| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - R. E. HEIDT CONSTRUCTION CO., INC. |
- 2 - PRAIRIE CONTRACTORS INC. |
- 3 - BESSETTE DEVELOPMENT CORP. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
1,081   |
LNFT |
7.45 |
8,053.45 |
5.00 |
5,405.00 |
3.25 |
3,513.25 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
300   |
CUYD |
26.30 |
7,890.00 |
20.00 |
6,000.00 |
20.25 |
6,075.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
5,082   |
CUYD |
40.00 |
203,280.00 |
37.00 |
188,034.00 |
76.00 |
386,232.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
28,753.0 |
TON |
56.20 |
1,615,918.60 |
63.00 |
1,811,439.00 |
63.55 |
1,827,253.15 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
miscellaneous |
893.2 |
TON |
86.10 |
76,904.52 |
75.00 |
66,990.00 |
59.00 |
52,698.80 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
131,681   |
SQYD |
0.73 |
96,127.13 |
1.14 |
150,116.34 |
0.60 |
79,008.60 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,747   |
CUYD |
1.00 |
- 3,747.00 |
0.01 |
- 37.47 |
1.00 |
- 3,747.00 |
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
42,346   |
LNFT |
1.21 |
51,238.66 |
1.17 |
49,544.82 |
1.25 |
52,932.50 |
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
38,111   |
LNFT |
1.37 |
52,212.07 |
1.32 |
50,306.52 |
1.40 |
53,355.40 |
|
|
| 702-04-B |
adjusting catch basins
|
2   |
EACH |
2,310.00 |
4,620.00 |
2,400.00 |
4,800.00 |
2,300.00 |
4,600.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
100.0 |
LNFT |
42.00 |
4,200.00 |
33.00 |
3,300.00 |
43.25 |
4,325.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
152.0 |
LNFT |
36.75 |
5,586.00 |
48.00 |
7,296.00 |
38.00 |
5,776.00 |
|
|
| 704-03 |
blocked out guard rail
|
568.8 |
LNFT |
17.35 |
9,868.68 |
16.50 |
9,385.20 |
17.85 |
10,153.08 |
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
50.0 |
LNFT |
31.50 |
1,575.00 |
45.00 |
2,250.00 |
32.50 |
1,625.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
91.8 |
LNFT |
47.25 |
4,337.55 |
50.00 |
4,590.00 |
48.75 |
4,475.25 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
7   |
EACH |
1,950.00 |
13,650.00 |
1,900.00 |
13,300.00 |
2,005.00 |
14,035.00 |
|
|
| 712-02 |
sacked concrete revetment
|
50   |
SQYD |
79.00 |
3,950.00 |
100.00 |
5,000.00 |
110.00 |
5,500.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
17,500.00 |
17,500.00 |
22,000.00 |
22,000.00 |
12,000.00 |
12,000.00 |
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
225   |
LNFT |
0.21 |
47.25 |
0.25 |
56.25 |
0.40 |
90.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
25.040 |
MILE |
160.00 |
4,006.40 |
350.00 |
8,764.00 |
340.00 |
8,513.60 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
27.220 |
MILE |
263.00 |
7,158.86 |
1.00 |
27.22 |
330.00 |
8,982.60 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
57.608 |
MILE |
525.00 |
30,244.20 |
1.00 |
57.60 |
570.00 |
32,836.56 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
3   |
EACH |
53.00 |
159.00 |
1.00 |
3.00 |
65.00 |
195.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
800   |
SQYD |
59.00 |
47,200.00 |
49.00 |
39,200.00 |
51.75 |
41,400.00 |
|
|
| 724-03 |
pavement joint repair
|
90.0 |
TON |
300.00 |
27,000.00 |
110.00 |
9,900.00 |
330.00 |
29,700.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
61,000.00 |
61,000.00 |
7,000.00 |
7,000.00 |
40,000.00 |
40,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
10   |
EACH |
63.00 |
630.00 |
70.00 |
700.00 |
65.00 |
650.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
75.00 |
600.00 |
80.00 |
640.00 |
75.75 |
606.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,057   |
EACH |
4.75 |
5,020.75 |
5.00 |
5,285.00 |
5.75 |
6,077.75 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
75   |
LNFT |
1.05 |
78.75 |
2.00 |
150.00 |
1.00 |
75.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
20.016 |
MILE |
1,945.00 |
38,931.12 |
1,900.00 |
38,030.40 |
2,350.00 |
47,037.60 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
9.240 |
MILE |
735.00 |
6,791.40 |
800.00 |
7,392.00 |
715.00 |
6,606.60 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
1   |
EACH |
132.00 |
132.00 |
225.00 |
225.00 |
160.00 |
160.00 |
|
|
| 735-01 |
mailboxes
|
36   |
EACH |
1.05 |
37.80 |
2.00 |
72.00 |
5.00 |
180.00 |
|
|
| 735-02 |
mailbox supports (single)
|
34   |
EACH |
125.00 |
4,250.00 |
150.00 |
5,100.00 |
130.00 |
4,420.00 |
|
|
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
185.00 |
370.00 |
200.00 |
400.00 |
175.00 |
350.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
7,500.00 |
7,500.00 |
500.00 |
500.00 |
8,500.00 |
8,500.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
17,000.00 |
17,000.00 |
50,000.00 |
50,000.00 |
27,000.00 |
27,000.00 |
|
|
| S-001 |
special guard rail anchor section
|
1   |
EACH |
1,200.00 |
1,200.00 |
1,100.00 |
1,100.00 |
1,250.00 |
1,250.00 |
|
|
| S-922 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
19,326   |
LNFT |
1.16 |
22,418.16 |
1.15 |
22,224.90 |
1.20 |
23,191.20 |
|
|
| S-923 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
5,798   |
LNFT |
1.26 |
7,305.48 |
1.30 |
7,537.40 |
1.30 |
7,537.40 |
|
|
| S-927 |
sawcuts in asphaltic concrete lifts
|
50,248   |
LNFT |
0.69 |
34,671.12 |
0.67 |
33,666.16 |
0.70 |
35,173.60 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,496,916.95 |
|
2,637,750.34 |
|
2,850,343.94 |
|
|
|