| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - PRAIRIE CONTRACTORS INC. |
- 4 - H & S CONSTRUCTION CO., INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
657   |
LNFT |
3.00 |
1,971.00 |
5.00 |
3,285.00 |
6.00 |
3,942.00 |
3.00 |
1,971.00 |
| 203-08 |
borrow (vehicular measurement)
|
630   |
CUYD |
10.00 |
6,300.00 |
17.00 |
10,710.00 |
18.00 |
11,340.00 |
12.00 |
7,560.00 |
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
333   |
CUYD |
10.00 |
3,330.00 |
20.00 |
6,660.00 |
17.50 |
5,827.50 |
12.00 |
3,996.00 |
| 302-02-E-01 |
class ii base course (4" thick)(stone)
|
31,297.1 |
SQYD |
9.50 |
297,322.45 |
8.50 |
266,025.35 |
7.50 |
234,728.25 |
11.10 |
347,397.81 |
| 303-01-C |
in-place cement stabilized base course (10" thick)
|
31,677   |
SQYD |
8.00 |
253,416.00 |
9.00 |
285,093.00 |
8.80 |
278,757.60 |
8.00 |
253,416.00 |
| 303-02 |
removal of existing patches
|
1,500   |
SQYD |
20.00 |
30,000.00 |
11.50 |
17,250.00 |
21.50 |
32,250.00 |
30.00 |
45,000.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
15   |
CUYD |
125.00 |
1,875.00 |
65.00 |
975.00 |
200.00 |
3,000.00 |
70.00 |
1,050.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
13.6 |
CUYD |
125.00 |
1,700.00 |
65.00 |
884.00 |
200.00 |
2,720.00 |
50.00 |
680.00 |
| 502-01 |
superpave asphaltic concrete
|
5,725.8 |
TON |
58.75 |
336,390.75 |
60.00 |
343,548.00 |
60.33 |
345,437.51 |
72.00 |
412,257.60 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
158.7 |
TON |
66.75 |
10,593.22 |
110.00 |
17,457.00 |
80.00 |
12,696.00 |
90.00 |
14,283.00 |
| 509-01 |
cold planing asphaltic pavement
|
28,411   |
SQYD |
1.85 |
52,560.35 |
3.00 |
85,233.00 |
3.10 |
88,074.10 |
2.00 |
56,822.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,977   |
CUYD |
0.01 |
- 19.77 |
1.00 |
- 1,977.00 |
0.01 |
- 19.77 |
0.01 |
- 19.77 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
400.0 |
LNFT |
28.00 |
11,200.00 |
30.00 |
12,000.00 |
30.00 |
12,000.00 |
32.20 |
12,880.00 |
| 704-03 |
blocked out guard rail
|
175.0 |
LNFT |
16.50 |
2,887.50 |
17.00 |
2,975.00 |
17.00 |
2,975.00 |
19.00 |
3,325.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
40.00 |
4,000.00 |
45.00 |
4,500.00 |
45.00 |
4,500.00 |
46.00 |
4,600.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
1,850.00 |
7,400.00 |
2,000.00 |
8,000.00 |
2,000.00 |
8,000.00 |
2,128.00 |
8,512.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
9,000.00 |
9,000.00 |
30,000.00 |
30,000.00 |
11,000.00 |
11,000.00 |
40,000.00 |
40,000.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
792   |
LNFT |
0.60 |
475.20 |
0.70 |
554.40 |
1.00 |
792.00 |
2.90 |
2,296.80 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.012 |
MILE |
200.00 |
602.40 |
280.00 |
843.36 |
350.00 |
1,054.20 |
350.00 |
1,054.20 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.782 |
MILE |
0.01 |
0.02 |
280.00 |
778.96 |
350.00 |
973.70 |
415.00 |
1,154.53 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
6.188 |
MILE |
0.01 |
0.06 |
580.00 |
3,589.04 |
600.00 |
3,712.80 |
843.00 |
5,216.48 |
| 713-07 |
temporary reflectorized raised pavement markers
|
378   |
EACH |
2.00 |
756.00 |
3.40 |
1,285.20 |
6.00 |
2,268.00 |
3.00 |
1,134.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
4,500.00 |
4,500.00 |
6,000.00 |
6,000.00 |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
23,000.00 |
23,000.00 |
50,000.00 |
50,000.00 |
114,000.00 |
114,000.00 |
50,000.00 |
50,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
65.00 |
520.00 |
85.00 |
680.00 |
100.00 |
800.00 |
74.80 |
598.40 |
| 731-02 |
reflectorized raised pavement markers
|
378   |
EACH |
4.50 |
1,701.00 |
4.80 |
1,814.40 |
6.00 |
2,268.00 |
6.00 |
2,268.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
396   |
LNFT |
3.00 |
1,188.00 |
3.25 |
1,287.00 |
4.00 |
1,584.00 |
2.90 |
1,148.40 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.094 |
MILE |
2,221.00 |
6,871.77 |
2,200.00 |
6,806.80 |
2,350.00 |
7,270.90 |
2,555.00 |
7,905.17 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.391 |
MILE |
760.00 |
1,057.16 |
875.00 |
1,217.12 |
1,000.00 |
1,391.00 |
874.00 |
1,215.73 |
| 732-05 |
removal of existing markings
|
0.045 |
MILE |
4,900.00 |
220.50 |
2,500.00 |
112.50 |
4,000.00 |
180.00 |
5,534.00 |
249.03 |
| 740-01 |
construction layout
|
lump |
LUMP |
8,000.00 |
8,000.00 |
13,000.00 |
13,000.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
2,000.00 |
2,000.00 |
20,000.00 |
20,000.00 |
3,000.00 |
3,000.00 |
10,000.00 |
10,000.00 |
| S-001 |
rumble strips (ground-in)
|
0.4 |
MILE |
7,420.00 |
2,968.00 |
9,000.00 |
3,600.00 |
19,000.00 |
7,600.00 |
8,533.00 |
3,413.20 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,083,786.61 |
|
1,204,187.13 |
|
1,215,122.79 |
|
1,316,384.58 |
|