230.00 |
250.00 |
52,500.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
20   |
EACH |
2,500.00 |
50,000.00 |
3,800.00 |
76,000.00 |
3,500.00 |
70,000.00 |
|
|
| 702-03-C |
catch basins (cb-06)
|
4   |
EACH |
3,000.00 |
12,000.00 |
5,400.00 |
21,600.00 |
5,000.00 |
20,000.00 |
|
|
| 702-03-D |
catch basins (cb-07)
|
2   |
EACH |
4,500.00 |
9,000.00 |
6,100.00 |
12,200.00 |
6,000.00 |
12,000.00 |
|
|
| 702-03-F |
catch basins (cb-08)
|
2   |
EACH |
7,000.00 |
14,000.00 |
8,000.00 |
16,000.00 |
7,500.00 |
15,000.00 |
|
|
| 704-03 |
blocked out guard rail
|
212.5 |
LNFT |
15.50 |
3,293.75 |
20.00 |
4,250.00 |
16.00 |
3,400.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
49.00 |
4,900.00 |
51.00 |
5,100.00 |
50.00 |
5,000.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
1,850.00 |
7,400.00 |
2,100.00 |
8,400.00 |
1,900.00 |
7,600.00 |
|
|
| 705-02 |
combination mesh & barbed wire fence
|
130   |
LNFT |
7.00 |
910.00 |
6.70 |
871.00 |
9.00 |
1,170.00 |
|
|
| 705-06-A |
chain link fence (4-foot height)
|
452   |
LNFT |
8.00 |
3,616.00 |
17.90 |
8,090.80 |
10.00 |
4,520.00 |
|
|
| 705-06-B |
chain link fence (5-foot height)
|
50   |
LNFT |
12.00 |
600.00 |
22.40 |
1,120.00 |
12.00 |
600.00 |
|
|
| 705-06-C |
chain link fence (6-foot height)
|
873   |
LNFT |
20.00 |
17,460.00 |
28.10 |
24,531.30 |
42.00 |
36,666.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
1,421.3 |
SQYD |
43.00 |
61,115.90 |
53.00 |
75,328.90 |
50.00 |
71,065.00 |
|
|
| 707-03 |
combination concrete curb & gutter
|
1,088.2 |
LNFT |
30.00 |
32,646.00 |
34.00 |
36,998.80 |
40.00 |
43,528.00 |
|
|
| 708-01 |
right-of-way monument
|
71   |
EACH |
100.00 |
7,100.00 |
281.00 |
19,951.00 |
225.00 |
15,975.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
71   |
EACH |
125.00 |
8,875.00 |
252.00 |
17,892.00 |
100.00 |
7,100.00 |
|
|
| 711-02-C |
riprap (30 lb)
|
14   |
CUYD |
165.00 |
2,310.00 |
112.00 |
1,568.00 |
110.00 |
1,540.00 |
|
|
| 711-04 |
geotextile fabric
|
36   |
SQYD |
5.00 |
180.00 |
5.00 |
180.00 |
5.00 |
180.00 |
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
413   |
SQYD |
59.00 |
24,367.00 |
74.00 |
30,562.00 |
100.00 |
41,300.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
130,000.00 |
130,000.00 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
9.000 |
MILE |
592.00 |
5,328.00 |
620.00 |
5,580.00 |
600.00 |
5,400.00 |
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type i removable) |
3.500 |
MILE |
15,840.00 |
55,440.00 |
16,600.00 |
58,100.00 |
16,000.00 |
56,000.00 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
9   |
EACH |
60.00 |
540.00 |
63.00 |
567.00 |
60.00 |
540.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
9   |
EACH |
60.00 |
540.00 |
63.00 |
567.00 |
60.00 |
540.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
30.49 |
ACRE |
495.00 |
15,092.55 |
926.00 |
28,233.74 |
650.00 |
19,818.50 |
|
|
| 717-01 |
seeding
|
1,349   |
LB |
6.50 |
8,768.50 |
9.00 |
12,141.00 |
7.50 |
10,117.50 |
|
|
| 718-01 |
fertilizer
|
28,990   |
LB |
0.29 |
8,407.10 |
0.30 |
8,697.00 |
0.25 |
7,247.50 |
|
|
| 720-01-A |
erosion control sysyem, slope protection (type a)
|
9,450   |
SQYD |
1.25 |
11,812.50 |
1.70 |
16,065.00 |
1.25 |
11,812.50 |
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
278   |
SQYD |
1.25 |
347.50 |
5.80 |
1,612.40 |
3.50 |
973.00 |
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
10,000.00 |
10,000.00 |
16,206.00 |
16,206.00 |
60,000.00 |
60,000.00 |
|
|
| 725-02 |
temporary detour roads
|
5,972.4 |
SQYD |
75.00 |
447,930.00 |
64.00 |
382,233.60 |
110.00 |
656,964.00 |
|
|
| 726-01 |
bedding material
|
675.3 |
CUYD |
80.00 |
54,024.00 |
87.00 |
58,751.10 |
80.00 |
54,024.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
3,100,000.00 |
3,100,000.00 |
3,800,000.00 |
3,800,000.00 |
4,600,000.00 |
4,600,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
70.00 |
280.00 |
81.00 |
324.00 |
70.00 |
280.00 |
|
|
| 729-19-A |
dead end road installations(type a)
|
1   |
EACH |
1,550.00 |
1,550.00 |
1,800.00 |
1,800.00 |
1,600.00 |
1,600.00 |
|
|
| 729-19-B |
dead end road installations(type b)
|
2   |
EACH |
1,300.00 |
2,600.00 |
1,700.00 |
3,400.00 |
1,400.00 |
2,800.00 |
|
|
| 730-09 |
electrical system
|
lump |
LUMP |
50,000.00 |
50,000.00 |
57,900.00 |
57,900.00 |
55,000.00 |
55,000.00 |
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
1,380   |
EACH |
12.00 |
16,560.00 |
12.60 |
17,388.00 |
13.00 |
17,940.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
4,152   |
EACH |
5.50 |
22,836.00 |
5.80 |
24,081.60 |
6.00 |
24,912.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
772   |
LNFT |
0.90 |
694.80 |
1.00 |
772.00 |
1.00 |
772.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
1,265   |
LNFT |
2.70 |
3,415.50 |
2.80 |
3,542.00 |
3.00 |
3,795.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.844 |
MILE |
2,310.00 |
22,739.64 |
2,400.00 |
23,625.60 |
2,400.00 |
23,625.60 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
9   |
EACH |
145.00 |
1,305.00 |
152.00 |
1,368.00 |
150.00 |
1,350.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
9   |
EACH |
155.00 |
1,395.00 |
163.00 |
1,467.00 |
160.00 |
1,440.00 |
|
|
| 735-01 |
mailboxes
|
2   |
EACH |
50.00 |
100.00 |
14.00 |
28.00 |
50.00 |
100.00 |
|
|
| 735-02 |
mailbox supports (single)
|
2   |
EACH |
200.00 |
400.00 |
156.00 |
312.00 |
200.00 |
400.00 |
|
|
| 736-07 |
traffic signal system
|
lump |
LUMP |
65,000.00 |
65,000.00 |
75,200.00 |
75,200.00 |
70,000.00 |
70,000.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
450,000.00 |
450,000.00 |
500,000.00 |
500,000.00 |
600,000.00 |
600,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
200,000.00 |
200,000.00 |
57,900.00 |
57,900.00 |
15,000.00 |
15,000.00 |
|
|
| 802-02 |
structural excavation for intermediate bents
|
3,892.6 |
CUYD |
25.00 |
97,315.00 |
25.00 |
97,315.00 |
20.00 |
77,852.00 |
|
|
| 802-03 |
structural excavation for piers (dry)
|
633.3 |
CUYD |
25.00 |
15,832.50 |
31.00 |
19,632.30 |
25.00 |
15,832.50 |
|
|
| 802-04 |
structural excavation for piers (wet)
|
10,144.8 |
CUYD |
10.00 |
101,448.00 |
9.00 |
91,303.20 |
50.00 |
507,240.00 |
|
|
| 802-05 |
cofferdams
|
lump |
LUMP |
3,300,000.00 |
3,300,000.00 |
1,500,000.00 |
1,500,000.00 |
3,000,000.00 |
3,000,000.00 |
|
|
| 804-01-B |
precast concrete piles (14")
|
36,120   |
LNFT |
27.00 |
975,240.00 |
51.00 |
1,842,120.00 |
50.00 |
1,806,000.00 |
|
|
| 804-01-F |
precast concrete piles (24")
|
5,554   |
LNFT |
85.00 |
472,090.00 |
123.00 |
683,142.00 |
120.00 |
666,480.00 |
|
|
| 804-03 |
steel piles (24" dia. pipe piles, 1/2" wall thickness)
|
11,576   |
LNFT |
70.00 |
810,320.00 |
83.00 |
960,808.00 |
140.00 |
1,620,640.00 |
|
|
| 804-05-B |
precast concrete test piles (14")
|
3   |
EACH |
10,000.00 |
30,000.00 |
4,300.00 |
12,900.00 |
30,000.00 |
90,000.00 |
|
|
| 804-05-F |
precast concrete test piles (24")
|
1   |
EACH |
15,000.00 |
15,000.00 |
9,400.00 |
9,400.00 |
40,000.00 |
40,000.00 |
|
|
| 804-07 |
steel test piles
|
2   |
EACH |
25,000.00 |
50,000.00 |
24,700.00 |
49,400.00 |
120,000.00 |
240,000.00 |
|
|
| 804-09-B |
loading test piles (14")
|
3   |
EACH |
15,000.00 |
45,000.00 |
35,300.00 |
105,900.00 |
1,000.00 |
3,000.00 |
|
|
| 804-09-F |
loading test piles (24")
|
1   |
EACH |
15,000.00 |
15,000.00 |
36,700.00 |
36,700.00 |
2,000.00 |
2,000.00 |
|
|
| 804-09-J |
loading test piles (24" steel)
|
2   |
EACH |
25,000.00 |
50,000.00 |
37,700.00 |
75,400.00 |
8,000.00 |
16,000.00 |
|
|
| 804-10-B |
reloading test piles (14")
|
3   |
EACH |
5,000.00 |
15,000.00 |
7,400.00 |
22,200.00 |
1,000.00 |
3,000.00 |
|
|
| 804-10-F |
reloading test piles (24")
|
1   |
EACH |
5,000.00 |
5,000.00 |
7,400.00 |
7,400.00 |
1,000.00 |
1,000.00 |
|
|
| 804-10-J |
reloading test piles (24" steel)
|
2   |
EACH |
10,000.00 |
20,000.00 |
7,400.00 |
14,800.00 |
5,000.00 |
10,000.00 |
|
|
| 804-11-B |
redriving test piles (14")
|
3   |
EACH |
2,000.00 |
6,000.00 |
3,700.00 |
11,100.00 |
1,000.00 |
3,000.00 |
|
|
| 804-11-F |
redriving test piles (24")
|
1   |
EACH |
2,000.00 |
2,000.00 |
3,700.00 |
3,700.00 |
1,000.00 |
1,000.00 |
|
|
| 804-11-J |
redriving test piles (24" steel)
|
2   |
EACH |
3,000.00 |
6,000.00 |
3,700.00 |
7,400.00 |
3,000.00 |
6,000.00 |
|
|
| 804-12-B |
loading permanent piles (14")
|
1   |
EACH |
15,000.00 |
15,000.00 |
14,700.00 |
14,700.00 |
2,000.00 |
2,000.00 |
|
|
| 804-12-F |
loading permanent piles (24")
|
1   |
EACH |
15,000.00 |
15,000.00 |
14,700.00 |
14,700.00 |
4,000.00 |
4,000.00 |
|
|
| 804-12-J |
loading permanent piles (24" steel)
|
1   |
EACH |
20,000.00 |
20,000.00 |
14,700.00 |
14,700.00 |
8,000.00 |
8,000.00 |
|
|
| 804-17 |
dynamic monitoring
|
22   |
EACH |
2,500.00 |
55,000.00 |
3,000.00 |
66,000.00 |
500.00 |
11,000.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
5.90 |
CUYD |
1,200.00 |
7,080.00 |
1,509.00 |
8,903.10 |
1,250.00 |
7,375.00 |
|
|
| 805-01-D |
class a concrete (footings)
|
4,644.83 |
CUYD |
350.00 |
1,625,690.50 |
200.00 |
928,966.00 |
210.00 |
975,414.30 |
|
|
| 805-01-E |
class a concrete (piers)
|
3,004.50 |
CUYD |
375.00 |
1,126,687.50 |
400.00 |
1,201,800.00 |
480.00 |
1,442,160.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
2,236.28 |
CUYD |
375.00 |
838,605.00 |
500.00 |
1,118,140.00 |
520.00 |
1,162,865.60 |
|
|
| 805-03 |
class aa concrete
|
1,453.46 |
CUYD |
400.00 |
581,384.00 |
500.00 |
726,730.00 |
665.00 |
966,550.90 |
|
|
| 805-04 |
class aa(m) concrete
|
5,276.20 |
CUYD |
400.00 |
2,110,480.00 |
500.00 |
2,638,100.00 |
580.00 |
3,060,196.00 |
|
|
| 805-07 |
class s concrete
|
2,864.98 |
CUYD |
250.00 |
716,245.00 |
200.00 |
572,996.00 |
260.00 |
744,894.80 |
|
|
| 805-08-B |
precast-prestressed concrete girders (type ii)
|
2,776.2 |
LNFT |
100.00 |
277,620.00 |
110.00 |
305,382.00 |
110.00 |
305,382.00 |
|
|
| 805-08-G |
precast-prestressed concrete girders (type bt-72)
|
22,185.3 |
LNFT |
210.00 |
4,658,913.00 |
220.00 |
4,880,766.00 |
230.00 |
5,102,619.00 |
|
|
| 805-11 |
strip seal joints
|
657.05 |
LNFT |
150.00 |
98,557.50 |
131.00 |
86,073.55 |
130.00 |
85,416.50 |
|
|
| 805-12-Y |
reinforced concrete box culverts (5'x2')(extension)
|
20.0 |
LNFT |
550.00 |
11,000.00 |
700.00 |
14,000.00 |
570.00 |
11,400.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
1,711,076   |
LB |
0.60 |
1,026,645.60 |
0.78 |
1,334,639.28 |
0.75 |
1,283,307.00 |
|
|
| 806-02 |
deformed reinforcing steel (epoxy coated)
|
1,363,794   |
LB |
0.75 |
1,022,845.50 |
0.91 |
1,241,052.54 |
0.80 |
1,091,035.20 |
|
|
| 807-06 |
structural metalwork
|
lump |
LUMP |
5,000,000.00 |
5,000,000.00 |
5,230,000.00 |
5,230,000.00 |
7,500,000.00 |
7,500,000.00 |
|
|
| 810-01 |
concrete railing (barrier)
|
9,204.01 |
LNFT |
50.00 |
460,200.50 |
88.00 |
809,952.88 |
42.00 |
386,568.42 |
|
|
| 813-01 |
concrete approach slabs
|
451.94 |
SQYD |
135.00 |
61,011.90 |
223.00 |
100,782.62 |
140.00 |
63,271.60 |
|
|
| S-101 |
construction site survey
|
lump |
LUMP |
300,000.00 |
300,000.00 |
150,000.00 |
150,000.00 |
310,000.00 |
310,000.00 |
|
|
| S-102 |
vibration monitoring
|
lump |
LUMP |
200,000.00 |
200,000.00 |
262,000.00 |
262,000.00 |
186,000.00 |
186,000.00 |
|
|
| S-103 |
clearance gauge
|
lump |
LUMP |
100,000.00 |
100,000.00 |
2,000.00 |
2,000.00 |
50,000.00 |
50,000.00 |
|
|
| S-104 |
steel cover plate
|
60   |
EACH |
150.00 |
9,000.00 |
190.00 |
11,400.00 |
200.00 |
12,000.00 |
|
|
| S-105 |
finger joint
|
93.0 |
LNFT |
700.00 |
65,100.00 |
800.00 |
74,400.00 |
1,000.00 |
93,000.00 |
|
|
| S-106 |
deck drainage systems
|
lump |
LUMP |
100,000.00 |
100,000.00 |
85,800.00 |
85,800.00 |
80,000.00 |
80,000.00 |
|
|
| S-107 |
temporary haul road
|
lump |
LUMP |
250,000.00 |
250,000.00 |
500,000.00 |
500,000.00 |
1,000,000.00 |
1,000,000.00 |
|
|
| S-108 |
pier access ladder and landing
|
2   |
EACH |
100,000.00 |
200,000.00 |
43,900.00 |
87,800.00 |
60,000.00 |
120,000.00 |
|
|
| S-109 |
dynamic analysis
|
22   |
EACH |
2,500.00 |
55,000.00 |
1,500.00 |
33,000.00 |
800.00 |
17,600.00 |
|
|
| S-110 |
loading test piles (tension)
|
2   |
EACH |
20,000.00 |
40,000.00 |
37,600.00 |
75,200.00 |
15,000.00 |
30,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
36,972,254.14 |
|
38,701,503.01 |
|
46,734,475.62 |
|
|
|