| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - COASTAL BRIDGE CO., L.L.C. |
- 3 - BARBER BROS. CONTRACTING CO., L.L.C |
- 4 - BARRIERE CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
940   |
LNFT |
4.00 |
3,760.00 |
5.00 |
4,700.00 |
6.50 |
6,110.00 |
4.00 |
3,760.00 |
| 203-08 |
borrow (vehicular measurement)
|
2,177   |
CUYD |
17.00 |
37,009.00 |
1.00 |
2,177.00 |
15.00 |
32,655.00 |
14.50 |
31,566.50 |
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
EACH |
100.00 |
1,200.00 |
100.00 |
1,200.00 |
200.00 |
2,400.00 |
110.00 |
1,320.00 |
| 204-06 |
temporary silt fencing
|
5,100   |
LNFT |
1.35 |
6,885.00 |
0.55 |
2,805.00 |
1.50 |
7,650.00 |
1.40 |
7,140.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
200   |
CUYD |
29.00 |
5,800.00 |
30.00 |
6,000.00 |
40.00 |
8,000.00 |
61.00 |
12,200.00 |
| 502-01 |
superpave asphaltic concrete
|
22,782.1 |
TON |
46.40 |
1,057,089.44 |
53.50 |
1,218,842.35 |
48.00 |
1,093,540.80 |
56.00 |
1,275,797.60 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
miscellaneous |
2,265.6 |
TON |
105.00 |
237,888.00 |
1.00 |
2,265.60 |
75.00 |
169,920.00 |
1.00 |
2,265.60 |
| 509-01 |
cold planing asphaltic pavement
|
113,618   |
SQYD |
1.19 |
135,205.42 |
2.80 |
318,130.40 |
1.25 |
142,022.50 |
1.80 |
204,512.40 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,367   |
CUYD |
0.10 |
- 236.70 |
1.00 |
- 2,367.00 |
FREE |
FREE |
10.00 |
- 23,670.00 |
| 701-02-I |
cross drain pipe arch (54" equiv cmpa)
|
24   |
LNFT |
160.00 |
3,840.00 |
200.00 |
4,800.00 |
400.00 |
9,600.00 |
190.00 |
4,560.00 |
| 701-02-J |
cross drain pipe arch (60" equiv rcpa)
|
56   |
LNFT |
310.00 |
17,360.00 |
350.00 |
19,600.00 |
300.00 |
16,800.00 |
300.00 |
16,800.00 |
| 701-08 |
relaying pipe
|
8   |
LNFT |
104.00 |
832.00 |
75.00 |
600.00 |
500.00 |
4,000.00 |
140.00 |
1,120.00 |
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
4   |
LNFT |
135.00 |
540.00 |
500.00 |
2,000.00 |
500.00 |
2,000.00 |
270.00 |
1,080.00 |
| 701-15 |
concrete collar
|
4   |
EACH |
674.00 |
2,696.00 |
2,000.00 |
8,000.00 |
750.00 |
3,000.00 |
1,200.00 |
4,800.00 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
200.0 |
LNFT |
37.00 |
7,400.00 |
31.00 |
6,200.00 |
40.00 |
8,000.00 |
52.00 |
10,400.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
308.0 |
LNFT |
47.00 |
14,476.00 |
45.00 |
13,860.00 |
55.00 |
16,940.00 |
37.00 |
11,396.00 |
| 704-03 |
blocked out guard rail
|
125.0 |
LNFT |
17.00 |
2,125.00 |
16.00 |
2,000.00 |
20.00 |
2,500.00 |
18.00 |
2,250.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
8   |
EACH |
2,300.00 |
18,400.00 |
2,200.00 |
17,600.00 |
2,500.00 |
20,000.00 |
2,100.00 |
16,800.00 |
| 711-03-C |
riprap (30 lb)
|
263.3 |
TON |
67.00 |
17,641.10 |
45.00 |
11,848.50 |
75.00 |
19,747.50 |
62.00 |
16,324.60 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
45,000.00 |
45,000.00 |
50,000.00 |
50,000.00 |
34,000.00 |
34,000.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
21.810 |
MILE |
130.00 |
2,835.30 |
300.00 |
6,543.00 |
325.00 |
7,088.25 |
150.00 |
3,271.50 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.720 |
MILE |
259.00 |
963.48 |
320.00 |
1,190.40 |
300.00 |
1,116.00 |
320.00 |
1,190.40 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
81.360 |
MILE |
500.00 |
40,680.00 |
1.00 |
81.36 |
400.00 |
32,544.00 |
40.00 |
3,254.40 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
2,000   |
SQYD |
68.00 |
136,000.00 |
20.00 |
40,000.00 |
60.00 |
120,000.00 |
55.00 |
110,000.00 |
| 726-01 |
bedding material
|
30.6 |
CUYD |
68.00 |
2,080.80 |
65.00 |
1,989.00 |
40.00 |
1,224.00 |
52.00 |
1,591.20 |
| 727-01 |
mobilization
|
lump |
LUMP |
50,000.00 |
50,000.00 |
120,000.00 |
120,000.00 |
95,000.00 |
95,000.00 |
180,000.00 |
180,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
67.00 |
536.00 |
75.00 |
600.00 |
75.00 |
600.00 |
80.00 |
640.00 |
| 731-02 |
reflectorized raised pavement markers
|
3,729   |
EACH |
5.00 |
18,645.00 |
5.00 |
18,645.00 |
5.50 |
20,509.50 |
5.00 |
18,645.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
27.120 |
MILE |
2,000.00 |
54,240.00 |
2,000.00 |
54,240.00 |
2,400.00 |
65,088.00 |
2,000.00 |
54,240.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.240 |
MILE |
780.00 |
967.20 |
700.00 |
868.00 |
900.00 |
1,116.00 |
700.00 |
868.00 |
| 735-01 |
mailboxes
|
231   |
EACH |
15.00 |
3,465.00 |
1.00 |
231.00 |
2.00 |
462.00 |
5.00 |
1,155.00 |
| 735-02 |
mailbox supports (single)
|
231   |
EACH |
150.00 |
34,650.00 |
125.00 |
28,875.00 |
135.00 |
31,185.00 |
110.00 |
25,410.00 |
| 739-01 |
hydro-seeding
|
4.41 |
ACRE |
1,000.00 |
4,410.00 |
900.00 |
3,969.00 |
1,500.00 |
6,615.00 |
1,000.00 |
4,410.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
40,000.00 |
40,000.00 |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
31,000.00 |
31,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
17,000.00 |
17,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
70,000.00 |
70,000.00 |
| S-001 |
u-channel post installation
|
101   |
each |
62.00 |
6,262.00 |
50.00 |
5,050.00 |
70.00 |
7,070.00 |
59.00 |
5,959.00 |
| S-002 |
cleaning existing ditches
|
100   |
LNFT |
11.00 |
1,100.00 |
10.00 |
1,000.00 |
15.00 |
1,500.00 |
11.00 |
1,100.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,993,745.04 |
|
1,998,543.61 |
|
2,046,003.55 |
|
2,147,157.20 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
940   |
LNFT |
3.00 |
2,820.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
2,177   |
CUYD |
15.00 |
32,655.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
EACH |
120.00 |
1,440.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
5,100   |
LNFT |
1.15 |
5,865.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
200   |
CUYD |
50.00 |
10,000.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
22,782.1 |
TON |
40.00 |
911,284.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
miscellaneous |
2,265.6 |
TON |
40.00 |
90,624.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
113,618   |
SQYD |
1.50 |
170,427.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,367   |
CUYD |
0.10 |
- 236.70 |
|
|
|
|
|
|
| 701-02-I |
cross drain pipe arch (54" equiv cmpa)
|
24   |
LNFT |
200.00 |
4,800.00 |
|
|
|
|
|
|
| 701-02-J |
cross drain pipe arch (60" equiv rcpa)
|
56   |
LNFT |
250.00 |
14,000.00 |
|
|
|
|
|
|
| 701-08 |
relaying pipe
|
8   |
LNFT |
125.00 |
1,000.00 |
|
|
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
4   |
LNFT |
150.00 |
600.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
4   |
EACH |
850.00 |
3,400.00 |
|
|
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
200.0 |
LNFT |
31.00 |
6,200.00 |
|
|
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
308.0 |
LNFT |
45.00 |
13,860.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
125.0 |
LNFT |
16.00 |
2,000.00 |
|
|
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
8   |
EACH |
2,200.00 |
17,600.00 |
|
|
|
|
|
|
| 711-03-C |
riprap (30 lb)
|
263.3 |
TON |
45.00 |
11,848.50 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
200,000.00 |
200,000.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
21.810 |
MILE |
400.00 |
8,724.00 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.720 |
MILE |
100.00 |
372.00 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
81.360 |
MILE |
200.00 |
16,272.00 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
2,000   |
SQYD |
70.00 |
140,000.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
30.6 |
CUYD |
60.00 |
1,836.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
210,000.00 |
210,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
75.00 |
600.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
3,729   |
EACH |
6.00 |
22,374.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
27.120 |
MILE |
2,300.00 |
62,376.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.240 |
MILE |
800.00 |
992.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
231   |
EACH |
1.00 |
231.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
231   |
EACH |
150.00 |
34,650.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
4.41 |
ACRE |
1,400.00 |
6,174.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
65,000.00 |
65,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
72,400.00 |
72,400.00 |
|
|
|
|
|
|
| S-001 |
u-channel post installation
|
101   |
each |
65.00 |
6,565.00 |
|
|
|
|
|
|
| S-002 |
cleaning existing ditches
|
100   |
LNFT |
12.00 |
1,200.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,149,952.80 |
|
|
|
|
|
|
|