Letting of 9/14/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 072-01-0020
Parish: CLAIBORNE
Routes: LA 9
Description: ANTIOCH-SUMMERFIELD HIGHWAY
Type Const: cold planing asphaltic pavement, pavement patching, superpave asphaltic concrete
overlay, and related work.
 
RankLicenseBidderAmount
108584 MADDEN CONTRACTING CO., INC. $1,830,724.23
 
Item Number Item Description Quantity Unit of Measure - 1 -
MADDEN CONTRACTING CO., INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks and drives 72      SQYD 35.00 2,520.00            
203-08 borrow (vehicular measurement) 5,000      CUYD 8.10 40,500.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
300      CUYD 10.00 3,000.00            
502-01 superpave asphaltic concrete 20,620.7    TON 58.80 1,212,497.16            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
489.0    TON 48.00 23,472.00            
509-01 cold planing asphaltic pavement 90,818      SQYD 1.53 138,951.54            
509-02 contractor retained reclaimed asphaltic pavement - 2,500      CUYD 0.10 - 250.00            
701-15 concrete collar 3      EACH 650.00 1,950.00            
711-01-D riprap (55 lb, 18" thick) 300      SQYD 82.50 24,750.00            
711-04 geotextile fabric 300      SQYD 2.50 750.00            
712-02 sacked concrete revetment 50      SQYD 70.00 3,500.00            
713-01 temporary signs & barricades lump      LUMP 76,200.00 76,200.00            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
14.340  MILE 325.00 4,660.50            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
4.350  MILE 1.00 4.35            
713-05-A temporary pavement markings (solid line)(4" width) 49.180  MILE 1.00 49.18            
716-01-B mulch (fiber) 17.00   ACRE 660.00 11,220.00            
724-01-A pavement patching (6" minimum thickness) 2,480      SQYD 29.10 72,168.00            
724-01-B pavement patching (12" minimum thickness) 785      SQYD 44.60 35,011.00            
727-01 mobilization lump      LUMP 76,200.00 76,200.00            
731-02 reflectorized raised pavement markers 915      EACH 4.50 4,117.50            
732-02-A plastic pavement striping (solid line) (4" width) 24.590  MILE 1,850.00 45,491.50            
732-03-A plastic pavement striping (broken line)(4" width) 2.174  MILE 750.00 1,630.50            
735-01 mailboxes 11      EACH 1.00 11.00            
735-01-A mailboxes (large) 2      EACH 50.00 100.00            
735-02 mailbox supports (single) 13      EACH 150.00 1,950.00            
739-01 hydro-seeding 17.00   ACRE 1,210.00 20,570.00            
740-01 construction layout lump      LUMP 19,700.00 19,700.00            
744-01 traffic control management lump      LUMP 10,000.00 10,000.00            
                       
 CONTRACTOR TOTAL       1,830,724.23            