Letting of 10/12/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 070-06-0022
Parish: OUACHITA, UNION
Routes: LA 2
Description: OUACHITA RIVER BRIDGE AT STERLINGTON
Type Const: grading,cold planing asph pvmt,drain struct,lime trmt,class ii bc,superpave acp,cofferdams,precast
prestressed concspan & steel plate girder span bridge,traffic signal,& related wk
 
RankLicenseBidderAmount
112395 JENSEN CONSTRUCTION CO. $36,972,254.14
242076 AUSTIN BRIDGE & ROAD, LP $38,701,503.01
334567 JAMES CONSTRUCTION GROUP LLC $46,734,475.62
 
Item Number Item Description Quantity Unit of Measure - 1 -
JENSEN CONSTRUCTION CO.
- 2 -
AUSTIN BRIDGE & ROAD, LP
- 3 -
JAMES CONSTRUCTION GROUP LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 500,000.00 500,000.00 79,000.00 79,000.00 1,200,000.00 1,200,000.00    
202-01 removal of structures & obstructions lump      LUMP 50,000.00 50,000.00 52,000.00 52,000.00 25,000.00 25,000.00    
202-02-A removal of bridges (sta. 132+57, 20'x 925',swing span
bridge)
1      EACH 500,000.00 500,000.00 1,300,000.00 1,300,000.00 750,000.00 750,000.00    
202-02-C-01 removal of portland cement concrete pavement w/ hmac
overlay
6,370      SQYD 9.00 57,330.00 9.50 60,515.00 3.00 19,110.00    
202-02-D removal of concrete walks & drives 2,960      SQYD 7.00 20,720.00 7.30 21,608.00 3.00 8,880.00    
202-02-E removal of concrete curbs 747.8    LNFT 1.00 747.80 1.10 822.58 10.00 7,478.00    
202-02-G removal of surfacing & stabilized base 12,541.1    SQYD 7.00 87,787.70 7.20 90,295.92 2.00 25,082.20    
202-02-01 removal of structure(rt. of sta. 102+20;wood residence) 1      EACH 6,000.00 6,000.00 4,200.00 4,200.00 5,000.00 5,000.00    
202-02-02 removal of structure(lt. of sta. 146+60;concrete slab) 1      EACH 1,000.00 1,000.00 3,100.00 3,100.00 4,000.00 4,000.00    
202-02-03 removal of structure(sta. 147+85 lt;brick church
building)
1      EACH 20,000.00 20,000.00 7,300.00 7,300.00 8,000.00 8,000.00    
202-02-04 removal of concrete slab; sta 145+25 rt 1      EACH 4,000.00 4,000.00 4,200.00 4,200.00 5,000.00 5,000.00    
202-02-05 removal of structure(sta. 151+11;30'x30' concrete slab) 1      EACH 4,000.00 4,000.00 3,100.00 3,100.00 4,000.00 4,000.00    
202-02-06 removal of structure(rt. of sta. 151+38;110'x 50'
brick restaurant)
1      EACH 20,000.00 20,000.00 6,300.00 6,300.00 7,000.00 7,000.00    
202-02-07 removal of structure(rt. of sta. 152+87;23'x 30'
building)
1      EACH 5,000.00 5,000.00 4,200.00 4,200.00 5,000.00 5,000.00    
202-02-08 removal of metal stprage bldg. sta 156+06 rt 1      EACH 500.00 500.00 3,100.00 3,100.00 4,000.00 4,000.00    
202-02-09 removal of concrete slab (248 sf) sta 158+20 lt 1      EACH 1,000.00 1,000.00 2,100.00 2,100.00 3,000.00 3,000.00    
202-02-10 removal of structure(rt. of sta. 156+29;20'x 30'
storage building)
1      EACH 3,000.00 3,000.00 3,100.00 3,100.00 4,000.00 4,000.00    
202-02-11 removal of chicken coop (sta. 158+50 lt) 1      EACH 500.00 500.00 300.00 300.00 1.00 1.00    
202-02-12 removal of structure(lt. of sta. 158+07;30'x 30' tin
shop)
1      EACH 3,000.00 3,000.00 4,200.00 4,200.00 5,000.00 5,000.00    
202-02-13 removal of structure(lt. of sta. 161+10;12'x 28' metal
office)
1      EACH 500.00 500.00 3,100.00 3,100.00 4,000.00 4,000.00    
202-02-14 removal of playground equipment for apartments (sta
162+40 rt)
1      EACH 2,000.00 2,000.00 1,000.00 1,000.00 2,000.00 2,000.00    
202-02-15 removal of atm machine (sta 171+00 lt) 1      EACH 3,000.00 3,000.00 300.00 300.00 1.00 1.00    
202-02-16 removal of structure(rt. of sta. 164+17;12'x 15'
concrete slab)
1      EACH 1,000.00 1,000.00 1,000.00 1,000.00 2,000.00 2,000.00    
202-02-17 removal of structure(lt. of sta. 172+99; 75'x 95' meat
market/beauty shop)
1      EACH 20,000.00 20,000.00 8,400.00 8,400.00 9,000.00 9,000.00    
202-02-18 removal of 6' board fence (lt. of sta. 160+95- sta
164+78)
473      lnft 2.00 946.00 0.40 189.20 1.00 473.00    
202-02-19 removal of existing signal equipment 2      each 3,000.00 6,000.00 3,100.00 6,200.00 4,000.00 8,000.00    
202-02-20 removal of existing fender system and pile clusters
(timber)
1      EACH 50,000.00 50,000.00 9,800.00 9,800.00 100,000.00 100,000.00    
202-02-21 removal of wood sign "marty hughes power wash" sta
102+38 lt
1      EACH 100.00 100.00 300.00 300.00 1.00 1.00    
202-02-22 removal of wood sign "ouachita river trade days" sta
102+38 lt
1      EACH 100.00 100.00 300.00 300.00 1.00 1.00    
202-02-23 removal of metal sign "day's steel & trailer barn" sta
103+53 lt
1      EACH 100.00 100.00 300.00 300.00 1.00 1.00    
202-02-24 removal of metal & plastic sign sta 104+16 lt 1      EACH 250.00 250.00 300.00 300.00 1.00 1.00    
202-02-25 removal of light pole sta 104+20 lt 1      EACH 250.00 250.00 1,600.00 1,600.00 100.00 100.00    
202-02-26 removal of metal flag pole sta 104+24 lt 1      EACH 100.00 100.00 300.00 300.00 1.00 1.00    
202-02-27 removal of metal birdhouse sta 104+24 lt 1      EACH 100.00 100.00 300.00 300.00 1.00 1.00    
202-02-28 removal of metal playground equipment sta 141+68 lt 1      EACH 1,000.00 1,000.00 500.00 500.00 1,000.00 1,000.00    
202-02-29 removal of an a/c compressor unit sta 145+25 rt 1      EACH 1,000.00 1,000.00 300.00 300.00 1.00 1.00    
202-02-30 removal of metal & plastic sign (sta 171+32 rt) "cross
keys bank"
1      EACH 1,000.00 1,000.00 100.00 100.00 100.00 100.00    
202-02-31 removal of sign (sta 171+14 & 171+90 rt) cross keys
bank exit/enter sign
2      EACH 100.00 200.00 300.00 600.00 1.00 2.00    
202-02-32 removal of sign & post (sta 172+60 lt) luther's meat
market
1      EACH 500.00 500.00 300.00 300.00 1.00 1.00    
202-02-33 removal of storage bldg on slab (sta 172+65 lt)
-14'x20'
1      EACH 1,000.00 1,000.00 2,100.00 2,100.00 3,000.00 3,000.00    
202-02-34 removal of 40'x100' metal building (sta 173+83 lt) 1      EACH 15,000.00 15,000.00 5,200.00 5,200.00 6,000.00 6,000.00    
202-02-35 removal of 4'x8' sign (sta 174+33 lt)-- "bumper to
bumper"
1      EACH 1,000.00 1,000.00 300.00 300.00 1.00 1.00    
202-02-36 removal of 20'x23' canopy & pump island(sta 178+07 lt)
--attached to service station not in r/w.
1      EACH 2,500.00 2,500.00 4,700.00 4,700.00 1,800.00 1,800.00    
202-02-37 removal of underground storage tanks (parcels 1-1,
12-4, and 17-1)
5      EACH 8,500.00 42,500.00 8,900.00 44,500.00 1,800.00 9,000.00    
202-05 excavation, disposal and backfilling of contaminated
soil
1,000      CUYD 250.00 250,000.00 168.00 168,000.00 60.00 60,000.00    
202-06 removal and disposal of contaminated fluid 2,500      GAL 1.50 3,750.00 1.60 4,000.00 0.70 1,750.00    
203-01 general excavation 32,325      CUYD 8.00 258,600.00 8.00 258,600.00 5.00 161,625.00    
203-02 drainage excavation 774      CUYD 8.00 6,192.00 8.00 6,192.00 12.00 9,288.00    
203-04 embankment 40,558      CUYD 12.00 486,696.00 12.00 486,696.00 15.00 608,370.00    
204-02 temporary hay or straw bales 100      EACH 6.00 600.00 8.00 800.00 10.00 1,000.00    
204-05-A temporary sediment check dams (hay) 12      EACH 75.00 900.00 209.00 2,508.00 150.00 1,800.00    
204-05-B temporary sediment check dams (stone) 10      EACH 600.00 6,000.00 393.00 3,930.00 400.00 4,000.00    
204-06 temporary silt fencing 8,500      LNFT 1.15 9,775.00 2.10 17,850.00 3.00 25,500.00    
302-01 class ii base course (stone or recycled ppcp) 3,588.5    CUYD 95.00 340,907.50 95.00 340,907.50 150.00 538,275.00    
302-02-D class ii base course (12" thick) 2,200.0    SQYD 33.00 72,600.00 33.00 72,600.00 30.00 66,000.00    
302-02-E class ii base course (soil cement)(8" thick) 32,670.7    SQYD 11.00 359,377.70 1.00 32,670.70 10.00 326,707.00    
304-01 lime 269.75   TON 150.00 40,462.50 150.00 40,462.50 160.00 43,160.00    
304-04-D lime treatment (type d) (12" thick) 19,795      SQYD 3.00 59,385.00 3.00 59,385.00 1.50 29,692.50    
401-02 aggregate surface course (adjusted vehicular
measurement)
172      CUYD 103.00 17,716.00 103.00 17,716.00 90.00 15,480.00    
402-01 traffic maintenance aggregate (vehicular measurement) 1,500.0    CUYD 48.00 72,000.00 48.00 72,000.00 80.00 120,000.00    
502-01 superpave asphaltic concrete 7,777.4    TON 82.00 637,746.80 89.00 692,188.60 80.00 622,192.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
4,252.3    TON 103.00 437,986.90 112.00 476,257.60 100.00 425,230.00    
509-01 cold planing asphaltic pavement 1,257      SQYD 13.00 16,341.00 7.30 9,176.10 5.50 6,913.50    
701-01-I cross drain pipe (24" rcp/pcp) 158      LNFT 61.00 9,638.00 76.00 12,008.00 70.00 11,060.00    
701-01-Q cross drain pipe (60" rcp/pcp) 216      LNFT 248.50 53,676.00 235.00 50,760.00 215.00 46,440.00    
701-02-L cross drain pipe arch (72" equiv. rcpa) 378      LNFT 293.00 110,754.00 315.00 119,070.00 300.00 113,400.00    
701-03-F storm drain pipe (15" rcp/pcp) 511      LNFT 46.00 23,506.00 48.00 24,528.00 45.00 22,995.00    
701-03-G storm drain pipe (18" rcp/pcp) 220      LNFT 52.00 11,440.00 48.00 10,560.00 45.00 9,900.00    
701-03-I storm drain pipe (24" rcp/pcp) 428      LNFT 61.00 26,108.00 71.00 30,388.00 70.00 29,960.00    
701-04-H storm drain pipe arch (48" equiv. rcpa) 89      LNFT 184.00 16,376.00 182.00 16,198.00 170.00 15,130.00    
701-04-H-01 storm drain pipe arch (48" equiv. cmpa)(outfall) 57      LNFT 203.00 11,571.00 182.00 10,374.00 170.00 9,690.00    
701-05-G side drain pipe (18") 1,119      LNFT 54.00 60,426.00 32.00 35,808.00 35.00 39,165.00    
701-05-I side drain pipe (24") 798      LNFT 65.00 51,870.00 47.00 37,506.00 45.00 35,910.00    
701-05-K side drain pipe (30") 140      LNFT 110.00 15,400.00 63.00 8,820.00 60.00 8,400.00    
701-05-M side drain pipe (36") 170      LNFT 125.00 21,250.00 83.00 14,110.00 80.00 13,600.00    
701-06-F side drain pipe arch (36" equiv.) 138      LNFT 135.00 18,630.00 99.00 13,662.00 95.00 13,110.00    
701-06-H side drain pipe arch (48" equiv.) 210      LNFT 165.00 34,650.00 263.00 55,230.00 250.00 52,500.00    
702-03-A catch basins (cb-01) 20      EACH 2,500.00 50,000.00 3,800.00 76,000.00 3,500.00 70,000.00    
702-03-C catch basins (cb-06) 4      EACH 3,000.00 12,000.00 5,400.00 21,600.00 5,000.00 20,000.00    
702-03-D catch basins (cb-07) 2      EACH 4,500.00 9,000.00 6,100.00 12,200.00 6,000.00 12,000.00    
702-03-F catch basins (cb-08) 2      EACH 7,000.00 14,000.00 8,000.00 16,000.00 7,500.00 15,000.00    
704-03 blocked out guard rail 212.5    LNFT 15.50 3,293.75 20.00 4,250.00 16.00 3,400.00    
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 49.00 4,900.00 51.00 5,100.00 50.00 5,000.00    
704-11-A guard rail end treatment (flared) 4      EACH 1,850.00 7,400.00 2,100.00 8,400.00 1,900.00 7,600.00    
705-02 combination mesh & barbed wire fence 130      LNFT 7.00 910.00 6.70 871.00 9.00 1,170.00    
705-06-A chain link fence (4-foot height) 452      LNFT 8.00 3,616.00 17.90 8,090.80 10.00 4,520.00    
705-06-B chain link fence (5-foot height) 50      LNFT 12.00 600.00 22.40 1,120.00 12.00 600.00    
705-06-C chain link fence (6-foot height) 873      LNFT 20.00 17,460.00 28.10 24,531.30 42.00 36,666.00    
706-02-C concrete drive (6" thick) 1,421.3    SQYD 43.00 61,115.90 53.00 75,328.90 50.00 71,065.00    
707-03 combination concrete curb & gutter 1,088.2    LNFT 30.00 32,646.00 34.00 36,998.80 40.00 43,528.00    
708-01 right-of-way monument 71      EACH 100.00 7,100.00 281.00 19,951.00 225.00 15,975.00    
708-02 right-of-way monument witness post 71      EACH 125.00 8,875.00 252.00 17,892.00 100.00 7,100.00    
711-02-C riprap (30 lb) 14      CUYD 165.00 2,310.00 112.00 1,568.00 110.00 1,540.00    
711-04 geotextile fabric 36      SQYD 5.00 180.00 5.00 180.00 5.00 180.00    
712-01-A concrete cast-in-place revetment (4" thick) 413      SQYD 59.00 24,367.00 74.00 30,562.00 100.00 41,300.00    
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00 100,000.00 100,000.00 130,000.00 130,000.00    
713-05-A temporary pavement markings (solid line)(4" width) 9.000  MILE 592.00 5,328.00 620.00 5,580.00 600.00 5,400.00    
713-05-A-01 temporary pavement markings (solid line)(4" width)
(type i removable)
3.500  MILE 15,840.00 55,440.00 16,600.00 58,100.00 16,000.00 56,000.00    
713-06-A temporary pavement legends and symbols (arrow) 9      EACH 60.00 540.00 63.00 567.00 60.00 540.00    
713-06-C temporary pavement legends and symbols (only) 9      EACH 60.00 540.00 63.00 567.00 60.00 540.00    
716-01-A mulch (vegetative) 30.49   ACRE 495.00 15,092.55 926.00 28,233.74 650.00 19,818.50    
717-01 seeding 1,349      LB 6.50 8,768.50 9.00 12,141.00 7.50 10,117.50    
718-01 fertilizer 28,990      LB 0.29 8,407.10 0.30 8,697.00 0.25 7,247.50    
720-01-A erosion control sysyem, slope protection (type a) 9,450      SQYD 1.25 11,812.50 1.70 16,065.00 1.25 11,812.50    
720-01-D erosion control system, flexible channel liner (type d) 278      SQYD 1.25 347.50 5.80 1,612.40 3.50 973.00    
722-02 project site laboratory (equipped) 1      EACH 10,000.00 10,000.00 16,206.00 16,206.00 60,000.00 60,000.00    
725-02 temporary detour roads 5,972.4    SQYD 75.00 447,930.00 64.00 382,233.60 110.00 656,964.00    
726-01 bedding material 675.3    CUYD 80.00 54,024.00 87.00 58,751.10 80.00 54,024.00    
727-01 mobilization lump      LUMP 3,100,000.00 3,100,000.00 3,800,000.00 3,800,000.00 4,600,000.00 4,600,000.00    
729-16-C object marker assembly (type 3) 4      EACH 70.00 280.00 81.00 324.00 70.00 280.00    
729-19-A dead end road installations(type a) 1      EACH 1,550.00 1,550.00 1,800.00 1,800.00 1,600.00 1,600.00    
729-19-B dead end road installations(type b) 2      EACH 1,300.00 2,600.00 1,700.00 3,400.00 1,400.00 2,800.00    
730-09 electrical system lump      LUMP 50,000.00 50,000.00 57,900.00 57,900.00 55,000.00 55,000.00    
731-01 nonreflectorized raised pavement markers 1,380      EACH 12.00 16,560.00 12.60 17,388.00 13.00 17,940.00    
731-02 reflectorized raised pavement markers 4,152      EACH 5.50 22,836.00 5.80 24,081.60 6.00 24,912.00    
732-01-C plastic pavement striping (8" width) 772      LNFT 0.90 694.80 1.00 772.00 1.00 772.00    
732-01-E plastic pavement striping (24" width) 1,265      LNFT 2.70 3,415.50 2.80 3,542.00 3.00 3,795.00    
732-02-A plastic pavement striping (solid line) (4" width) 9.844  MILE 2,310.00 22,739.64 2,400.00 23,625.60 2,400.00 23,625.60    
732-04-A plastic pavement legends & symbols (arrow) 9      EACH 145.00 1,305.00 152.00 1,368.00 150.00 1,350.00    
732-04-C plastic pavement legends & symbols (only) 9      EACH 155.00 1,395.00 163.00 1,467.00 160.00 1,440.00    
735-01 mailboxes 2      EACH 50.00 100.00 14.00 28.00 50.00 100.00    
735-02 mailbox supports (single) 2      EACH 200.00 400.00 156.00 312.00 200.00 400.00    
736-07 traffic signal system lump      LUMP 65,000.00 65,000.00 75,200.00 75,200.00 70,000.00 70,000.00    
740-01 construction layout lump      LUMP 450,000.00 450,000.00 500,000.00 500,000.00 600,000.00 600,000.00    
744-01 traffic control management lump      LUMP 200,000.00 200,000.00 57,900.00 57,900.00 15,000.00 15,000.00    
802-02 structural excavation for intermediate bents 3,892.6    CUYD 25.00 97,315.00 25.00 97,315.00 20.00 77,852.00    
802-03 structural excavation for piers (dry) 633.3    CUYD 25.00 15,832.50 31.00 19,632.30 25.00 15,832.50    
802-04 structural excavation for piers (wet) 10,144.8    CUYD 10.00 101,448.00 9.00 91,303.20 50.00 507,240.00    
802-05 cofferdams lump      LUMP 3,300,000.00 3,300,000.00 1,500,000.00 1,500,000.00 3,000,000.00 3,000,000.00    
804-01-B precast concrete piles (14") 36,120      LNFT 27.00 975,240.00 51.00 1,842,120.00 50.00 1,806,000.00    
804-01-F precast concrete piles (24") 5,554      LNFT 85.00 472,090.00 123.00 683,142.00 120.00 666,480.00    
804-03 steel piles (24" dia. pipe piles, 1/2" wall thickness) 11,576      LNFT 70.00 810,320.00 83.00 960,808.00 140.00 1,620,640.00    
804-05-B precast concrete test piles (14") 3      EACH 10,000.00 30,000.00 4,300.00 12,900.00 30,000.00 90,000.00    
804-05-F precast concrete test piles (24") 1      EACH 15,000.00 15,000.00 9,400.00 9,400.00 40,000.00 40,000.00    
804-07 steel test piles 2      EACH 25,000.00 50,000.00 24,700.00 49,400.00 120,000.00 240,000.00    
804-09-B loading test piles (14") 3      EACH 15,000.00 45,000.00 35,300.00 105,900.00 1,000.00 3,000.00    
804-09-F loading test piles (24") 1      EACH 15,000.00 15,000.00 36,700.00 36,700.00 2,000.00 2,000.00    
804-09-J loading test piles (24" steel) 2      EACH 25,000.00 50,000.00 37,700.00 75,400.00 8,000.00 16,000.00    
804-10-B reloading test piles (14") 3      EACH 5,000.00 15,000.00 7,400.00 22,200.00 1,000.00 3,000.00    
804-10-F reloading test piles (24") 1      EACH 5,000.00 5,000.00 7,400.00 7,400.00 1,000.00 1,000.00    
804-10-J reloading test piles (24" steel) 2      EACH 10,000.00 20,000.00 7,400.00 14,800.00 5,000.00 10,000.00    
804-11-B redriving test piles (14") 3      EACH 2,000.00 6,000.00 3,700.00 11,100.00 1,000.00 3,000.00    
804-11-F redriving test piles (24") 1      EACH 2,000.00 2,000.00 3,700.00 3,700.00 1,000.00 1,000.00    
804-11-J redriving test piles (24" steel) 2      EACH 3,000.00 6,000.00 3,700.00 7,400.00 3,000.00 6,000.00    
804-12-B loading permanent piles (14") 1      EACH 15,000.00 15,000.00 14,700.00 14,700.00 2,000.00 2,000.00    
804-12-F loading permanent piles (24") 1      EACH 15,000.00 15,000.00 14,700.00 14,700.00 4,000.00 4,000.00    
804-12-J loading permanent piles (24" steel) 1      EACH 20,000.00 20,000.00 14,700.00 14,700.00 8,000.00 8,000.00    
804-17 dynamic monitoring 22      EACH 2,500.00 55,000.00 3,000.00 66,000.00 500.00 11,000.00    
805-01-B class a concrete (box culvert headwalls) 5.90   CUYD 1,200.00 7,080.00 1,509.00 8,903.10 1,250.00 7,375.00    
805-01-D class a concrete (footings) 4,644.83   CUYD 350.00 1,625,690.50 200.00 928,966.00 210.00 975,414.30    
805-01-E class a concrete (piers) 3,004.50   CUYD 375.00 1,126,687.50 400.00 1,201,800.00 480.00 1,442,160.00    
805-01-F class a concrete (bents) 2,236.28   CUYD 375.00 838,605.00 500.00 1,118,140.00 520.00 1,162,865.60    
805-03 class aa concrete 1,453.46   CUYD 400.00 581,384.00 500.00 726,730.00 665.00 966,550.90    
805-04 class aa(m) concrete 5,276.20   CUYD 400.00 2,110,480.00 500.00 2,638,100.00 580.00 3,060,196.00    
805-07 class s concrete 2,864.98   CUYD 250.00 716,245.00 200.00 572,996.00 260.00 744,894.80    
805-08-B precast-prestressed concrete girders (type ii) 2,776.2    LNFT 100.00 277,620.00 110.00 305,382.00 110.00 305,382.00    
805-08-G precast-prestressed concrete girders (type bt-72) 22,185.3    LNFT 210.00 4,658,913.00 220.00 4,880,766.00 230.00 5,102,619.00    
805-11 strip seal joints 657.05   LNFT 150.00 98,557.50 131.00 86,073.55 130.00 85,416.50    
805-12-Y reinforced concrete box culverts (5'x2')(extension) 20.0    LNFT 550.00 11,000.00 700.00 14,000.00 570.00 11,400.00    
806-01 deformed reinforcing steel 1,711,076      LB 0.60 1,026,645.60 0.78 1,334,639.28 0.75 1,283,307.00    
806-02 deformed reinforcing steel (epoxy coated) 1,363,794      LB 0.75 1,022,845.50 0.91 1,241,052.54 0.80 1,091,035.20    
807-06 structural metalwork lump      LUMP 5,000,000.00 5,000,000.00 5,230,000.00 5,230,000.00 7,500,000.00 7,500,000.00    
810-01 concrete railing (barrier) 9,204.01   LNFT 50.00 460,200.50 88.00 809,952.88 42.00 386,568.42    
813-01 concrete approach slabs 451.94   SQYD 135.00 61,011.90 223.00 100,782.62 140.00 63,271.60    
S-101 construction site survey lump      LUMP 300,000.00 300,000.00 150,000.00 150,000.00 310,000.00 310,000.00    
S-102 vibration monitoring lump      LUMP 200,000.00 200,000.00 262,000.00 262,000.00 186,000.00 186,000.00    
S-103 clearance gauge lump      LUMP 100,000.00 100,000.00 2,000.00 2,000.00 50,000.00 50,000.00    
S-104 steel cover plate 60      EACH 150.00 9,000.00 190.00 11,400.00 200.00 12,000.00    
S-105 finger joint 93.0    LNFT 700.00 65,100.00 800.00 74,400.00 1,000.00 93,000.00    
S-106 deck drainage systems lump      LUMP 100,000.00 100,000.00 85,800.00 85,800.00 80,000.00 80,000.00    
S-107 temporary haul road lump      LUMP 250,000.00 250,000.00 500,000.00 500,000.00 1,000,000.00 1,000,000.00    
S-108 pier access ladder and landing 2      EACH 100,000.00 200,000.00 43,900.00 87,800.00 60,000.00 120,000.00    
S-109 dynamic analysis 22      EACH 2,500.00 55,000.00 1,500.00 33,000.00 800.00 17,600.00    
S-110 loading test piles (tension) 2      EACH 20,000.00 40,000.00 37,600.00 75,200.00 15,000.00 30,000.00    
                       
 CONTRACTOR TOTAL       36,972,254.14   38,701,503.01   46,734,475.62    