Letting of 9/14/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 203-03-0016
Parish: EVANGELINE
Routes: LA 29
Description: C.S.L.M. 7.30 - ST LANDRY PARISH LINE
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete pavement,
and related work.
 
RankLicenseBidderAmount
108815 W. E. MCDONALD & SON, LLC. $1,083,786.61
212312 GILCHRIST CONSTRUCTION CO. LLC $1,204,187.13
334356 PRAIRIE CONTRACTORS INC. $1,215,122.79
404089 H & S CONSTRUCTION CO., INC. $1,316,384.58
 
Item Number Item Description Quantity Unit of Measure - 1 -
W. E. MCDONALD & SON, LLC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
PRAIRIE CONTRACTORS INC.
- 4 -
H & S CONSTRUCTION CO., INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 657      LNFT 3.00 1,971.00 5.00 3,285.00 6.00 3,942.00 3.00 1,971.00
203-08 borrow (vehicular measurement) 630      CUYD 10.00 6,300.00 17.00 10,710.00 18.00 11,340.00 12.00 7,560.00
203-08-A borrow (vehicular meas.)(selected soils) 333      CUYD 10.00 3,330.00 20.00 6,660.00 17.50 5,827.50 12.00 3,996.00
302-02-E-01 class ii base course (4" thick)(stone) 31,297.1    SQYD 9.50 297,322.45 8.50 266,025.35 7.50 234,728.25 11.10 347,397.81
303-01-C in-place cement stabilized base course (10" thick) 31,677      SQYD 8.00 253,416.00 9.00 285,093.00 8.80 278,757.60 8.00 253,416.00
303-02 removal of existing patches 1,500      SQYD 20.00 30,000.00 11.50 17,250.00 21.50 32,250.00 30.00 45,000.00
401-02 aggregate surface course (adjusted vehicular
measurement)
15      CUYD 125.00 1,875.00 65.00 975.00 200.00 3,000.00 70.00 1,050.00
402-01 traffic maintenance aggregate (vehicular measurement) 13.6    CUYD 125.00 1,700.00 65.00 884.00 200.00 2,720.00 50.00 680.00
502-01 superpave asphaltic concrete 5,725.8    TON 58.75 336,390.75 60.00 343,548.00 60.33 345,437.51 72.00 412,257.60
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
158.7    TON 66.75 10,593.22 110.00 17,457.00 80.00 12,696.00 90.00 14,283.00
509-01 cold planing asphaltic pavement 28,411      SQYD 1.85 52,560.35 3.00 85,233.00 3.10 88,074.10 2.00 56,822.00
509-02 contractor retained reclaimed asphaltic pavement - 1,977      CUYD 0.01 - 19.77 1.00 - 1,977.00 0.01 - 19.77 0.01 - 19.77
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 400.0    LNFT 28.00 11,200.00 30.00 12,000.00 30.00 12,000.00 32.20 12,880.00
704-03 blocked out guard rail 175.0    LNFT 16.50 2,887.50 17.00 2,975.00 17.00 2,975.00 19.00 3,325.00
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 40.00 4,000.00 45.00 4,500.00 45.00 4,500.00 46.00 4,600.00
704-11-A guard rail end treatment (flared) 4      EACH 1,850.00 7,400.00 2,000.00 8,000.00 2,000.00 8,000.00 2,128.00 8,512.00
713-01 temporary signs & barricades lump      LUMP 9,000.00 9,000.00 30,000.00 30,000.00 11,000.00 11,000.00 40,000.00 40,000.00
713-03-E temporary pavement markings (24" width) 792      LNFT 0.60 475.20 0.70 554.40 1.00 792.00 2.90 2,296.80
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
3.012  MILE 200.00 602.40 280.00 843.36 350.00 1,054.20 350.00 1,054.20
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
2.782  MILE 0.01 0.02 280.00 778.96 350.00 973.70 415.00 1,154.53
713-05-A temporary pavement markings (solid line)(4" width) 6.188  MILE 0.01 0.06 580.00 3,589.04 600.00 3,712.80 843.00 5,216.48
713-07 temporary reflectorized raised pavement markers 378      EACH 2.00 756.00 3.40 1,285.20 6.00 2,268.00 3.00 1,134.00
722-02 project site laboratory (equipped) 1      EACH 4,500.00 4,500.00 6,000.00 6,000.00 6,000.00 6,000.00 5,000.00 5,000.00
727-01 mobilization lump      LUMP 23,000.00 23,000.00 50,000.00 50,000.00 114,000.00 114,000.00 50,000.00 50,000.00
729-16-C object marker assembly (type 3) 8      EACH 65.00 520.00 85.00 680.00 100.00 800.00 74.80 598.40
731-02 reflectorized raised pavement markers 378      EACH 4.50 1,701.00 4.80 1,814.40 6.00 2,268.00 6.00 2,268.00
732-01-E plastic pavement striping (24" width) 396      LNFT 3.00 1,188.00 3.25 1,287.00 4.00 1,584.00 2.90 1,148.40
732-02-A plastic pavement striping (solid line) (4" width) 3.094  MILE 2,221.00 6,871.77 2,200.00 6,806.80 2,350.00 7,270.90 2,555.00 7,905.17
732-03-A plastic pavement striping (broken line)(4" width) 1.391  MILE 760.00 1,057.16 875.00 1,217.12 1,000.00 1,391.00 874.00 1,215.73
732-05 removal of existing markings 0.045  MILE 4,900.00 220.50 2,500.00 112.50 4,000.00 180.00 5,534.00 249.03
740-01 construction layout lump      LUMP 8,000.00 8,000.00 13,000.00 13,000.00 5,000.00 5,000.00 10,000.00 10,000.00
744-01 traffic control management lump      LUMP 2,000.00 2,000.00 20,000.00 20,000.00 3,000.00 3,000.00 10,000.00 10,000.00
S-001 rumble strips (ground-in) 0.4    MILE 7,420.00 2,968.00 9,000.00 3,600.00 19,000.00 7,600.00 8,533.00 3,413.20
                       
 CONTRACTOR TOTAL       1,083,786.61   1,204,187.13   1,215,122.79   1,316,384.58