| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - DENTON-JAMES LLC |
- 4 - HIGHWAY SPECIALISTS INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
200,000.00 |
200,000.00 |
550,000.00 |
550,000.00 |
1,000,000.00 |
1,000,000.00 |
300,000.00 |
300,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
40,000.00 |
40,000.00 |
28,000.00 |
28,000.00 |
200,000.00 |
200,000.00 |
100,000.00 |
100,000.00 |
| 202-02-B-01 |
removal of concrete box culvert (sta. 134+41; 1-3' x
2' and 1-4' x 2' x 64') |
1   |
EACH |
7,000.00 |
7,000.00 |
2,000.00 |
2,000.00 |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
| 202-02-B-02 |
removal of concrete box culvert (sta. 158+58; 1-3' x
2' and 1-4' x 2' x 63') |
1   |
EACH |
7,000.00 |
7,000.00 |
2,000.00 |
2,000.00 |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
| 202-02-B-03 |
removal of concrete box culvert (sta. 174+78; 4' x 3'
x 56') |
1   |
EACH |
3,500.00 |
3,500.00 |
2,000.00 |
2,000.00 |
4,000.00 |
4,000.00 |
3,000.00 |
3,000.00 |
| 202-02-B-04 |
removal of concrete box culvert (sta. 194+62; 4' x 2'
x 52') |
1   |
EACH |
3,500.00 |
3,500.00 |
2,000.00 |
2,000.00 |
3,000.00 |
3,000.00 |
6,000.00 |
6,000.00 |
| 202-02-B-05 |
removal of concrete box culvert (sta. 207+79; 4' x 2'
x 80') |
1   |
EACH |
3,500.00 |
3,500.00 |
2,000.00 |
2,000.00 |
4,000.00 |
4,000.00 |
3,000.00 |
3,000.00 |
| 202-02-B-06 |
removal of concrete box culvert (sta. 222+39; 3' x 3'
x 54') |
1   |
EACH |
3,500.00 |
3,500.00 |
2,000.00 |
2,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
| 202-02-B-07 |
removal of concrete box culvert (sta. 222+57; 6' x 4'
x 52') |
1   |
EACH |
3,500.00 |
3,500.00 |
2,000.00 |
2,000.00 |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
| 202-02-B-08 |
removal of concrete box culvert (sta. 224+15; 5' x 2'
x 52') |
1   |
EACH |
3,500.00 |
3,500.00 |
2,000.00 |
2,000.00 |
4,000.00 |
4,000.00 |
3,000.00 |
3,000.00 |
| 202-02-B-09 |
removal of concrete box culvert (sta. 247+97; 4' x 3'
x 46') |
1   |
EACH |
3,500.00 |
3,500.00 |
2,000.00 |
2,000.00 |
4,000.00 |
4,000.00 |
3,000.00 |
3,000.00 |
| 202-02-B-10 |
removal of concrete box culvert (sta. 269+77; 3' x 3'
x 46') |
1   |
EACH |
3,500.00 |
3,500.00 |
2,000.00 |
2,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
| 202-02-B-11 |
removal of concrete box culvert (sta. 284+01; 4' x 2'
x 55') |
1   |
EACH |
3,500.00 |
3,500.00 |
2,000.00 |
2,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
| 202-02-B-12 |
removal of concrete box culvert (sta. 292+25; 4' x 4'
x 45') |
1   |
EACH |
3,500.00 |
3,500.00 |
3,000.00 |
3,000.00 |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
| 202-02-B-13 |
removal of concrete box culvert (sta. 306+56; 4' x 3'
x 51') |
1   |
EACH |
3,500.00 |
3,500.00 |
3,000.00 |
3,000.00 |
4,000.00 |
4,000.00 |
3,000.00 |
3,000.00 |
| 202-02-B-14 |
removal of concrete box culvert (sta. 327+79; 4' x 3'
x 46') |
1   |
EACH |
3,500.00 |
3,500.00 |
3,000.00 |
3,000.00 |
4,000.00 |
4,000.00 |
3,000.00 |
3,000.00 |
| 202-02-B-15 |
removal of concrete box culvert (sta. 342+42; 3-5' x
5' x 50') |
1   |
EACH |
7,000.00 |
7,000.00 |
3,000.00 |
3,000.00 |
8,000.00 |
8,000.00 |
9,000.00 |
9,000.00 |
| 202-02-B-16 |
removal of concrete box culvert (sta. 374+80; 3' x 2'
x 53') |
1   |
EACH |
3,500.00 |
3,500.00 |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
| 202-02-B-17 |
removal of concrete box culvert (sta. 399+72; 3' x 2'
x 50') |
1   |
EACH |
3,500.00 |
3,500.00 |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
| 202-02-B-18 |
removal of concrete box culvert (sta. 429+00; 2' x 2'
x 49') |
1   |
EACH |
3,500.00 |
3,500.00 |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
2,499   |
SQYD |
4.50 |
11,245.50 |
3.00 |
7,497.00 |
10.00 |
24,990.00 |
12.00 |
29,988.00 |
| 202-02-D |
removal of concrete walks & drives
|
4,128   |
SQYD |
3.00 |
12,384.00 |
6.00 |
24,768.00 |
8.00 |
33,024.00 |
10.00 |
41,280.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
11,908.1 |
SQYD |
4.00 |
47,632.40 |
6.00 |
71,448.60 |
5.00 |
59,540.50 |
12.00 |
142,897.20 |
| 202-02-01 |
removal of 13' x 13' wood office (lt. of sta. 162+49)
|
1   |
EACH |
300.00 |
300.00 |
500.00 |
500.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-02 |
removal of 24' x 14' metal office (rt. of sta. 162+49)
|
1   |
EACH |
300.00 |
300.00 |
500.00 |
500.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-03 |
removal of 50' x 26' metal canopy (lt. of sta. 163+89)
|
1   |
EACH |
300.00 |
300.00 |
50.00 |
50.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-04 |
removal of 44' x 22' metal canopy (lt. of sta. 167+80)
|
1   |
EACH |
300.00 |
300.00 |
50.00 |
50.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-05 |
removal of 50' x 25' wood frame residence (rt. of sta.
172+26) |
1   |
EACH |
300.00 |
300.00 |
500.00 |
500.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-06 |
removal of 70' x 35' wood frame residence (rt. of sta.
201+90)(contains non-friable asbestos) |
1   |
EACH |
6,500.00 |
6,500.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-07 |
removal of 30' x 30' metal shop (rt. of sta. 205+80)
|
1   |
EACH |
2,000.00 |
2,000.00 |
1,000.00 |
1,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-08 |
removal of 70' x 30' brick residence (rt. of sta.
212+00) |
1   |
EACH |
4,000.00 |
4,000.00 |
500.00 |
500.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-09 |
removal of 44' x 28' wood frame residence (rt. of sta.
213+67)(contains non-friable asbestos) |
1   |
EACH |
300.00 |
300.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-10 |
removal of 43' x 20' wood frame residence (rt. of sta.
215+54)(contains non-friable asbestos) |
1   |
EACH |
6,500.00 |
6,500.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-11 |
removal of 14' x 10' wood shed (rt. of sta. 215+76)
|
1   |
EACH |
1,000.00 |
1,000.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-12 |
removal of 106' x 36' wood frame residence (rt. of
sta. 217+69) |
1   |
EACH |
8,000.00 |
8,000.00 |
50.00 |
50.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-13 |
removal of 72' x 34' brick residence (rt. of sta.
220+36) |
1   |
EACH |
4,000.00 |
4,000.00 |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-14 |
removal of 36' x 25' wood frame residence (rt. of sta.
227+43) |
1   |
EACH |
300.00 |
300.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-15 |
removal of 40' x 30' brick residence (rt. of sta.
230+13)(contains non-friable asbestos) |
1   |
EACH |
6,500.00 |
6,500.00 |
500.00 |
500.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-16 |
removal of 70' x 35' brick residence (rt. of sta.
232+50)(contains non-friable asbestos) |
1   |
EACH |
6,500.00 |
6,500.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-17 |
removal of 75' x 35' brick residence (rt. of sta.
234+61)(contains non-friable asbestos) |
1   |
EACH |
6,500.00 |
6,500.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-18 |
removal of traffic signal equipment (lt. & rt. of sta.
236+24) |
1   |
EACH |
2,200.00 |
2,200.00 |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
2,000.00 |
2,000.00 |
| 202-02-19 |
removal of 50' x 40' brick residence (rt. of sta.
239+12) |
1   |
EACH |
2,000.00 |
2,000.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-20 |
removal of 83' x 30' brick residence (rt. of sta.
240+35)(contains non-friable asbestos) |
1   |
EACH |
6,500.00 |
6,500.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-21 |
removal of 38' x 30' wood frame residence (rt. of sta.
242+34) |
1   |
EACH |
300.00 |
300.00 |
500.00 |
500.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-22 |
removal of 55' x 30' wood frame residence (rt. of sta.
294+40) |
1   |
EACH |
2,000.00 |
2,000.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-23 |
removal of 60' x 40' brick residence (rt. of sta.
295+30) |
1   |
EACH |
2,000.00 |
2,000.00 |
500.00 |
500.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-24 |
removal of 60' x 27' wood frame residence (rt. of sta.
299+00) |
1   |
EACH |
2,000.00 |
2,000.00 |
500.00 |
500.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-25 |
removal of 50' x 25' wood frame residence (rt. of sta.
303+20) |
1   |
EACH |
4,000.00 |
4,000.00 |
500.00 |
500.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-26 |
removal of 12' x 10' metal shed (rt. of sta. 307+66)
|
1   |
EACH |
1,000.00 |
1,000.00 |
500.00 |
500.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-27 |
removal of 75' x 31' brick residence (rt. of sta.
308+14)(contains non-friable asbestos) |
1   |
EACH |
6,500.00 |
6,500.00 |
1,000.00 |
1,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-28 |
removal of 7' x 5' metal shed (rt. of 317+32)
|
1   |
EACH |
1,000.00 |
1,000.00 |
50.00 |
50.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-29 |
removal of 11' x 11' wood shed (rt. of sta. 317+50)
|
1   |
EACH |
1,000.00 |
1,000.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-30 |
removal of 21' x 16' wood shed (rt. of sta. 317+60)
|
1   |
EACH |
1,000.00 |
1,000.00 |
50.00 |
50.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-31 |
removal of 64' x 50' wood frame residence (rt. of sta.
319+16) |
1   |
EACH |
300.00 |
300.00 |
20.00 |
20.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-32 |
removal of 16' x 13' wood shed (rt. of sta. 320+36)
|
1   |
EACH |
1,000.00 |
1,000.00 |
50.00 |
50.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-33 |
removal of 52' x 30' wood frame residence (rt. of sta.
320+90)(contains non-friable asbestos) |
1   |
EACH |
6,500.00 |
6,500.00 |
1,000.00 |
1,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-34 |
removal of 50' x 30' brick residence (rt. of sta.
323+00) |
1   |
EACH |
4,000.00 |
4,000.00 |
50.00 |
50.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-35 |
removal of 80' x 40' wood frame residence (rt. of sta.
364+65) |
1   |
EACH |
300.00 |
300.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-36 |
removal of 57' x 29' wood frame residence (rt. of sta.
369+06) |
1   |
EACH |
300.00 |
300.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-37 |
removal of 60' x 35' wood frame residence (rt. of sta.
395+17)(contains friable and non-friable asbestos) |
1   |
EACH |
6,500.00 |
6,500.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-38 |
removal of 16' x 10' fiberglass greenhouse(rt. of sta.
395+85) |
1   |
EACH |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-39 |
removal of 21' x 21' wood shed (rt. of sta. 396+10)
|
1   |
EACH |
1,000.00 |
1,000.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-40 |
removal of 12' x 10' wood shed (rt. of sta. 396+11)
|
1   |
EACH |
1,000.00 |
1,000.00 |
50.00 |
50.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-41 |
removal of 52' x 28' brick residence (rt. of sta.
398+00)(contains friable asbestos) |
1   |
EACH |
6,500.00 |
6,500.00 |
50.00 |
50.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-42 |
removal of 58' x 28' wood frame residence (rt. of sta.
413+70) |
1   |
EACH |
2,000.00 |
2,000.00 |
50.00 |
50.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-43 |
removal of 23' x 61' brick residence (rt. of. sta.
184+50)(contains friable asbestos) |
1   |
EACH |
6,500.00 |
6,500.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-44 |
removal of 22' x 46' brick residence (rt. of. sta.
236+60)(contains friable asbestos) |
1   |
EACH |
6,500.00 |
6,500.00 |
500.00 |
500.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 203-01 |
general excavation
|
122,159   |
CUYD |
3.50 |
427,556.50 |
5.00 |
610,795.00 |
6.00 |
732,954.00 |
6.50 |
794,033.50 |
| 203-02 |
drainage excavation
|
1,111   |
CUYD |
5.00 |
5,555.00 |
11.00 |
12,221.00 |
13.00 |
14,443.00 |
8.50 |
9,443.50 |
| 203-04 |
embankment
|
152,923   |
CUYD |
6.25 |
955,768.75 |
10.00 |
1,529,230.00 |
11.00 |
1,682,153.00 |
8.50 |
1,299,845.50 |
| 204-02 |
temporary hay or straw bales
|
320   |
EACH |
15.00 |
4,800.00 |
10.00 |
3,200.00 |
7.00 |
2,240.00 |
6.00 |
1,920.00 |
| 204-03 |
temporary slope drains
|
3,381   |
LNFT |
10.00 |
33,810.00 |
11.00 |
37,191.00 |
10.00 |
33,810.00 |
5.00 |
16,905.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
115   |
EACH |
150.00 |
17,250.00 |
75.00 |
8,625.00 |
100.00 |
11,500.00 |
125.00 |
14,375.00 |
| 204-06 |
temporary silt fencing
|
34,585   |
LNFT |
1.75 |
60,523.75 |
2.00 |
69,170.00 |
1.30 |
44,960.50 |
1.75 |
60,523.75 |
| 204-07 |
temporary stone construction entrance
|
4   |
EACH |
2,500.00 |
10,000.00 |
2,000.00 |
8,000.00 |
1,500.00 |
6,000.00 |
3,500.00 |
14,000.00 |
| 304-01 |
lime
|
894.43 |
TON |
150.00 |
134,164.50 |
132.00 |
118,064.76 |
120.00 |
107,331.60 |
125.00 |
111,803.75 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
70,988   |
SQYD |
1.50 |
106,482.00 |
2.08 |
147,655.04 |
1.50 |
106,482.00 |
1.50 |
106,482.00 |
| 401-01 |
aggregate surface course (net section)
|
560.0 |
CUYD |
50.00 |
28,000.00 |
62.00 |
34,720.00 |
50.00 |
28,000.00 |
90.00 |
50,400.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,822.0 |
CUYD |
35.00 |
63,770.00 |
35.00 |
63,770.00 |
60.00 |
109,320.00 |
80.00 |
145,760.00 |
| 701-01-G |
cross drain pipe (18" rcp/pcp)
|
1,434   |
LNFT |
45.00 |
64,530.00 |
42.00 |
60,228.00 |
45.00 |
64,530.00 |
90.00 |
129,060.00 |
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
684   |
LNFT |
60.00 |
41,040.00 |
59.00 |
40,356.00 |
60.00 |
41,040.00 |
95.00 |
64,980.00 |
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
600   |
LNFT |
75.00 |
45,000.00 |
75.00 |
45,000.00 |
75.00 |
45,000.00 |
120.00 |
72,000.00 |
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
1,600   |
LNFT |
90.00 |
144,000.00 |
96.00 |
153,600.00 |
90.00 |
144,000.00 |
155.00 |
248,000.00 |
| 701-01-N |
cross drain pipe (42" rcp/pcp)
|
1,185   |
LNFT |
115.00 |
136,275.00 |
139.00 |
164,715.00 |
120.00 |
142,200.00 |
165.00 |
195,525.00 |
| 701-01-O |
cross drain pipe (48" rcp/pcp)
|
540   |
LNFT |
145.00 |
78,300.00 |
177.00 |
95,580.00 |
150.00 |
81,000.00 |
190.00 |
102,600.00 |
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
180   |
LNFT |
75.00 |
13,500.00 |
70.00 |
12,600.00 |
75.00 |
13,500.00 |
130.00 |
23,400.00 |
| 701-02-E |
cross drain pipe arch (30" equiv. rcpa)
|
360   |
LNFT |
90.00 |
32,400.00 |
91.00 |
32,760.00 |
85.00 |
30,600.00 |
140.00 |
50,400.00 |
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
998   |
LNFT |
105.00 |
104,790.00 |
112.00 |
111,776.00 |
110.00 |
109,780.00 |
150.00 |
149,700.00 |
| 701-02-G |
cross drain pipe arch (42" equiv. rcpa)
|
194   |
LNFT |
125.00 |
24,250.00 |
150.00 |
29,100.00 |
130.00 |
25,220.00 |
170.00 |
32,980.00 |
| 701-02-H |
cross drain pipe arch (48" equiv. rcpa)
|
382   |
LNFT |
150.00 |
57,300.00 |
182.00 |
69,524.00 |
160.00 |
61,120.00 |
190.00 |
72,580.00 |
| 701-02-J |
cross drain pipe arch (60" equiv. rcpa)
|
660   |
LNFT |
215.00 |
141,900.00 |
220.00 |
145,200.00 |
250.00 |
165,000.00 |
250.00 |
165,000.00 |
| 701-05-G |
side drain pipe (18")
|
3,950   |
LNFT |
40.00 |
158,000.00 |
43.00 |
169,850.00 |
40.00 |
158,000.00 |
30.00 |
118,500.00 |
| 701-05-I |
side drain pipe (24")
|
226   |
LNFT |
60.00 |
13,560.00 |
59.00 |
13,334.00 |
50.00 |
11,300.00 |
35.00 |
7,910.00 |
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
100   |
LNFT |
65.00 |
6,500.00 |
80.00 |
8,000.00 |
80.00 |
8,000.00 |
135.00 |
13,500.00 |
| 702-02-C |
manholes (r-cb-11 mod)
|
2   |
EACH |
4,500.00 |
9,000.00 |
4,300.00 |
8,600.00 |
3,500.00 |
7,000.00 |
4,000.00 |
8,000.00 |
| 702-03-A |
catch basins (cb-01)
|
10   |
EACH |
3,000.00 |
30,000.00 |
3,400.00 |
34,000.00 |
3,000.00 |
30,000.00 |
3,200.00 |
32,000.00 |
| 702-03-B |
catch basins (cb-02)
|
9   |
EACH |
5,000.00 |
45,000.00 |
4,500.00 |
40,500.00 |
3,500.00 |
31,500.00 |
4,000.00 |
36,000.00 |
| 702-03-E |
catch basins (cb-03)
|
8   |
EACH |
2,000.00 |
16,000.00 |
4,000.00 |
32,000.00 |
2,500.00 |
20,000.00 |
2,000.00 |
16,000.00 |
| 702-05-A |
cross drain end treatment (2 barrel, 24" equiv. rcpa)
|
2   |
EACH |
2,000.00 |
4,000.00 |
3,500.00 |
7,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
4,000.00 |
| 702-05-B |
cross drain end treatment (1 barrel, 36" rcp/pcp)
|
2   |
EACH |
2,100.00 |
4,200.00 |
3,500.00 |
7,000.00 |
1,300.00 |
2,600.00 |
2,000.00 |
4,000.00 |
| 702-05-C |
cross drain end treatment (1 barrel, 42" equiv. rcpa)
|
2   |
EACH |
2,000.00 |
4,000.00 |
4,300.00 |
8,600.00 |
1,400.00 |
2,800.00 |
2,500.00 |
5,000.00 |
| 702-05-D |
cross drain end treatment (1 barrel, 24" equiv. rcpa)
|
2   |
EACH |
1,800.00 |
3,600.00 |
1,300.00 |
2,600.00 |
900.00 |
1,800.00 |
1,750.00 |
3,500.00 |
| 702-05-E |
cross drain end treatment (1 barrel, 36" equiv. rcpa)
|
2   |
EACH |
2,100.00 |
4,200.00 |
3,400.00 |
6,800.00 |
1,400.00 |
2,800.00 |
2,200.00 |
4,400.00 |
| 702-05-F |
cross drain end treatment (2 barrels, 24" rcp/pcp)
|
2   |
EACH |
2,000.00 |
4,000.00 |
3,700.00 |
7,400.00 |
1,000.00 |
2,000.00 |
2,000.00 |
4,000.00 |
| 702-05-G |
cross drain end treatment (2 barrels, 36" rcp/pcp)
|
4   |
EACH |
2,400.00 |
9,600.00 |
5,200.00 |
20,800.00 |
2,000.00 |
8,000.00 |
2,000.00 |
8,000.00 |
| 702-05-H |
cross drain end treatment (2 barrels, 48" equiv. rcpa)
|
1   |
EACH |
4,400.00 |
4,400.00 |
5,400.00 |
5,400.00 |
3,000.00 |
3,000.00 |
4,500.00 |
4,500.00 |
| 702-05-I |
cross drain end treatment (2 barrels, 30" equiv. rcpa)
|
2   |
EACH |
2,200.00 |
4,400.00 |
4,800.00 |
9,600.00 |
2,500.00 |
5,000.00 |
2,300.00 |
4,600.00 |
| 702-05-J |
cross drain end treatment (2 barrels, 36" equiv. rcpa)
|
4   |
EACH |
1,200.00 |
4,800.00 |
5,200.00 |
20,800.00 |
2,400.00 |
9,600.00 |
2,500.00 |
10,000.00 |
| 702-05-K |
cross drain end treatment (3 barrels, 30" rcp/pcp)
|
2   |
EACH |
2,400.00 |
4,800.00 |
6,200.00 |
12,400.00 |
2,500.00 |
5,000.00 |
2,300.00 |
4,600.00 |
| 702-05-L |
cross drain end treatment (3 barrels, 36" rcp/pcp)
|
2   |
EACH |
2,700.00 |
5,400.00 |
6,800.00 |
13,600.00 |
3,400.00 |
6,800.00 |
2,500.00 |
5,000.00 |
| 702-05-M |
cross drain end treatment (3 barrels, 42" rcp/pcp)
|
4   |
EACH |
3,000.00 |
12,000.00 |
7,300.00 |
29,200.00 |
3,600.00 |
14,400.00 |
2,800.00 |
11,200.00 |
| 702-05-N |
cross drain end treatment (3 barrels, 48" rcp/pcp)
|
2   |
EACH |
3,500.00 |
7,000.00 |
8,000.00 |
16,000.00 |
4,500.00 |
9,000.00 |
3,200.00 |
6,400.00 |
| 702-05-O |
cross drain end treatment (3 barrels, 60" equiv. rcpa)
|
2   |
EACH |
5,500.00 |
11,000.00 |
10,000.00 |
20,000.00 |
7,000.00 |
14,000.00 |
6,000.00 |
12,000.00 |
| 702-07-B |
cross drain safety end (type 2)
|
1   |
EACH |
2,500.00 |
2,500.00 |
7,000.00 |
7,000.00 |
4,500.00 |
4,500.00 |
2,800.00 |
2,800.00 |
| 702-07-C |
cross drain safety end (type 3)
|
3   |
EACH |
3,500.00 |
10,500.00 |
6,000.00 |
18,000.00 |
8,000.00 |
24,000.00 |
5,500.00 |
16,500.00 |
| 702-08-A |
side drain safety end (type 1)
|
11   |
EACH |
1,200.00 |
13,200.00 |
1,100.00 |
12,100.00 |
1,400.00 |
15,400.00 |
1,000.00 |
11,000.00 |
| 705-01 |
barbed wire fence
|
7,007   |
LNFT |
5.50 |
38,538.50 |
5.50 |
38,538.50 |
4.00 |
28,028.00 |
5.00 |
35,035.00 |
| 705-02 |
combination mesh & barbed wire fence
|
549   |
LNFT |
6.00 |
3,294.00 |
6.25 |
3,431.25 |
5.50 |
3,019.50 |
5.75 |
3,156.75 |
| 705-04 |
single swinging driveway gates
|
4   |
EACH |
450.00 |
1,800.00 |
450.00 |
1,800.00 |
500.00 |
2,000.00 |
400.00 |
1,600.00 |
| 705-05 |
double swinging driveway gates
|
3   |
DBGT |
550.00 |
1,650.00 |
550.00 |
1,650.00 |
800.00 |
2,400.00 |
500.00 |
1,500.00 |
| 705-06-A |
chain link fence (4-foot height)
|
684   |
LNFT |
15.00 |
10,260.00 |
14.00 |
9,576.00 |
13.00 |
8,892.00 |
13.00 |
8,892.00 |
| 705-06-C |
chain link fence (6-foot height)
|
123   |
LNFT |
20.00 |
2,460.00 |
19.00 |
2,337.00 |
20.00 |
2,460.00 |
17.50 |
2,152.50 |
| 705-07-A |
4-foot single gates for chain link fence (4-foot
height) |
1   |
EACH |
800.00 |
800.00 |
800.00 |
800.00 |
700.00 |
700.00 |
750.00 |
750.00 |
| 705-09 |
rebuilt fence
|
452   |
LNFT |
17.00 |
7,684.00 |
16.00 |
7,232.00 |
16.00 |
7,232.00 |
15.00 |
6,780.00 |
| 706-02-C |
concrete drive (6" thick)
|
856.5 |
SQYD |
35.00 |
29,977.50 |
54.00 |
46,251.00 |
50.00 |
42,825.00 |
75.00 |
64,237.50 |
| 706-03-A |
incidental concrete paving (4" thick)
|
214.0 |
SQYD |
50.00 |
10,700.00 |
58.00 |
12,412.00 |
46.00 |
9,844.00 |
40.00 |
8,560.00 |
| 707-03 |
combination concrete curb & gutter
|
1,293.0 |
LNFT |
20.00 |
25,860.00 |
22.50 |
29,092.50 |
22.00 |
28,446.00 |
24.00 |
31,032.00 |
| 708-01 |
right-of-way monument
|
60   |
EACH |
300.00 |
18,000.00 |
110.00 |
6,600.00 |
120.00 |
7,200.00 |
200.00 |
12,000.00 |
| 708-02 |
right-of-way monument witness post
|
60   |
EACH |
300.00 |
18,000.00 |
110.00 |
6,600.00 |
120.00 |
7,200.00 |
90.00 |
5,400.00 |
| 711-01-B |
riprap (10 lb, 12" thick)
|
689   |
SQYD |
75.00 |
51,675.00 |
65.00 |
44,785.00 |
100.00 |
68,900.00 |
55.00 |
37,895.00 |
| 712-01-C |
concrete cast-in-place revetment (6" thick)
|
160   |
SQYD |
175.00 |
28,000.00 |
134.00 |
21,440.00 |
110.00 |
17,600.00 |
100.00 |
16,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
25,000.00 |
25,000.00 |
200,000.00 |
200,000.00 |
375,000.00 |
375,000.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
2,253   |
LNFT |
1.00 |
2,253.00 |
0.64 |
1,441.92 |
0.60 |
1,351.80 |
1.50 |
3,379.50 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
8.253 |
MILE |
550.00 |
4,539.15 |
138.00 |
1,138.91 |
800.00 |
6,602.40 |
250.00 |
2,063.25 |
| 713-04-A-01 |
temporary pavement markings (broken line)(4" width)(4'
length)(type 1 removable) |
0.250 |
MILE |
4,500.00 |
1,125.00 |
261.00 |
65.25 |
4,000.00 |
1,000.00 |
3,950.00 |
987.50 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
16.495 |
MILE |
800.00 |
13,196.00 |
536.00 |
8,841.32 |
500.00 |
8,247.50 |
650.00 |
10,721.75 |
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type 1 removable) |
0.250 |
MILE |
2,500.00 |
625.00 |
14,150.00 |
3,537.50 |
14,000.00 |
3,500.00 |
10,500.00 |
2,625.00 |
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
1   |
EACH |
60.00 |
60.00 |
43.00 |
43.00 |
40.00 |
40.00 |
200.00 |
200.00 |
| 713-06-B |
temporary pavement legends and symbols (double arrow)
|
4   |
EACH |
75.00 |
300.00 |
43.00 |
172.00 |
40.00 |
160.00 |
100.00 |
400.00 |
| 713-06-C |
temporary pavement legends and symbols (only)
|
3   |
EACH |
60.00 |
180.00 |
43.00 |
129.00 |
40.00 |
120.00 |
100.00 |
300.00 |
| 716-01-A |
mulch (vegetative)
|
17.28 |
ACRE |
650.00 |
11,232.00 |
650.00 |
11,232.00 |
600.00 |
10,368.00 |
650.00 |
11,232.00 |
| 717-01 |
seeding
|
2,933   |
LB |
8.00 |
23,464.00 |
7.50 |
21,997.50 |
7.00 |
20,531.00 |
7.00 |
20,531.00 |
| 718-01 |
fertilizer
|
97,800   |
LB |
0.40 |
39,120.00 |
0.38 |
37,164.00 |
0.25 |
24,450.00 |
0.25 |
24,450.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
82,005   |
SQYD |
1.00 |
82,005.00 |
1.00 |
82,005.00 |
1.10 |
90,205.50 |
1.25 |
102,506.25 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
20,000.00 |
20,000.00 |
5,000.00 |
5,000.00 |
30,000.00 |
30,000.00 |
27,000.00 |
27,000.00 |
| 724-01-C |
pavement patching (14" minimum thickness)
|
3,490   |
SQYD |
65.00 |
226,850.00 |
57.00 |
198,930.00 |
70.00 |
244,300.00 |
75.00 |
261,750.00 |
| 725-01 |
temporary detour roads
|
200.0 |
LNFT |
400.00 |
80,000.00 |
210.00 |
42,000.00 |
200.00 |
40,000.00 |
400.00 |
80,000.00 |
| 726-01 |
bedding material
|
1,994.7 |
CUYD |
40.00 |
79,788.00 |
59.00 |
117,687.30 |
55.00 |
109,708.50 |
90.00 |
179,523.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
750,000.00 |
750,000.00 |
1,000,000.00 |
1,000,000.00 |
1,400,000.00 |
1,400,000.00 |
1,500,000.00 |
1,500,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
44   |
EACH |
60.00 |
2,640.00 |
90.00 |
3,960.00 |
70.00 |
3,080.00 |
65.00 |
2,860.00 |
| 731-02 |
reflectorized raised pavement markers
|
2,437   |
EACH |
5.50 |
13,403.50 |
4.00 |
9,748.00 |
4.00 |
9,748.00 |
8.00 |
19,496.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
4,197   |
LNFT |
1.00 |
4,197.00 |
0.86 |
3,609.42 |
0.60 |
2,518.20 |
2.00 |
8,394.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
1,320   |
LNFT |
3.00 |
3,960.00 |
2.57 |
3,392.40 |
2.40 |
3,168.00 |
6.50 |
8,580.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
24.822 |
MILE |
2,500.00 |
62,055.00 |
2,000.00 |
49,644.00 |
2,000.00 |
49,644.00 |
3,350.00 |
83,153.70 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
20   |
EACH |
100.50 |
2,010.00 |
128.00 |
2,560.00 |
120.00 |
2,400.00 |
250.00 |
5,000.00 |
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
2   |
EACH |
225.00 |
450.00 |
128.00 |
256.00 |
120.00 |
240.00 |
550.00 |
1,100.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
18   |
EACH |
200.00 |
3,600.00 |
128.00 |
2,304.00 |
120.00 |
2,160.00 |
350.00 |
6,300.00 |
| 732-05 |
removal of existing markings
|
6.205 |
MILE |
5,000.00 |
31,025.00 |
2,500.00 |
15,512.50 |
2,400.00 |
14,892.00 |
4,150.00 |
25,750.75 |
| 735-01 |
mailboxes
|
84   |
EACH |
10.00 |
840.00 |
12.00 |
1,008.00 |
1.00 |
84.00 |
1.00 |
84.00 |
| 735-02 |
mailbox supports (single)
|
69   |
EACH |
150.00 |
10,350.00 |
150.00 |
10,350.00 |
130.00 |
8,970.00 |
125.00 |
8,625.00 |
| 735-03 |
mailbox supports (double)
|
6   |
EACH |
200.00 |
1,200.00 |
250.00 |
1,500.00 |
180.00 |
1,080.00 |
175.00 |
1,050.00 |
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
400.00 |
400.00 |
550.00 |
550.00 |
350.00 |
350.00 |
350.00 |
350.00 |
| 736-01 |
trenching and backfilling
|
50   |
LNFT |
5.50 |
275.00 |
6.00 |
300.00 |
5.00 |
250.00 |
5.00 |
250.00 |
| 736-04-A |
signal support (32' strain pole)
|
4   |
EACH |
6,500.00 |
26,000.00 |
6,500.00 |
26,000.00 |
6,000.00 |
24,000.00 |
6,000.00 |
24,000.00 |
| 736-05-A |
signal heads (1-section, 12" lens, led indication (r)
|
2   |
EACH |
550.00 |
1,100.00 |
550.00 |
1,100.00 |
500.00 |
1,000.00 |
500.00 |
1,000.00 |
| 736-05-B |
signal heads (1-section, 12" lens, led indication (y)
|
4   |
EACH |
550.00 |
2,200.00 |
550.00 |
2,200.00 |
500.00 |
2,000.00 |
500.00 |
2,000.00 |
| 736-06 |
signal service
|
1   |
EACH |
1,600.00 |
1,600.00 |
1,600.00 |
1,600.00 |
1,500.00 |
1,500.00 |
1,500.00 |
1,500.00 |
| 736-08-A |
signal controller (flasher)
|
1   |
EACH |
1,100.00 |
1,100.00 |
1,100.00 |
1,100.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
| 736-10-A |
underground junction box (type e)
|
2   |
EACH |
550.00 |
1,100.00 |
550.00 |
1,100.00 |
500.00 |
1,000.00 |
500.00 |
1,000.00 |
| 736-11-A |
conduit (2" schedule 80)
|
50   |
LNFT |
11.00 |
550.00 |
11.00 |
550.00 |
10.00 |
500.00 |
10.00 |
500.00 |
| 736-12-A |
conductor (3c power)
|
65   |
LNFT |
5.50 |
357.50 |
6.00 |
390.00 |
5.00 |
325.00 |
5.00 |
325.00 |
| 736-12-B |
conductor (4c signal)
|
330   |
LNFT |
2.20 |
726.00 |
2.25 |
742.50 |
2.00 |
660.00 |
2.00 |
660.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
200,000.00 |
200,000.00 |
50,000.00 |
50,000.00 |
250,000.00 |
250,000.00 |
340,000.00 |
340,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
30,000.00 |
30,000.00 |
10,000.00 |
10,000.00 |
30,000.00 |
30,000.00 |
125,000.00 |
125,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
10.59 |
CUYD |
1,500.00 |
15,885.00 |
965.00 |
10,219.35 |
1,200.00 |
12,708.00 |
1,000.00 |
10,590.00 |
| 805-12-C-01 |
reinforced concrete box culverts (extension)(6' x 3')
|
115.0 |
LNFT |
375.00 |
43,125.00 |
590.00 |
67,850.00 |
300.00 |
34,500.00 |
350.00 |
40,250.00 |
| 805-12-Y-01 |
reinforced concrete box culverts (extension)(6' x 2')
|
124.0 |
LNFT |
375.00 |
46,500.00 |
560.00 |
69,440.00 |
260.00 |
32,240.00 |
325.00 |
40,300.00 |
| 805-12-Z-01 |
reinforced concrete box culverts (extension)(4' x 2')
|
110.0 |
LNFT |
250.00 |
27,500.00 |
450.00 |
49,500.00 |
270.00 |
29,700.00 |
300.00 |
33,000.00 |
| 806-01 |
deformed reinforcing steel
|
997   |
LB |
0.80 |
797.60 |
2.00 |
1,994.00 |
2.00 |
1,994.00 |
7.00 |
6,979.00 |
| S-001 |
rumble strips (ground-in)
|
12.4 |
MILE |
1,000.00 |
12,400.00 |
1,200.00 |
14,880.00 |
700.00 |
8,680.00 |
555.00 |
6,882.00 |
| S-002 |
plugging existing water well
|
1   |
EACH |
5,500.00 |
5,500.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
1,500.00 |
1,500.00 |
| | SUBTOTAL GENERAL |
|
|
|
5,872,170.15 |
|
7,132,688.52 |
|
8,554,005.00 |
|
8,612,474.65 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
|
|
|
|
|
|
|
|
|
|
|
| 302-02-C-01 |
class ii base course (10" thick)(stone or recycled
pccp) |
47,879.2 |
SQYD |
18.00 |
861,825.60 |
20.00 |
957,584.00 |
17.00 |
813,946.40 |
27.00 |
1,292,738.40 |
| 302-02-E-01 |
class ii base course (4" thick)(stone or recycled pccp)
|
126,205.5 |
SQYD |
8.00 |
1,009,644.00 |
7.00 |
883,438.50 |
9.00 |
1,135,849.50 |
9.00 |
1,135,849.50 |
| 302-02-F-01 |
class ii base course (8" thick)(soil cement)
|
126,205.5 |
SQYD |
9.75 |
1,230,503.62 |
8.25 |
1,041,195.37 |
11.00 |
1,388,260.50 |
11.00 |
1,388,260.50 |
| 502-01 |
superpave asphaltic concrete
|
36,636.0 |
TON |
50.00 |
1,831,800.00 |
48.00 |
1,758,528.00 |
60.00 |
2,198,160.00 |
65.00 |
2,381,340.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
9,393.3 |
TON |
70.00 |
657,531.00 |
64.00 |
601,171.20 |
82.00 |
770,250.60 |
75.00 |
704,497.50 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
12.303 |
MILE |
700.00 |
8,612.10 |
800.00 |
9,842.40 |
750.00 |
9,227.25 |
1,200.00 |
14,763.60 |
| | SUBTOTAL ALT A1 |
|
|
|
5,599,916.32 |
|
5,251,759.47 |
|
6,315,694.25 |
|
6,917,449.50 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
|
|
|
|
|
|
|
|
|
|
|
| 302-02-C-01 |
class ii base course (10" thick)(stone or recycled
pccp) |
47,879.2 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 302-02-E-01 |
class ii base course (4" thick)(stone or recycled pccp)
|
126,205.5 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 302-02-F-01 |
class ii base course (8" thick)(soil cement)
|
126,205.5 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 502-01 |
superpave asphaltic concrete
|
4,758.0 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,241.0 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 601-01-G |
portland cement concrete pavement (8" thick)
|
96,600.0 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 601-02-G |
portland cement concrete pavement (8" thick)
(crossovers and turnouts) |
21,673.3 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 601-04 |
portland cement concrete pavement coring
|
63   |
EACH |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 732-03-A |
plastic pavement striping (broken line)(4"width)
|
6.098 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v) |
6.205 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
11,472,086.47 |
|
12,384,447.99 |
|
14,869,699.25 |
|
15,529,924.15 |
|