| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - D & J CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 502-01 |
superpave asphaltic concrete
|
1,820.4 |
TON |
65.00 |
118,326.00 |
85.00 |
154,734.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
16,549   |
SQYD |
2.00 |
33,098.00 |
3.00 |
49,647.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 452   |
CUYD |
0.10 |
- 45.20 |
0.01 |
- 4.52 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
4,000.00 |
4,000.00 |
11,000.00 |
11,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
2.314 |
MILE |
188.00 |
435.03 |
175.00 |
404.95 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
9.255 |
MILE |
1.00 |
9.25 |
450.00 |
4,164.75 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
250   |
SQYD |
125.00 |
31,250.00 |
125.00 |
31,250.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
23,000.00 |
23,000.00 |
33,000.00 |
33,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
153   |
EACH |
5.00 |
765.00 |
12.00 |
1,836.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
22   |
LNFT |
3.00 |
66.00 |
25.00 |
550.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.627 |
MILE |
2,300.00 |
10,642.10 |
3,250.00 |
15,037.75 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
1,500.00 |
1,500.00 |
3,500.00 |
3,500.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
2,000.00 |
2,000.00 |
6,500.00 |
6,500.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
225,046.18 |
|
311,619.93 |
|
|
|
|
|