Letting of 9/14/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 820-09-0010
Parish: EVANGELINE
Routes: LA 1160
Description: LA 13 - LA 104
Type Const: grading, drain struct, cold planing ac, in-place cement stabilized bc, asphaltic
surface trmt, superpave ac ovly & related work.
 
RankLicenseBidderAmount
108815 W. E. MCDONALD & SON, LLC. $299,160.40
234356 PRAIRIE CONTRACTORS INC. $362,011.20
 
Item Number Item Description Quantity Unit of Measure - 1 -
W. E. MCDONALD & SON, LLC.
- 2 -
PRAIRIE CONTRACTORS INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 250      CUYD 15.00 3,750.00 18.00 4,500.00        
204-06 temporary silt fencing 4,360      LNFT 0.01 43.60 6.00 26,160.00        
303-01-B in-place cement stabilized base course (8 1/2" thick) 6,549      SQYD 10.00 65,490.00 11.00 72,039.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
50      CUYD 100.00 5,000.00 75.00 3,750.00        
502-01 superpave asphaltic concrete 1,214.0    TON 67.00 81,338.00 68.00 82,552.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
90.2    TON 80.00 7,216.00 90.00 8,118.00        
507-01-B asphaltic surface treatment (2 applications) 6,549      SQYD 5.50 36,019.50 7.50 49,117.50        
509-01 cold planing asphaltic pavement 6,327      SQYD 3.00 18,981.00 4.00 25,308.00        
509-02 contractor retained reclaimed asphaltic pavement - 308      CUYD 0.01 - 3.08 0.01 - 3.08        
701-01-I cross drain pipe (24" cmp/pcp) 68      LNFT 100.00 6,800.00 60.00 4,080.00        
713-01 temporary signs & barricades lump      LUMP 24,000.00 24,000.00 35,000.00 35,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
0.827  MILE 250.00 206.75 350.00 289.45        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
0.827  MILE 0.01 0.00 450.00 372.15        
713-05-A temporary pavement markings (solid line)(4" width) 2.186  MILE 0.01 0.02 1.00 2.18        
713-07 temporary reflectorized raised pavement markers 56      EACH 4.40 246.40 1.50 84.00        
713-07-A temporary reflectorized raised pavement markers (tabs) 56      EACH 10.00 560.00 2.00 112.00        
722-02 project site laboratory (equipped) 1      EACH 3,500.00 3,500.00 5,000.00 5,000.00        
727-01 mobilization lump      LUMP 29,000.00 29,000.00 29,300.00 29,300.00        
729-16-B object marker assembly (type 2) 2      EACH 125.00 250.00 150.50 301.00        
731-02 reflectorized raised pavement markers 58      EACH 5.40 313.20 25.00 1,450.00        
732-02-A plastic pavement striping (solid line) (4" width) 1.093  MILE 2,410.00 2,634.13 7,000.00 7,651.00        
732-03-A plastic pavement striping (broken line)(4" width) 0.413  MILE 760.00 313.88 2,000.00 826.00        
735-01 mailboxes 1      EACH 1.00 1.00 2.00 2.00        
735-02 mailbox supports (single) 1      EACH 500.00 500.00 1,000.00 1,000.00        
740-01 construction layout lump      LUMP 11,000.00 11,000.00 3,000.00 3,000.00        
744-01 traffic control management lump      LUMP 2,000.00 2,000.00 2,000.00 2,000.00        
                       
 CONTRACTOR TOTAL       299,160.40   362,011.20        