| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - D & J CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
561   |
CUYD |
16.50 |
9,256.50 |
30.00 |
16,830.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
99   |
CUYD |
50.00 |
4,950.00 |
56.00 |
5,544.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
21,788.6 |
TON |
61.50 |
1,339,998.90 |
59.00 |
1,285,527.40 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
miscellaneous |
333.7 |
TON |
125.00 |
41,712.50 |
125.00 |
41,712.50 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
76,675   |
SQYD |
1.75 |
134,181.25 |
1.80 |
138,015.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,134   |
CUYD |
0.10 |
- 213.40 |
0.01 |
- 21.34 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
44   |
LNFT |
160.00 |
7,040.00 |
100.00 |
4,400.00 |
|
|
|
|
| 701-15 |
concrete collar
|
4   |
EACH |
800.00 |
3,200.00 |
475.00 |
1,900.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
96,000.00 |
96,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
16.337 |
MILE |
158.83 |
2,594.80 |
165.00 |
2,695.60 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
16.337 |
MILE |
300.00 |
4,901.10 |
150.00 |
2,450.55 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
32.674 |
MILE |
2.00 |
65.34 |
335.00 |
10,945.79 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
4.00 |
ACRE |
1,100.00 |
4,400.00 |
800.00 |
3,200.00 |
|
|
|
|
| 717-01 |
seeding
|
178   |
LB |
11.00 |
1,958.00 |
7.00 |
1,246.00 |
|
|
|
|
| 718-01 |
fertilizer
|
3,960   |
LB |
0.48 |
1,900.80 |
0.30 |
1,188.00 |
|
|
|
|
| 724-01-C |
pavement patching (15" minimum thickness)
|
200   |
SQYD |
150.00 |
30,000.00 |
125.00 |
25,000.00 |
|
|
|
|
| 724-02 |
pavement widening
|
28,753.0 |
SQYD |
25.00 |
718,825.00 |
30.00 |
862,590.00 |
|
|
|
|
| 726-01 |
bedding material
|
57.2 |
CUYD |
80.00 |
4,576.00 |
70.00 |
4,004.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
87,000.00 |
87,000.00 |
125,000.00 |
125,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
720   |
EACH |
6.00 |
4,320.00 |
7.25 |
5,220.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
10.891 |
MILE |
2,300.00 |
25,049.30 |
2,700.00 |
29,405.70 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.446 |
MILE |
950.00 |
5,173.70 |
900.00 |
4,901.40 |
|
|
|
|
| 735-01 |
mailboxes
|
7   |
EACH |
15.00 |
105.00 |
1.00 |
7.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
7   |
EACH |
150.00 |
1,050.00 |
200.00 |
1,400.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
10,000.00 |
10,000.00 |
16,000.00 |
16,000.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
16.38 |
CUYD |
880.00 |
14,414.40 |
1,000.00 |
16,380.00 |
|
|
|
|
| 805-12-I |
reinforced concrete box culverts (5'x 5')
|
24.0 |
LNFT |
820.00 |
19,680.00 |
850.00 |
20,400.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
1,183   |
LB |
2.50 |
2,957.50 |
1.75 |
2,070.25 |
|
|
|
|
| S-001 |
cleaning existing ditches
|
450   |
LNFT |
13.00 |
5,850.00 |
10.00 |
4,500.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,529,946.69 |
|
2,743,511.85 |
|
|
|
|
|