Letting of 9/14/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 860-08-0016
Parish: WEBSTER
Routes: LA 163
Description: JUNCTION LA 527 - JUNCTION LA 164 (NORTH SECTION)
Type Const: grading, drainage structures, pavement patching, superpave asphaltic concrete overlay
and related work.
 
RankLicenseBidderAmount
108584 MADDEN CONTRACTING CO., INC. $1,221,624.36
217464 BENTON & BROWN, LLC. $1,250,672.57
 
Item Number Item Description Quantity Unit of Measure - 1 -
MADDEN CONTRACTING CO., INC.
- 2 -
BENTON & BROWN, LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 4,000      CUYD 10.00 40,000.00 10.00 40,000.00        
502-01 superpave asphaltic concrete 15,315.4    TON 56.15 859,959.71 55.00 842,347.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
775.0    TON 40.00 31,000.00 55.00 42,625.00        
701-10-G reinforced concrete pipe (extension)(18") 12      LNFT 150.00 1,800.00 75.00 900.00        
701-10-I reinforced concrete pipe (extension)(24") 6      LNFT 180.00 1,080.00 85.00 510.00        
701-10-K reinforced concrete pipe (extension)(30") 36      LNFT 205.00 7,380.00 100.00 3,600.00        
701-10-M reinforced concrete pipe (extension)(36") 128      LNFT 230.00 29,440.00 120.00 15,360.00        
701-15 concrete collar 29      EACH 650.00 18,850.00 645.00 18,705.00        
711-01-D riprap (55 lb)(12" thick) 144      SQYD 55.00 7,920.00 50.00 7,200.00        
711-04 geotextile fabric 144      SQYD 2.50 360.00 1.50 216.00        
712-02 sacked concrete revetment 300      SQYD 70.00 21,000.00 55.00 16,500.00        
712-03 stone revetment 97      SQYD 48.00 4,656.00 25.00 2,425.00        
713-01 temporary signs & barricades lump      LUMP 45,000.00 45,000.00 70,000.00 70,000.00        
713-03-C temporary pavement markings (8" width) 300      LNFT 0.10 30.00 0.50 150.00        
713-03-D temporary pavement markings (12" width) 150      LNFT 0.10 15.00 0.75 112.50        
713-03-E temporary pavement markings (24" width) 210      LNFT 0.10 21.00 4.00 840.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
5.019  MILE 325.00 1,631.17 360.00 1,806.84        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
2.362  MILE 1.00 2.36 1.00 2.36        
713-05-A temporary pavement markings (solid line)(4" width) 16.672  MILE 1.00 16.67 1.00 16.67        
713-06-D temporary pavement legends and symbols (rr crossing) 2      EACH 1.00 2.00 200.00 400.00        
716-01-B mulch (fiber) 5.41   ACRE 600.00 3,246.00 750.00 4,057.50        
724-01-B pavement patching (12" minimum thickness) 630      SQYD 51.00 32,130.00 38.00 23,940.00        
727-01 mobilization lump      LUMP 45,000.00 45,000.00 70,000.00 70,000.00        
729-16-B object marker assembly (type 2) 7      EACH 65.00 455.00 80.00 560.00        
731-02 reflectorized raised pavement markers 760      EACH 4.50 3,420.00 5.00 3,800.00        
732-01-C plastic pavement striping (8" width) 300      LNFT 1.00 300.00 1.00 300.00        
732-01-D plastic pavement striping (12" width) 150      LNFT 1.50 225.00 1.50 225.00        
732-01-E plastic pavement striping (24" width) 210      LNFT 3.00 630.00 4.00 840.00        
732-02-A plastic pavement striping (solid line) (4" width) 19.025  MILE 1,850.00 35,196.25 2,500.00 47,562.50        
732-03-A plastic pavement striping (broken line)(4" width) 2.419  MILE 800.00 1,935.20 800.00 1,935.20        
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 400.00 800.00 500.00 1,000.00        
735-01 mailboxes 22      EACH 1.00 22.00 50.00 1,100.00        
735-02 mailbox supports (single) 2      EACH 175.00 350.00 140.00 280.00        
735-03 mailbox supports (double) 10      EACH 180.00 1,800.00 170.00 1,700.00        
739-01 hydro-seeding 5.41   ACRE 1,100.00 5,951.00 1,600.00 8,656.00        
740-01 construction layout lump      LUMP 10,000.00 10,000.00 16,000.00 16,000.00        
744-01 traffic control management lump      LUMP 10,000.00 10,000.00 5,000.00 5,000.00        
                       
 CONTRACTOR TOTAL       1,221,624.36   1,250,672.57        