| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GREAT SOUTHERN DREDGING INC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-01 |
general excavation
|
4,899   |
CUYD |
6.00 |
29,394.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
20   |
EACH |
20.00 |
400.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
450   |
LNFT |
3.00 |
1,350.00 |
|
|
|
|
|
|
| 701-03-G |
storm drain pipe (18" cmp)
|
110   |
LNFT |
25.00 |
2,750.00 |
|
|
|
|
|
|
| 702-04-B |
adjusting catch basins
|
1   |
EACH |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
3,000.00 |
3,000.00 |
|
|
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
6,000.00 |
6,000.00 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
162   |
SQYD |
40.00 |
6,480.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
58,000.00 |
58,000.00 |
|
|
|
|
|
|
| 730-05-A |
light pole (40' mounting height, single 15' arm,ground
mount) |
2   |
EACH |
1,000.00 |
2,000.00 |
|
|
|
|
|
|
| 730-13 |
removal and disposal of light poles foundations
|
2   |
EACH |
200.00 |
400.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
1.55 |
ACRE |
1,500.00 |
2,325.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
11,000.00 |
11,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
3,000.00 |
3,000.00 |
|
|
|
|
|
|
| S-001 |
dynamic message sign unit
|
4   |
EACH |
2,500.00 |
10,000.00 |
|
|
|
|
|
|
| S-102 |
dewatering and monitoring system
|
lump |
LUMP |
24,000.00 |
24,000.00 |
|
|
|
|
|
|
| | SUBTOTAL GENERAL |
|
|
|
161,099.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
tire shred embankment option
|
|
|
|
|
|
|
|
|
|
|
| 203-04 |
embankment
|
3,769   |
CUYD |
0.00 |
0.00 |
|
|
|
|
|
|
| 203-09 |
geotextile fabric
|
13,800   |
SQYD |
0.00 |
0.00 |
|
|
|
|
|
|
| S-100 |
tire shred embankment
|
8,141   |
CUYD |
0.00 |
0.00 |
|
|
|
|
|
|
| S-101 |
stone
|
205   |
CUYD |
0.00 |
0.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
embankment option
|
|
|
|
|
|
|
|
|
|
|
| 203-04 |
embankment
|
11,910   |
CUYD |
14.00 |
166,740.00 |
|
|
|
|
|
|
| S-103 |
permanent underdrain system
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| | SUBTOTAL ALT A2 |
|
|
|
176,740.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
337,839.00 |
|
|
|
|
|
|
|