Letting of 9/14/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 066-02-0017
Parish: VERNON
Routes: LA 10
Description: FORT POLK - CRAVENS
Type Const: grading, drainage structures, class ii base course, superpave asphaltic concrete
pavement, concrete slab span bridges, and related work.
 
RankLicenseBidderAmount
112312 GILCHRIST CONSTRUCTION CO. LLC $9,792,832.60
208815 W. E. MCDONALD & SON, LLC. $10,522,247.11
334567 JAMES CONSTRUCTION GROUP LLC $10,605,206.34
409090 GUINN BROTHERS, LLC. $10,636,141.15
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
W. E. MCDONALD & SON, LLC.
- 3 -
JAMES CONSTRUCTION GROUP LLC
- 4 -
GUINN BROTHERS, LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 150,000.00 150,000.00 170,000.00 170,000.00 385,000.00 385,000.00 225,000.00 225,000.00
202-01 removal of structures & obstructions lump      lump 10,000.00 10,000.00 50,000.00 50,000.00 6,000.00 6,000.00 10,000.00 10,000.00
202-02-A-01 removal of bridge (sta. 10+657.55; 7.75 m x 58.20 m
timber bridge)
1      ea 22,000.00 22,000.00 27,000.00 27,000.00 15,000.00 15,000.00 20,000.00 20,000.00
202-02-A-02 removal of bridge (sta. 20+317.66; 7.14 m x 23.80 m
timber bridge)
1      ea 8,500.00 8,500.00 17,000.00 17,000.00 6,000.00 6,000.00 9,000.00 9,000.00
202-02-A-03 removal of bridge (sta. 20+430.00; 7.10 m x 34.40 m
timber bridge)
1      ea 25,000.00 25,000.00 22,000.00 22,000.00 9,000.00 9,000.00 12,000.00 12,000.00
202-02-A-04 removal of bridge (sta. 40+307.88; 8.53 m x 46.60 m
precast concrete bridge )
1      ea 25,000.00 25,000.00 25,000.00 25,000.00 13,000.00 13,000.00 25,000.00 25,000.00
202-02-A-05 removal of bridge (sta. 40+408.65; 7.00 m x 75.59 m
timber bridge)
1      ea 30,000.00 30,000.00 32,000.00 32,000.00 20,000.00 20,000.00 20,000.00 20,000.00
202-02-A-06 removal of bridge (sta. 40+791.26; 7.01 m x 99.10 m
timber bridge)
1      ea 40,000.00 40,000.00 42,000.00 42,000.00 28,000.00 28,000.00 30,000.00 30,000.00
202-02-A-07 removal of bridge (sta. 10+559.79; 7.68 m x 23.80 m
timber bridge)
1      ea 8,500.00 8,500.00 17,000.00 17,000.00 7,000.00 7,000.00 9,000.00 9,000.00
202-02-A-08 removal of bridge (sta. 11+290.89; 7.68 m x 12.30 m
timber bridge)
1      ea 8,500.00 8,500.00 17,000.00 17,000.00 5,000.00 5,000.00 8,000.00 8,000.00
202-02-A-09 removal of bridge (sta. 30+303.63; 7.76 m x 17.80 m
timber bridge)
1      ea 8,500.00 8,500.00 17,000.00 17,000.00 6,000.00 6,000.00 7,500.00 7,500.00
202-02-D removal of concrete walks & drives 121      sq m 8.00 968.00 10.00 1,210.00 10.00 1,210.00 10.00 1,210.00
202-02-I removal of base and surfacing 13,762      sq m 5.00 68,810.00 8.00 110,096.00 3.50 48,167.00 3.00 41,286.00
202-02-J removal of 6m x 18m wood and tin building (lt. of sta.
40+186.97)
1      ea 5,000.00 5,000.00 9,000.00 9,000.00 3,000.00 3,000.00 5,000.00 5,000.00
202-02-K removal of aband.underground storage tanks, pump
island, noncontaminated soils and fluids(parcel
11-1,approx. 40+198)
lump      lump 35,000.00 35,000.00 40,000.00 40,000.00 3,500.00 3,500.00 40,000.00 40,000.00
203-01 general excavation 17,959      cu m 7.50 134,692.50 6.00 107,754.00 5.00 89,795.00 5.00 89,795.00
203-02 drainage excavation 19,150      cu m 8.25 157,987.50 7.00 134,050.00 8.00 153,200.00 6.00 114,900.00
203-03 muck excavation 332      cu m 15.00 4,980.00 20.00 6,640.00 20.00 6,640.00 10.00 3,320.00
203-04 embankment 31,199      cu m 15.00 467,985.00 8.00 249,592.00 10.00 311,990.00 9.00 280,791.00
204-05-A temporary sediment check dams (hay) 16      ea 100.00 1,600.00 70.00 1,120.00 115.00 1,840.00 100.00 1,600.00
204-06 temporary silt fencing 3,000      ln m 2.00 6,000.00 6.00 18,000.00 4.20 12,600.00 6.00 18,000.00
302-01 class ii base course 5,556.3    cu m 90.00 500,067.00 65.00 361,159.50 85.00 472,285.50 80.00 444,504.00
304-01 lime 83.16   Mg 150.00 12,474.00 200.00 16,632.00 140.00 11,642.40 135.00 11,226.60
304-04-D lime treatment (type d) (300 mm thick) 5,500      sq m 5.00 27,500.00 4.00 22,000.00 1.50 8,250.00 2.50 13,750.00
401-02 aggregate surface course (adjusted vehicular
measurement)
24      cu m 100.00 2,400.00 100.00 2,400.00 75.00 1,800.00 100.00 2,400.00
402-01 traffic maintenance aggregate (vehicular measurement) 400.0    cu m 50.00 20,000.00 30.00 12,000.00 35.00 14,000.00 40.00 16,000.00
502-01 superpave asphaltic concrete 9,068.2    Mg 75.00 680,115.00 73.00 661,978.60 75.00 680,115.00 81.00 734,524.20
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
7.0    Mg 150.00 1,050.00 225.00 1,575.00 250.00 1,750.00 500.00 3,500.00
509-01 cold planing asphaltic pavement 478      sq m 12.00 5,736.00 10.00 4,780.00 6.00 2,868.00 50.00 23,900.00
509-02 contractor retained reclaimed asphalt pavement - 6      cu m 1.00 - 6.00 0.01 - 0.06 0.01 - 0.06 1.00 - 6.00
701-01-I/M cross drain pipe (600 mm rcp/pcp or 900 mm cmp) 27.0    ln m 225.00 6,075.00 190.00 5,130.00 250.00 6,750.00 105.00 2,835.00
701-01-P/Q cross drain pipe (1350 mm rcp/pcp or 1500 mm cmp) 128.5    ln m 550.00 70,675.00 450.00 57,825.00 500.00 64,250.00 350.00 44,975.00
701-01-S/U cross drain pipe (1800 mm rcp/pcp or 2100 mm cmp) 99.0    ln m 950.00 94,050.00 800.00 79,200.00 750.00 74,250.00 465.00 46,035.00
701-02-J/L cross drain pipe arch (1500 mm equiv. rcpa or 1800 mm
equiv. cmpa)
102.0    ln m 675.00 68,850.00 650.00 66,300.00 600.00 61,200.00 415.00 42,330.00
701-05-G side drain pipe (450 mm) 22.5    ln m 200.00 4,500.00 150.00 3,375.00 145.00 3,262.50 75.00 1,687.50
701-05-I side drain pipe (600 mm) 22.5    ln m 250.00 5,625.00 180.00 4,050.00 165.00 3,712.50 135.00 3,037.50
702-05-A cross drain end treatment (1x600 mm rcp or 900 mm cmp) 2      ea 2,500.00 5,000.00 1,800.00 3,600.00 1,200.00 2,400.00 2,000.00 4,000.00
702-05-B cross drain end treatment (1x1350 mm rcp or 1500 mm
cmp)
2      ea 3,500.00 7,000.00 2,200.00 4,400.00 2,300.00 4,600.00 2,000.00 4,000.00
702-05-C cross drain end treatment (3x1350 mm rcp or 1500 mm
cmp)
2      ea 3,500.00 7,000.00 2,600.00 5,200.00 4,700.00 9,400.00 3,000.00 6,000.00
702-05-D cross drain end treatment (4x1500 mm eq rcp or 1800 mm
eq cmpa)
2      ea 9,000.00 18,000.00 6,800.00 13,600.00 5,000.00 10,000.00 4,500.00 9,000.00
702-05-E cross drain end treatment (1x1800 mm rcp or 2100 mm
cmp)
2      ea 6,500.00 13,000.00 3,800.00 7,600.00 3,500.00 7,000.00 2,800.00 5,600.00
702-05-F cross drain end treatment (2x1800 mm rcp or 2100 mm
cmp)
2      ea 8,000.00 16,000.00 6,000.00 12,000.00 4,700.00 9,400.00 4,000.00 8,000.00
704-03 blocked out guard rail 518.16   ln m 55.00 28,498.80 49.22 25,503.83 65.00 33,680.40 55.00 28,498.80
704-08-B guard rail transitions (double thrie beam) 152.40   ln m 200.00 30,480.00 170.00 25,908.00 155.00 23,622.00 185.00 28,194.00
704-11-A guard rail end treatment (flared) 16      ea 2,000.00 32,000.00 1,800.00 28,800.00 2,150.00 34,400.00 2,200.00 35,200.00
705-01 barbed wire fence 2,826      ln m 17.50 49,455.00 16.27 45,979.02 16.00 45,216.00 16.00 45,216.00
706-02-C concrete drive (150 mm thick) 74.3    sq m 60.00 4,458.00 65.00 4,829.50 55.00 4,086.50 50.00 3,715.00
708-01 right-of-way monument 81      ea 300.00 24,300.00 150.00 12,150.00 100.00 8,100.00 150.00 12,150.00
708-02 right-of-way monument witness post 81      ea 300.00 24,300.00 150.00 12,150.00 100.00 8,100.00 150.00 12,150.00
712-04 flexible revetment 2,798      sq m 60.00 167,880.00 54.00 151,092.00 45.00 125,910.00 45.00 125,910.00
713-01 temporary signs & barricades lump      lump 100,000.00 100,000.00 175,000.00 175,000.00 50,000.00 50,000.00 100,000.00 100,000.00
713-04-A temporary pavement markings (broken line)(100 mm w)
(1.2 m length)
2.580  km 800.00 2,064.00 250.00 645.00 350.00 903.00 FREE FREE
713-05-A temporary pavement markings (solid line)(100 mm width) 16.762  km 500.00 8,381.00 300.00 5,028.60 300.00 5,028.60 550.00 9,219.10
713-07 temporary reflectorized raised pavement markers 275      ea 2.00 550.00 1.50 412.50 6.00 1,650.00 7.50 2,062.50
716-01-A mulch (vegetative) 7.3    hctr 1,500.00 10,950.00 1,380.00 10,074.00 1,700.00 12,410.00 3,000.00 21,900.00
717-01 seeding 490      kg 15.00 7,350.00 13.48 6,605.20 15.00 7,350.00 15.00 7,350.00
718-01 fertilizer 16,322      kg 0.65 10,609.30 0.60 9,793.20 0.55 8,977.10 0.50 8,161.00
720-01-A erosion control system, slpoe protection (type a) 900      sq m 1.40 1,260.00 1.25 1,125.00 1.80 1,620.00 1.40 1,260.00
720-01-C erosion control system, flexible channel liner (type c) 450      sq m 1.40 630.00 1.25 562.50 3.60 1,620.00 3.00 1,350.00
720-01-D erosion control system, flexible channel liner (type d) 450      sq m 1.75 787.50 1.50 675.00 3.60 1,620.00 3.00 1,350.00
722-01 project site laboratory 1      ea 20,000.00 20,000.00 15,000.00 15,000.00 6,000.00 6,000.00 10,000.00 10,000.00
724-01-B pavement patching (300 mm minimum thickness) 100      sq m 150.00 15,000.00 85.00 8,500.00 145.00 14,500.00 75.00 7,500.00
724-02 pavement widening 83.7    sq m 100.00 8,370.00 65.00 5,440.50 155.00 12,973.50 75.00 6,277.50
725-01 temporary detour roads 2,682.9    ln m 450.00 1,207,305.00 500.00 1,341,450.00 570.00 1,529,253.00 685.00 1,837,786.50
725-03 temporary detour bridging 336.00   ln m 2,500.00 840,000.00 4,100.00 1,377,600.00 4,000.00 1,344,000.00 3,000.00 1,008,000.00
725-04 low profile runaround 1      ea 12,500.00 12,500.00 25,000.00 25,000.00 45,000.00 45,000.00 87,000.00 87,000.00
726-01 bedding material 286.8    cu m 70.00 20,076.00 62.00 17,781.60 55.00 15,774.00 55.00 15,774.00
727-01 mobilization lump      lump 900,000.00 900,000.00 1,000,000.00 1,000,000.00 1,000,000.00 1,000,000.00 995,000.00 995,000.00
729-16-C object marker assembly (type 3) 20      ea 75.00 1,500.00 70.00 1,400.00 65.00 1,300.00 90.00 1,800.00
731-02 reflectorized raised pavement markers 277      ea 5.50 1,523.50 5.00 1,385.00 5.00 1,385.00 6.25 1,731.25
732-02-A plastic pavement striping (solid line)(100 mm width) 10.171  km 1,500.00 15,256.50 1,141.00 11,605.11 1,200.00 12,205.20 1,450.00 14,747.95
732-03-A plastic pavement striping (broken line)(100 mm width) 2.580  km 500.00 1,290.00 432.00 1,114.56 440.00 1,135.20 550.00 1,419.00
732-05 removal of existing markings 0.809  km 3,000.00 2,427.00 5,000.00 4,045.00 5,000.00 4,045.00 3,500.00 2,831.50
735-01 mailboxes 11      ea 20.00 220.00 1.00 11.00 10.00 110.00 100.00 1,100.00
735-02 mailbox supports (single) 11      ea 175.00 1,925.00 200.00 2,200.00 150.00 1,650.00 100.00 1,100.00
740-01 construction layout lump      lump 200,000.00 200,000.00 200,000.00 200,000.00 115,000.00 115,000.00 135,000.00 135,000.00
744-01 traffic control management lump      lump 45,000.00 45,000.00 10,000.00 10,000.00 10,000.00 10,000.00 25,000.00 25,000.00
804-01-B precast concrete piles (350 mm) 350.0    ln m 120.00 42,000.00 125.00 43,750.00 170.00 59,500.00 140.00 49,000.00
804-01-C precast concrete piles (400 mm) 3,497.5    ln m 140.00 489,650.00 140.00 489,650.00 180.00 629,550.00 178.00 622,555.00
804-01-F precast concrete piles (600 mm) 1,050.0    ln m 250.00 262,500.00 265.00 278,250.00 300.00 315,000.00 390.00 409,500.00
804-05 precast concrete test piles 2      ea 6,000.00 12,000.00 8,000.00 16,000.00 30,000.00 60,000.00 35,000.00 70,000.00
804-09 loading test piles 2      ea 15,000.00 30,000.00 15,000.00 30,000.00 5,000.00 10,000.00 1.00 2.00
804-10 reloading test piles 2      ea 2,000.00 4,000.00 2,000.00 4,000.00 1,000.00 2,000.00 1.00 2.00
804-11 redriving test piles 2      ea 3,000.00 6,000.00 2,000.00 4,000.00 1,000.00 2,000.00 1.00 2.00
804-12 loading permanent piles 5      ea 2,000.00 10,000.00 2,000.00 10,000.00 3,500.00 17,500.00 1.00 5.00
804-17 dynamic monitoring 6      each 1,500.00 9,000.00 2,000.00 12,000.00 1,500.00 9,000.00 1,000.00 6,000.00
805-01-F class a concrete (bents) 433.66   cu m 725.00 314,403.50 750.00 325,245.00 700.00 303,562.00 650.00 281,879.00
805-03 class aa concrete 1,724.86   cu m 600.00 1,034,916.00 750.00 1,293,645.00 650.00 1,121,159.00 575.00 991,794.50
805-08-B precast-prestressed concrete girders (type ii) 1,158.30   ln m 250.00 289,575.00 275.00 318,532.50 215.00 249,034.50 315.00 364,864.50
805-11 strip seal joints 79.20   ln m 275.00 21,780.00 300.00 23,760.00 350.00 27,720.00 450.00 35,640.00
806-01 deformed reinforcing steel 234,705      kg 1.50 352,057.50 1.45 340,322.25 1.70 398,998.50 1.85 434,204.25
807-06 structural metalwork lump      lump 13,500.00 13,500.00 13,500.00 13,500.00 5,000.00 5,000.00 5,000.00 5,000.00
810-01 concrete railing (barrier) 840.00   ln m 175.00 147,000.00 160.00 134,400.00 150.00 126,000.00 210.00 176,400.00
813-01 concrete approach slabs 968.40   sq m 175.00 169,470.00 188.00 182,059.20 200.00 193,680.00 195.00 188,838.00
S-101 dynamic analysis 6      each 750.00 4,500.00 1,000.00 6,000.00 1,000.00 6,000.00 1,000.00 6,000.00
                       
 CONTRACTOR TOTAL       9,792,832.60   10,522,247.11   10,605,206.34   10,636,141.15