| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - W. E. MCDONALD & SON, LLC. |
- 3 - JAMES CONSTRUCTION GROUP LLC |
- 4 - GUINN BROTHERS, LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
150,000.00 |
150,000.00 |
170,000.00 |
170,000.00 |
385,000.00 |
385,000.00 |
225,000.00 |
225,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
10,000.00 |
10,000.00 |
50,000.00 |
50,000.00 |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
| 202-02-A-01 |
removal of bridge (sta. 10+657.55; 7.75 m x 58.20 m
timber bridge) |
1   |
ea |
22,000.00 |
22,000.00 |
27,000.00 |
27,000.00 |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
| 202-02-A-02 |
removal of bridge (sta. 20+317.66; 7.14 m x 23.80 m
timber bridge) |
1   |
ea |
8,500.00 |
8,500.00 |
17,000.00 |
17,000.00 |
6,000.00 |
6,000.00 |
9,000.00 |
9,000.00 |
| 202-02-A-03 |
removal of bridge (sta. 20+430.00; 7.10 m x 34.40 m
timber bridge) |
1   |
ea |
25,000.00 |
25,000.00 |
22,000.00 |
22,000.00 |
9,000.00 |
9,000.00 |
12,000.00 |
12,000.00 |
| 202-02-A-04 |
removal of bridge (sta. 40+307.88; 8.53 m x 46.60 m
precast concrete bridge ) |
1   |
ea |
25,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
13,000.00 |
13,000.00 |
25,000.00 |
25,000.00 |
| 202-02-A-05 |
removal of bridge (sta. 40+408.65; 7.00 m x 75.59 m
timber bridge) |
1   |
ea |
30,000.00 |
30,000.00 |
32,000.00 |
32,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
| 202-02-A-06 |
removal of bridge (sta. 40+791.26; 7.01 m x 99.10 m
timber bridge) |
1   |
ea |
40,000.00 |
40,000.00 |
42,000.00 |
42,000.00 |
28,000.00 |
28,000.00 |
30,000.00 |
30,000.00 |
| 202-02-A-07 |
removal of bridge (sta. 10+559.79; 7.68 m x 23.80 m
timber bridge) |
1   |
ea |
8,500.00 |
8,500.00 |
17,000.00 |
17,000.00 |
7,000.00 |
7,000.00 |
9,000.00 |
9,000.00 |
| 202-02-A-08 |
removal of bridge (sta. 11+290.89; 7.68 m x 12.30 m
timber bridge) |
1   |
ea |
8,500.00 |
8,500.00 |
17,000.00 |
17,000.00 |
5,000.00 |
5,000.00 |
8,000.00 |
8,000.00 |
| 202-02-A-09 |
removal of bridge (sta. 30+303.63; 7.76 m x 17.80 m
timber bridge) |
1   |
ea |
8,500.00 |
8,500.00 |
17,000.00 |
17,000.00 |
6,000.00 |
6,000.00 |
7,500.00 |
7,500.00 |
| 202-02-D |
removal of concrete walks & drives
|
121   |
sq m |
8.00 |
968.00 |
10.00 |
1,210.00 |
10.00 |
1,210.00 |
10.00 |
1,210.00 |
| 202-02-I |
removal of base and surfacing
|
13,762   |
sq m |
5.00 |
68,810.00 |
8.00 |
110,096.00 |
3.50 |
48,167.00 |
3.00 |
41,286.00 |
| 202-02-J |
removal of 6m x 18m wood and tin building (lt. of sta.
40+186.97) |
1   |
ea |
5,000.00 |
5,000.00 |
9,000.00 |
9,000.00 |
3,000.00 |
3,000.00 |
5,000.00 |
5,000.00 |
| 202-02-K |
removal of aband.underground storage tanks, pump
island, noncontaminated soils and fluids(parcel 11-1,approx. 40+198) |
lump |
lump |
35,000.00 |
35,000.00 |
40,000.00 |
40,000.00 |
3,500.00 |
3,500.00 |
40,000.00 |
40,000.00 |
| 203-01 |
general excavation
|
17,959   |
cu m |
7.50 |
134,692.50 |
6.00 |
107,754.00 |
5.00 |
89,795.00 |
5.00 |
89,795.00 |
| 203-02 |
drainage excavation
|
19,150   |
cu m |
8.25 |
157,987.50 |
7.00 |
134,050.00 |
8.00 |
153,200.00 |
6.00 |
114,900.00 |
| 203-03 |
muck excavation
|
332   |
cu m |
15.00 |
4,980.00 |
20.00 |
6,640.00 |
20.00 |
6,640.00 |
10.00 |
3,320.00 |
| 203-04 |
embankment
|
31,199   |
cu m |
15.00 |
467,985.00 |
8.00 |
249,592.00 |
10.00 |
311,990.00 |
9.00 |
280,791.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
16   |
ea |
100.00 |
1,600.00 |
70.00 |
1,120.00 |
115.00 |
1,840.00 |
100.00 |
1,600.00 |
| 204-06 |
temporary silt fencing
|
3,000   |
ln m |
2.00 |
6,000.00 |
6.00 |
18,000.00 |
4.20 |
12,600.00 |
6.00 |
18,000.00 |
| 302-01 |
class ii base course
|
5,556.3 |
cu m |
90.00 |
500,067.00 |
65.00 |
361,159.50 |
85.00 |
472,285.50 |
80.00 |
444,504.00 |
| 304-01 |
lime
|
83.16 |
Mg |
150.00 |
12,474.00 |
200.00 |
16,632.00 |
140.00 |
11,642.40 |
135.00 |
11,226.60 |
| 304-04-D |
lime treatment (type d) (300 mm thick)
|
5,500   |
sq m |
5.00 |
27,500.00 |
4.00 |
22,000.00 |
1.50 |
8,250.00 |
2.50 |
13,750.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
24   |
cu m |
100.00 |
2,400.00 |
100.00 |
2,400.00 |
75.00 |
1,800.00 |
100.00 |
2,400.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
400.0 |
cu m |
50.00 |
20,000.00 |
30.00 |
12,000.00 |
35.00 |
14,000.00 |
40.00 |
16,000.00 |
| 502-01 |
superpave asphaltic concrete
|
9,068.2 |
Mg |
75.00 |
680,115.00 |
73.00 |
661,978.60 |
75.00 |
680,115.00 |
81.00 |
734,524.20 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
7.0 |
Mg |
150.00 |
1,050.00 |
225.00 |
1,575.00 |
250.00 |
1,750.00 |
500.00 |
3,500.00 |
| 509-01 |
cold planing asphaltic pavement
|
478   |
sq m |
12.00 |
5,736.00 |
10.00 |
4,780.00 |
6.00 |
2,868.00 |
50.00 |
23,900.00 |
| 509-02 |
contractor retained reclaimed asphalt pavement
|
- 6   |
cu m |
1.00 |
- 6.00 |
0.01 |
- 0.06 |
0.01 |
- 0.06 |
1.00 |
- 6.00 |
| 701-01-I/M |
cross drain pipe (600 mm rcp/pcp or 900 mm cmp)
|
27.0 |
ln m |
225.00 |
6,075.00 |
190.00 |
5,130.00 |
250.00 |
6,750.00 |
105.00 |
2,835.00 |
| 701-01-P/Q |
cross drain pipe (1350 mm rcp/pcp or 1500 mm cmp)
|
128.5 |
ln m |
550.00 |
70,675.00 |
450.00 |
57,825.00 |
500.00 |
64,250.00 |
350.00 |
44,975.00 |
| 701-01-S/U |
cross drain pipe (1800 mm rcp/pcp or 2100 mm cmp)
|
99.0 |
ln m |
950.00 |
94,050.00 |
800.00 |
79,200.00 |
750.00 |
74,250.00 |
465.00 |
46,035.00 |
| 701-02-J/L |
cross drain pipe arch (1500 mm equiv. rcpa or 1800 mm
equiv. cmpa) |
102.0 |
ln m |
675.00 |
68,850.00 |
650.00 |
66,300.00 |
600.00 |
61,200.00 |
415.00 |
42,330.00 |
| 701-05-G |
side drain pipe (450 mm)
|
22.5 |
ln m |
200.00 |
4,500.00 |
150.00 |
3,375.00 |
145.00 |
3,262.50 |
75.00 |
1,687.50 |
| 701-05-I |
side drain pipe (600 mm)
|
22.5 |
ln m |
250.00 |
5,625.00 |
180.00 |
4,050.00 |
165.00 |
3,712.50 |
135.00 |
3,037.50 |
| 702-05-A |
cross drain end treatment (1x600 mm rcp or 900 mm cmp)
|
2   |
ea |
2,500.00 |
5,000.00 |
1,800.00 |
3,600.00 |
1,200.00 |
2,400.00 |
2,000.00 |
4,000.00 |
| 702-05-B |
cross drain end treatment (1x1350 mm rcp or 1500 mm
cmp) |
2   |
ea |
3,500.00 |
7,000.00 |
2,200.00 |
4,400.00 |
2,300.00 |
4,600.00 |
2,000.00 |
4,000.00 |
| 702-05-C |
cross drain end treatment (3x1350 mm rcp or 1500 mm
cmp) |
2   |
ea |
3,500.00 |
7,000.00 |
2,600.00 |
5,200.00 |
4,700.00 |
9,400.00 |
3,000.00 |
6,000.00 |
| 702-05-D |
cross drain end treatment (4x1500 mm eq rcp or 1800 mm
eq cmpa) |
2   |
ea |
9,000.00 |
18,000.00 |
6,800.00 |
13,600.00 |
5,000.00 |
10,000.00 |
4,500.00 |
9,000.00 |
| 702-05-E |
cross drain end treatment (1x1800 mm rcp or 2100 mm
cmp) |
2   |
ea |
6,500.00 |
13,000.00 |
3,800.00 |
7,600.00 |
3,500.00 |
7,000.00 |
2,800.00 |
5,600.00 |
| 702-05-F |
cross drain end treatment (2x1800 mm rcp or 2100 mm
cmp) |
2   |
ea |
8,000.00 |
16,000.00 |
6,000.00 |
12,000.00 |
4,700.00 |
9,400.00 |
4,000.00 |
8,000.00 |
| 704-03 |
blocked out guard rail
|
518.16 |
ln m |
55.00 |
28,498.80 |
49.22 |
25,503.83 |
65.00 |
33,680.40 |
55.00 |
28,498.80 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
152.40 |
ln m |
200.00 |
30,480.00 |
170.00 |
25,908.00 |
155.00 |
23,622.00 |
185.00 |
28,194.00 |
| 704-11-A |
guard rail end treatment (flared)
|
16   |
ea |
2,000.00 |
32,000.00 |
1,800.00 |
28,800.00 |
2,150.00 |
34,400.00 |
2,200.00 |
35,200.00 |
| 705-01 |
barbed wire fence
|
2,826   |
ln m |
17.50 |
49,455.00 |
16.27 |
45,979.02 |
16.00 |
45,216.00 |
16.00 |
45,216.00 |
| 706-02-C |
concrete drive (150 mm thick)
|
74.3 |
sq m |
60.00 |
4,458.00 |
65.00 |
4,829.50 |
55.00 |
4,086.50 |
50.00 |
3,715.00 |
| 708-01 |
right-of-way monument
|
81   |
ea |
300.00 |
24,300.00 |
150.00 |
12,150.00 |
100.00 |
8,100.00 |
150.00 |
12,150.00 |
| 708-02 |
right-of-way monument witness post
|
81   |
ea |
300.00 |
24,300.00 |
150.00 |
12,150.00 |
100.00 |
8,100.00 |
150.00 |
12,150.00 |
| 712-04 |
flexible revetment
|
2,798   |
sq m |
60.00 |
167,880.00 |
54.00 |
151,092.00 |
45.00 |
125,910.00 |
45.00 |
125,910.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
100,000.00 |
100,000.00 |
175,000.00 |
175,000.00 |
50,000.00 |
50,000.00 |
100,000.00 |
100,000.00 |
| 713-04-A |
temporary pavement markings (broken line)(100 mm w)
(1.2 m length) |
2.580 |
km |
800.00 |
2,064.00 |
250.00 |
645.00 |
350.00 |
903.00 |
FREE |
FREE |
| 713-05-A |
temporary pavement markings (solid line)(100 mm width)
|
16.762 |
km |
500.00 |
8,381.00 |
300.00 |
5,028.60 |
300.00 |
5,028.60 |
550.00 |
9,219.10 |
| 713-07 |
temporary reflectorized raised pavement markers
|
275   |
ea |
2.00 |
550.00 |
1.50 |
412.50 |
6.00 |
1,650.00 |
7.50 |
2,062.50 |
| 716-01-A |
mulch (vegetative)
|
7.3 |
hctr |
1,500.00 |
10,950.00 |
1,380.00 |
10,074.00 |
1,700.00 |
12,410.00 |
3,000.00 |
21,900.00 |
| 717-01 |
seeding
|
490   |
kg |
15.00 |
7,350.00 |
13.48 |
6,605.20 |
15.00 |
7,350.00 |
15.00 |
7,350.00 |
| 718-01 |
fertilizer
|
16,322   |
kg |
0.65 |
10,609.30 |
0.60 |
9,793.20 |
0.55 |
8,977.10 |
0.50 |
8,161.00 |
| 720-01-A |
erosion control system, slpoe protection (type a)
|
900   |
sq m |
1.40 |
1,260.00 |
1.25 |
1,125.00 |
1.80 |
1,620.00 |
1.40 |
1,260.00 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
450   |
sq m |
1.40 |
630.00 |
1.25 |
562.50 |
3.60 |
1,620.00 |
3.00 |
1,350.00 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
450   |
sq m |
1.75 |
787.50 |
1.50 |
675.00 |
3.60 |
1,620.00 |
3.00 |
1,350.00 |
| 722-01 |
project site laboratory
|
1   |
ea |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
| 724-01-B |
pavement patching (300 mm minimum thickness)
|
100   |
sq m |
150.00 |
15,000.00 |
85.00 |
8,500.00 |
145.00 |
14,500.00 |
75.00 |
7,500.00 |
| 724-02 |
pavement widening
|
83.7 |
sq m |
100.00 |
8,370.00 |
65.00 |
5,440.50 |
155.00 |
12,973.50 |
75.00 |
6,277.50 |
| 725-01 |
temporary detour roads
|
2,682.9 |
ln m |
450.00 |
1,207,305.00 |
500.00 |
1,341,450.00 |
570.00 |
1,529,253.00 |
685.00 |
1,837,786.50 |
| 725-03 |
temporary detour bridging
|
336.00 |
ln m |
2,500.00 |
840,000.00 |
4,100.00 |
1,377,600.00 |
4,000.00 |
1,344,000.00 |
3,000.00 |
1,008,000.00 |
| 725-04 |
low profile runaround
|
1   |
ea |
12,500.00 |
12,500.00 |
25,000.00 |
25,000.00 |
45,000.00 |
45,000.00 |
87,000.00 |
87,000.00 |
| 726-01 |
bedding material
|
286.8 |
cu m |
70.00 |
20,076.00 |
62.00 |
17,781.60 |
55.00 |
15,774.00 |
55.00 |
15,774.00 |
| 727-01 |
mobilization
|
lump |
lump |
900,000.00 |
900,000.00 |
1,000,000.00 |
1,000,000.00 |
1,000,000.00 |
1,000,000.00 |
995,000.00 |
995,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
20   |
ea |
75.00 |
1,500.00 |
70.00 |
1,400.00 |
65.00 |
1,300.00 |
90.00 |
1,800.00 |
| 731-02 |
reflectorized raised pavement markers
|
277   |
ea |
5.50 |
1,523.50 |
5.00 |
1,385.00 |
5.00 |
1,385.00 |
6.25 |
1,731.25 |
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
10.171 |
km |
1,500.00 |
15,256.50 |
1,141.00 |
11,605.11 |
1,200.00 |
12,205.20 |
1,450.00 |
14,747.95 |
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
2.580 |
km |
500.00 |
1,290.00 |
432.00 |
1,114.56 |
440.00 |
1,135.20 |
550.00 |
1,419.00 |
| 732-05 |
removal of existing markings
|
0.809 |
km |
3,000.00 |
2,427.00 |
5,000.00 |
4,045.00 |
5,000.00 |
4,045.00 |
3,500.00 |
2,831.50 |
| 735-01 |
mailboxes
|
11   |
ea |
20.00 |
220.00 |
1.00 |
11.00 |
10.00 |
110.00 |
100.00 |
1,100.00 |
| 735-02 |
mailbox supports (single)
|
11   |
ea |
175.00 |
1,925.00 |
200.00 |
2,200.00 |
150.00 |
1,650.00 |
100.00 |
1,100.00 |
| 740-01 |
construction layout
|
lump |
lump |
200,000.00 |
200,000.00 |
200,000.00 |
200,000.00 |
115,000.00 |
115,000.00 |
135,000.00 |
135,000.00 |
| 744-01 |
traffic control management
|
lump |
lump |
45,000.00 |
45,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
| 804-01-B |
precast concrete piles (350 mm)
|
350.0 |
ln m |
120.00 |
42,000.00 |
125.00 |
43,750.00 |
170.00 |
59,500.00 |
140.00 |
49,000.00 |
| 804-01-C |
precast concrete piles (400 mm)
|
3,497.5 |
ln m |
140.00 |
489,650.00 |
140.00 |
489,650.00 |
180.00 |
629,550.00 |
178.00 |
622,555.00 |
| 804-01-F |
precast concrete piles (600 mm)
|
1,050.0 |
ln m |
250.00 |
262,500.00 |
265.00 |
278,250.00 |
300.00 |
315,000.00 |
390.00 |
409,500.00 |
| 804-05 |
precast concrete test piles
|
2   |
ea |
6,000.00 |
12,000.00 |
8,000.00 |
16,000.00 |
30,000.00 |
60,000.00 |
35,000.00 |
70,000.00 |
| 804-09 |
loading test piles
|
2   |
ea |
15,000.00 |
30,000.00 |
15,000.00 |
30,000.00 |
5,000.00 |
10,000.00 |
1.00 |
2.00 |
| 804-10 |
reloading test piles
|
2   |
ea |
2,000.00 |
4,000.00 |
2,000.00 |
4,000.00 |
1,000.00 |
2,000.00 |
1.00 |
2.00 |
| 804-11 |
redriving test piles
|
2   |
ea |
3,000.00 |
6,000.00 |
2,000.00 |
4,000.00 |
1,000.00 |
2,000.00 |
1.00 |
2.00 |
| 804-12 |
loading permanent piles
|
5   |
ea |
2,000.00 |
10,000.00 |
2,000.00 |
10,000.00 |
3,500.00 |
17,500.00 |
1.00 |
5.00 |
| 804-17 |
dynamic monitoring
|
6   |
each |
1,500.00 |
9,000.00 |
2,000.00 |
12,000.00 |
1,500.00 |
9,000.00 |
1,000.00 |
6,000.00 |
| 805-01-F |
class a concrete (bents)
|
433.66 |
cu m |
725.00 |
314,403.50 |
750.00 |
325,245.00 |
700.00 |
303,562.00 |
650.00 |
281,879.00 |
| 805-03 |
class aa concrete
|
1,724.86 |
cu m |
600.00 |
1,034,916.00 |
750.00 |
1,293,645.00 |
650.00 |
1,121,159.00 |
575.00 |
991,794.50 |
| 805-08-B |
precast-prestressed concrete girders (type ii)
|
1,158.30 |
ln m |
250.00 |
289,575.00 |
275.00 |
318,532.50 |
215.00 |
249,034.50 |
315.00 |
364,864.50 |
| 805-11 |
strip seal joints
|
79.20 |
ln m |
275.00 |
21,780.00 |
300.00 |
23,760.00 |
350.00 |
27,720.00 |
450.00 |
35,640.00 |
| 806-01 |
deformed reinforcing steel
|
234,705   |
kg |
1.50 |
352,057.50 |
1.45 |
340,322.25 |
1.70 |
398,998.50 |
1.85 |
434,204.25 |
| 807-06 |
structural metalwork
|
lump |
lump |
13,500.00 |
13,500.00 |
13,500.00 |
13,500.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
| 810-01 |
concrete railing (barrier)
|
840.00 |
ln m |
175.00 |
147,000.00 |
160.00 |
134,400.00 |
150.00 |
126,000.00 |
210.00 |
176,400.00 |
| 813-01 |
concrete approach slabs
|
968.40 |
sq m |
175.00 |
169,470.00 |
188.00 |
182,059.20 |
200.00 |
193,680.00 |
195.00 |
188,838.00 |
| S-101 |
dynamic analysis
|
6   |
each |
750.00 |
4,500.00 |
1,000.00 |
6,000.00 |
1,000.00 |
6,000.00 |
1,000.00 |
6,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
9,792,832.60 |
|
10,522,247.11 |
|
10,605,206.34 |
|
10,636,141.15 |
|