| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - RONALD ADAMS CONTRACTOR, INC. |
- 2 - RICHARD PRICE CONTRACTING CO, LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
3,000.00 |
3,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 203-01 |
general excavation
|
16,912   |
CUYD |
3.25 |
54,964.00 |
3.75 |
63,420.00 |
|
|
|
|
| 203-02 |
drainage excavation
|
3,094   |
CUYD |
2.50 |
7,735.00 |
9.00 |
27,846.00 |
|
|
|
|
| 203-04 |
embankment
|
304,869   |
CUYD |
9.75 |
2,972,472.75 |
10.16 |
3,097,469.04 |
|
|
|
|
| 203-09 |
geotextile fabric
|
12,146   |
SQYD |
1.25 |
15,182.50 |
1.10 |
13,360.60 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
100   |
EACH |
7.00 |
700.00 |
6.60 |
660.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
984   |
LNFT |
16.00 |
15,744.00 |
10.00 |
9,840.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
21   |
EACH |
100.00 |
2,100.00 |
150.00 |
3,150.00 |
|
|
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
10   |
EACH |
270.00 |
2,700.00 |
500.00 |
5,000.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
18,951   |
LNFT |
1.25 |
23,688.75 |
1.40 |
26,531.40 |
|
|
|
|
| 204-07 |
temporary stone construction entrance
|
4   |
EACH |
2,500.00 |
10,000.00 |
2,500.00 |
10,000.00 |
|
|
|
|
| 401-01 |
aggregate surface course (net section)
|
130.0 |
CUYD |
65.00 |
8,450.00 |
51.00 |
6,630.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
600.0 |
CUYD |
32.00 |
19,200.00 |
38.00 |
22,800.00 |
|
|
|
|
| 701-01-O |
cross drain pipe (48" rcp)
|
404   |
LNFT |
135.00 |
54,540.00 |
130.00 |
52,520.00 |
|
|
|
|
| 701-01-P |
cross drain pipe (54" rcp)
|
600   |
LNFT |
165.00 |
99,000.00 |
155.00 |
93,000.00 |
|
|
|
|
| 701-02-E |
cross drain pipe arch (30" equiv. rcpa)
|
140   |
LNFT |
78.00 |
10,920.00 |
81.00 |
11,340.00 |
|
|
|
|
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
106   |
LNFT |
108.00 |
11,448.00 |
102.00 |
10,812.00 |
|
|
|
|
| 701-02-H |
cross drain pipe arch (48" equiv. rcpa)
|
193   |
LNFT |
160.00 |
30,880.00 |
155.00 |
29,915.00 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
36   |
LNFT |
70.00 |
2,520.00 |
40.00 |
1,440.00 |
|
|
|
|
| 701-05-G-01 |
side drain pipe (18")(erosion)
|
280   |
LNFT |
60.00 |
16,800.00 |
32.00 |
8,960.00 |
|
|
|
|
| 703-03 |
perforated pipe underdrains
|
630   |
LNFT |
8.00 |
5,040.00 |
7.00 |
4,410.00 |
|
|
|
|
| 703-04 |
nonperforated pipe underdrains
|
210   |
LNFT |
7.50 |
1,575.00 |
8.00 |
1,680.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb, 24" thick)
|
64   |
SQYD |
50.00 |
3,200.00 |
55.00 |
3,520.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
14,000.00 |
14,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
30.64 |
ACRE |
550.00 |
16,852.00 |
545.00 |
16,698.80 |
|
|
|
|
| 717-01 |
seeding
|
920   |
LB |
7.00 |
6,440.00 |
7.00 |
6,440.00 |
|
|
|
|
| 718-01 |
fertilizer
|
30,640   |
LB |
0.40 |
12,256.00 |
0.43 |
13,175.20 |
|
|
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
1,660   |
SQYD |
1.60 |
2,656.00 |
3.00 |
4,980.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
10,000.00 |
10,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
446.0 |
CUYD |
45.00 |
20,070.00 |
30.00 |
13,380.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
290,000.00 |
290,000.00 |
253,000.00 |
253,000.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
60,000.00 |
60,000.00 |
70,000.00 |
70,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
22,000.00 |
22,000.00 |
4,500.00 |
4,500.00 |
|
|
|
|
| S-101 |
wick drains
|
69,160   |
LNFT |
0.55 |
38,038.00 |
0.53 |
36,654.80 |
|
|
|
|
| S-102 |
settlement plate installation and monitoring
|
24   |
EACH |
1,200.00 |
28,800.00 |
1,000.00 |
24,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,892,972.00 |
|
3,984,132.84 |
|
|
|
|
|