Letting of 9/14/2005 LA DOTD Headquarters


READV
go back
Go Back
 
Lead Project: 023-01-0049
Parish: RAPIDES, GRANT
Routes: US 167
Description: JCT. LA 3225 - BENTLEY
Type Const: grading, drain struct, lime trmt, class ii bc, superpave asp (alt. a-1), pccp (alt.
a-2), traffic signalization and related work.
 
RankLicenseBidderAmount
112312 GILCHRIST CONSTRUCTION CO. LLC $11,472,086.47
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $12,384,447.99
339462 DENTON-JAMES LLC $14,869,699.25
421810 HIGHWAY SPECIALISTS INC. $15,529,924.15
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
DENTON-JAMES LLC
- 4 -
HIGHWAY SPECIALISTS INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 200,000.00 200,000.00 550,000.00 550,000.00 1,000,000.00 1,000,000.00 300,000.00 300,000.00
202-01 removal of structures & obstructions lump      LUMP 40,000.00 40,000.00 28,000.00 28,000.00 200,000.00 200,000.00 100,000.00 100,000.00
202-02-B-01 removal of concrete box culvert (sta. 134+41; 1-3' x
2' and 1-4' x 2' x 64')
1      EACH 7,000.00 7,000.00 2,000.00 2,000.00 5,000.00 5,000.00 3,000.00 3,000.00
202-02-B-02 removal of concrete box culvert (sta. 158+58; 1-3' x
2' and 1-4' x 2' x 63')
1      EACH 7,000.00 7,000.00 2,000.00 2,000.00 5,000.00 5,000.00 3,000.00 3,000.00
202-02-B-03 removal of concrete box culvert (sta. 174+78; 4' x 3'
x 56')
1      EACH 3,500.00 3,500.00 2,000.00 2,000.00 4,000.00 4,000.00 3,000.00 3,000.00
202-02-B-04 removal of concrete box culvert (sta. 194+62; 4' x 2'
x 52')
1      EACH 3,500.00 3,500.00 2,000.00 2,000.00 3,000.00 3,000.00 6,000.00 6,000.00
202-02-B-05 removal of concrete box culvert (sta. 207+79; 4' x 2'
x 80')
1      EACH 3,500.00 3,500.00 2,000.00 2,000.00 4,000.00 4,000.00 3,000.00 3,000.00
202-02-B-06 removal of concrete box culvert (sta. 222+39; 3' x 3'
x 54')
1      EACH 3,500.00 3,500.00 2,000.00 2,000.00 3,000.00 3,000.00 3,000.00 3,000.00
202-02-B-07 removal of concrete box culvert (sta. 222+57; 6' x 4'
x 52')
1      EACH 3,500.00 3,500.00 2,000.00 2,000.00 5,000.00 5,000.00 6,000.00 6,000.00
202-02-B-08 removal of concrete box culvert (sta. 224+15; 5' x 2'
x 52')
1      EACH 3,500.00 3,500.00 2,000.00 2,000.00 4,000.00 4,000.00 3,000.00 3,000.00
202-02-B-09 removal of concrete box culvert (sta. 247+97; 4' x 3'
x 46')
1      EACH 3,500.00 3,500.00 2,000.00 2,000.00 4,000.00 4,000.00 3,000.00 3,000.00
202-02-B-10 removal of concrete box culvert (sta. 269+77; 3' x 3'
x 46')
1      EACH 3,500.00 3,500.00 2,000.00 2,000.00 3,000.00 3,000.00 3,000.00 3,000.00
202-02-B-11 removal of concrete box culvert (sta. 284+01; 4' x 2'
x 55')
1      EACH 3,500.00 3,500.00 2,000.00 2,000.00 3,000.00 3,000.00 3,000.00 3,000.00
202-02-B-12 removal of concrete box culvert (sta. 292+25; 4' x 4'
x 45')
1      EACH 3,500.00 3,500.00 3,000.00 3,000.00 5,000.00 5,000.00 3,000.00 3,000.00
202-02-B-13 removal of concrete box culvert (sta. 306+56; 4' x 3'
x 51')
1      EACH 3,500.00 3,500.00 3,000.00 3,000.00 4,000.00 4,000.00 3,000.00 3,000.00
202-02-B-14 removal of concrete box culvert (sta. 327+79; 4' x 3'
x 46')
1      EACH 3,500.00 3,500.00 3,000.00 3,000.00 4,000.00 4,000.00 3,000.00 3,000.00
202-02-B-15 removal of concrete box culvert (sta. 342+42; 3-5' x
5' x 50')
1      EACH 7,000.00 7,000.00 3,000.00 3,000.00 8,000.00 8,000.00 9,000.00 9,000.00
202-02-B-16 removal of concrete box culvert (sta. 374+80; 3' x 2'
x 53')
1      EACH 3,500.00 3,500.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00
202-02-B-17 removal of concrete box culvert (sta. 399+72; 3' x 2'
x 50')
1      EACH 3,500.00 3,500.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00
202-02-B-18 removal of concrete box culvert (sta. 429+00; 2' x 2'
x 49')
1      EACH 3,500.00 3,500.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00
202-02-C removal of portland cement concrete pavement 2,499      SQYD 4.50 11,245.50 3.00 7,497.00 10.00 24,990.00 12.00 29,988.00
202-02-D removal of concrete walks & drives 4,128      SQYD 3.00 12,384.00 6.00 24,768.00 8.00 33,024.00 10.00 41,280.00
202-02-G removal of surfacing & stabilized base 11,908.1    SQYD 4.00 47,632.40 6.00 71,448.60 5.00 59,540.50 12.00 142,897.20
202-02-01 removal of 13' x 13' wood office (lt. of sta. 162+49) 1      EACH 300.00 300.00 500.00 500.00 1.00 1.00 1.00 1.00
202-02-02 removal of 24' x 14' metal office (rt. of sta. 162+49) 1      EACH 300.00 300.00 500.00 500.00 1.00 1.00 1.00 1.00
202-02-03 removal of 50' x 26' metal canopy (lt. of sta. 163+89) 1      EACH 300.00 300.00 50.00 50.00 1.00 1.00 1.00 1.00
202-02-04 removal of 44' x 22' metal canopy (lt. of sta. 167+80) 1      EACH 300.00 300.00 50.00 50.00 1.00 1.00 1.00 1.00
202-02-05 removal of 50' x 25' wood frame residence (rt. of sta.
172+26)
1      EACH 300.00 300.00 500.00 500.00 1.00 1.00 1.00 1.00
202-02-06 removal of 70' x 35' wood frame residence (rt. of sta.
201+90)(contains non-friable asbestos)
1      EACH 6,500.00 6,500.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-07 removal of 30' x 30' metal shop (rt. of sta. 205+80) 1      EACH 2,000.00 2,000.00 1,000.00 1,000.00 1.00 1.00 1.00 1.00
202-02-08 removal of 70' x 30' brick residence (rt. of sta.
212+00)
1      EACH 4,000.00 4,000.00 500.00 500.00 1.00 1.00 1.00 1.00
202-02-09 removal of 44' x 28' wood frame residence (rt. of sta.
213+67)(contains non-friable asbestos)
1      EACH 300.00 300.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-10 removal of 43' x 20' wood frame residence (rt. of sta.
215+54)(contains non-friable asbestos)
1      EACH 6,500.00 6,500.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-11 removal of 14' x 10' wood shed (rt. of sta. 215+76) 1      EACH 1,000.00 1,000.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-12 removal of 106' x 36' wood frame residence (rt. of
sta. 217+69)
1      EACH 8,000.00 8,000.00 50.00 50.00 1.00 1.00 1.00 1.00
202-02-13 removal of 72' x 34' brick residence (rt. of sta.
220+36)
1      EACH 4,000.00 4,000.00 2,000.00 2,000.00 1.00 1.00 1.00 1.00
202-02-14 removal of 36' x 25' wood frame residence (rt. of sta.
227+43)
1      EACH 300.00 300.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-15 removal of 40' x 30' brick residence (rt. of sta.
230+13)(contains non-friable asbestos)
1      EACH 6,500.00 6,500.00 500.00 500.00 1.00 1.00 1.00 1.00
202-02-16 removal of 70' x 35' brick residence (rt. of sta.
232+50)(contains non-friable asbestos)
1      EACH 6,500.00 6,500.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-17 removal of 75' x 35' brick residence (rt. of sta.
234+61)(contains non-friable asbestos)
1      EACH 6,500.00 6,500.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-18 removal of traffic signal equipment (lt. & rt. of sta.
236+24)
1      EACH 2,200.00 2,200.00 2,000.00 2,000.00 1.00 1.00 2,000.00 2,000.00
202-02-19 removal of 50' x 40' brick residence (rt. of sta.
239+12)
1      EACH 2,000.00 2,000.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-20 removal of 83' x 30' brick residence (rt. of sta.
240+35)(contains non-friable asbestos)
1      EACH 6,500.00 6,500.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-21 removal of 38' x 30' wood frame residence (rt. of sta.
242+34)
1      EACH 300.00 300.00 500.00 500.00 1.00 1.00 1.00 1.00
202-02-22 removal of 55' x 30' wood frame residence (rt. of sta.
294+40)
1      EACH 2,000.00 2,000.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-23 removal of 60' x 40' brick residence (rt. of sta.
295+30)
1      EACH 2,000.00 2,000.00 500.00 500.00 1.00 1.00 1.00 1.00
202-02-24 removal of 60' x 27' wood frame residence (rt. of sta.
299+00)
1      EACH 2,000.00 2,000.00 500.00 500.00 1.00 1.00 1.00 1.00
202-02-25 removal of 50' x 25' wood frame residence (rt. of sta.
303+20)
1      EACH 4,000.00 4,000.00 500.00 500.00 1.00 1.00 1.00 1.00
202-02-26 removal of 12' x 10' metal shed (rt. of sta. 307+66) 1      EACH 1,000.00 1,000.00 500.00 500.00 1.00 1.00 1.00 1.00
202-02-27 removal of 75' x 31' brick residence (rt. of sta.
308+14)(contains non-friable asbestos)
1      EACH 6,500.00 6,500.00 1,000.00 1,000.00 1.00 1.00 1.00 1.00
202-02-28 removal of 7' x 5' metal shed (rt. of 317+32) 1      EACH 1,000.00 1,000.00 50.00 50.00 1.00 1.00 1.00 1.00
202-02-29 removal of 11' x 11' wood shed (rt. of sta. 317+50) 1      EACH 1,000.00 1,000.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-30 removal of 21' x 16' wood shed (rt. of sta. 317+60) 1      EACH 1,000.00 1,000.00 50.00 50.00 1.00 1.00 1.00 1.00
202-02-31 removal of 64' x 50' wood frame residence (rt. of sta.
319+16)
1      EACH 300.00 300.00 20.00 20.00 1.00 1.00 1.00 1.00
202-02-32 removal of 16' x 13' wood shed (rt. of sta. 320+36) 1      EACH 1,000.00 1,000.00 50.00 50.00 1.00 1.00 1.00 1.00
202-02-33 removal of 52' x 30' wood frame residence (rt. of sta.
320+90)(contains non-friable asbestos)
1      EACH 6,500.00 6,500.00 1,000.00 1,000.00 1.00 1.00 1.00 1.00
202-02-34 removal of 50' x 30' brick residence (rt. of sta.
323+00)
1      EACH 4,000.00 4,000.00 50.00 50.00 1.00 1.00 1.00 1.00
202-02-35 removal of 80' x 40' wood frame residence (rt. of sta.
364+65)
1      EACH 300.00 300.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-36 removal of 57' x 29' wood frame residence (rt. of sta.
369+06)
1      EACH 300.00 300.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-37 removal of 60' x 35' wood frame residence (rt. of sta.
395+17)(contains friable and non-friable asbestos)
1      EACH 6,500.00 6,500.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-38 removal of 16' x 10' fiberglass greenhouse(rt. of sta.
395+85)
1      EACH 1,000.00 1,000.00 1,000.00 1,000.00 1.00 1.00 1.00 1.00
202-02-39 removal of 21' x 21' wood shed (rt. of sta. 396+10) 1      EACH 1,000.00 1,000.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-40 removal of 12' x 10' wood shed (rt. of sta. 396+11) 1      EACH 1,000.00 1,000.00 50.00 50.00 1.00 1.00 1.00 1.00
202-02-41 removal of 52' x 28' brick residence (rt. of sta.
398+00)(contains friable asbestos)
1      EACH 6,500.00 6,500.00 50.00 50.00 1.00 1.00 1.00 1.00
202-02-42 removal of 58' x 28' wood frame residence (rt. of sta.
413+70)
1      EACH 2,000.00 2,000.00 50.00 50.00 1.00 1.00 1.00 1.00
202-02-43 removal of 23' x 61' brick residence (rt. of. sta.
184+50)(contains friable asbestos)
1      EACH 6,500.00 6,500.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-44 removal of 22' x 46' brick residence (rt. of. sta.
236+60)(contains friable asbestos)
1      EACH 6,500.00 6,500.00 500.00 500.00 1.00 1.00 1.00 1.00
203-01 general excavation 122,159      CUYD 3.50 427,556.50 5.00 610,795.00 6.00 732,954.00 6.50 794,033.50
203-02 drainage excavation 1,111      CUYD 5.00 5,555.00 11.00 12,221.00 13.00 14,443.00 8.50 9,443.50
203-04 embankment 152,923      CUYD 6.25 955,768.75 10.00 1,529,230.00 11.00 1,682,153.00 8.50 1,299,845.50
204-02 temporary hay or straw bales 320      EACH 15.00 4,800.00 10.00 3,200.00 7.00 2,240.00 6.00 1,920.00
204-03 temporary slope drains 3,381      LNFT 10.00 33,810.00 11.00 37,191.00 10.00 33,810.00 5.00 16,905.00
204-05-A temporary sediment check dams (hay) 115      EACH 150.00 17,250.00 75.00 8,625.00 100.00 11,500.00 125.00 14,375.00
204-06 temporary silt fencing 34,585      LNFT 1.75 60,523.75 2.00 69,170.00 1.30 44,960.50 1.75 60,523.75
204-07 temporary stone construction entrance 4      EACH 2,500.00 10,000.00 2,000.00 8,000.00 1,500.00 6,000.00 3,500.00 14,000.00
304-01 lime 894.43   TON 150.00 134,164.50 132.00 118,064.76 120.00 107,331.60 125.00 111,803.75
304-04-D lime treatment (type d) (12" thick) 70,988      SQYD 1.50 106,482.00 2.08 147,655.04 1.50 106,482.00 1.50 106,482.00
401-01 aggregate surface course (net section) 560.0    CUYD 50.00 28,000.00 62.00 34,720.00 50.00 28,000.00 90.00 50,400.00
402-01 traffic maintenance aggregate (vehicular measurement) 1,822.0    CUYD 35.00 63,770.00 35.00 63,770.00 60.00 109,320.00 80.00 145,760.00
701-01-G cross drain pipe (18" rcp/pcp) 1,434      LNFT 45.00 64,530.00 42.00 60,228.00 45.00 64,530.00 90.00 129,060.00
701-01-I cross drain pipe (24" rcp/pcp) 684      LNFT 60.00 41,040.00 59.00 40,356.00 60.00 41,040.00 95.00 64,980.00
701-01-K cross drain pipe (30" rcp/pcp) 600      LNFT 75.00 45,000.00 75.00 45,000.00 75.00 45,000.00 120.00 72,000.00
701-01-M cross drain pipe (36" rcp/pcp) 1,600      LNFT 90.00 144,000.00 96.00 153,600.00 90.00 144,000.00 155.00 248,000.00
701-01-N cross drain pipe (42" rcp/pcp) 1,185      LNFT 115.00 136,275.00 139.00 164,715.00 120.00 142,200.00 165.00 195,525.00
701-01-O cross drain pipe (48" rcp/pcp) 540      LNFT 145.00 78,300.00 177.00 95,580.00 150.00 81,000.00 190.00 102,600.00
701-02-D cross drain pipe arch (24" equiv. rcpa) 180      LNFT 75.00 13,500.00 70.00 12,600.00 75.00 13,500.00 130.00 23,400.00
701-02-E cross drain pipe arch (30" equiv. rcpa) 360      LNFT 90.00 32,400.00 91.00 32,760.00 85.00 30,600.00 140.00 50,400.00
701-02-F cross drain pipe arch (36" equiv. rcpa) 998      LNFT 105.00 104,790.00 112.00 111,776.00 110.00 109,780.00 150.00 149,700.00
701-02-G cross drain pipe arch (42" equiv. rcpa) 194      LNFT 125.00 24,250.00 150.00 29,100.00 130.00 25,220.00 170.00 32,980.00
701-02-H cross drain pipe arch (48" equiv. rcpa) 382      LNFT 150.00 57,300.00 182.00 69,524.00 160.00 61,120.00 190.00 72,580.00
701-02-J cross drain pipe arch (60" equiv. rcpa) 660      LNFT 215.00 141,900.00 220.00 145,200.00 250.00 165,000.00 250.00 165,000.00
701-05-G side drain pipe (18") 3,950      LNFT 40.00 158,000.00 43.00 169,850.00 40.00 158,000.00 30.00 118,500.00
701-05-I side drain pipe (24") 226      LNFT 60.00 13,560.00 59.00 13,334.00 50.00 11,300.00 35.00 7,910.00
701-10-I reinforced concrete pipe (extension)(24") 100      LNFT 65.00 6,500.00 80.00 8,000.00 80.00 8,000.00 135.00 13,500.00
702-02-C manholes (r-cb-11 mod) 2      EACH 4,500.00 9,000.00 4,300.00 8,600.00 3,500.00 7,000.00 4,000.00 8,000.00
702-03-A catch basins (cb-01) 10      EACH 3,000.00 30,000.00 3,400.00 34,000.00 3,000.00 30,000.00 3,200.00 32,000.00
702-03-B catch basins (cb-02) 9      EACH 5,000.00 45,000.00 4,500.00 40,500.00 3,500.00 31,500.00 4,000.00 36,000.00
702-03-E catch basins (cb-03) 8      EACH 2,000.00 16,000.00 4,000.00 32,000.00 2,500.00 20,000.00 2,000.00 16,000.00
702-05-A cross drain end treatment (2 barrel, 24" equiv. rcpa) 2      EACH 2,000.00 4,000.00 3,500.00 7,000.00 1,000.00 2,000.00 2,000.00 4,000.00
702-05-B cross drain end treatment (1 barrel, 36" rcp/pcp) 2      EACH 2,100.00 4,200.00 3,500.00 7,000.00 1,300.00 2,600.00 2,000.00 4,000.00
702-05-C cross drain end treatment (1 barrel, 42" equiv. rcpa) 2      EACH 2,000.00 4,000.00 4,300.00 8,600.00 1,400.00 2,800.00 2,500.00 5,000.00
702-05-D cross drain end treatment (1 barrel, 24" equiv. rcpa) 2      EACH 1,800.00 3,600.00 1,300.00 2,600.00 900.00 1,800.00 1,750.00 3,500.00
702-05-E cross drain end treatment (1 barrel, 36" equiv. rcpa) 2      EACH 2,100.00 4,200.00 3,400.00 6,800.00 1,400.00 2,800.00 2,200.00 4,400.00
702-05-F cross drain end treatment (2 barrels, 24" rcp/pcp) 2      EACH 2,000.00 4,000.00 3,700.00 7,400.00 1,000.00 2,000.00 2,000.00 4,000.00
702-05-G cross drain end treatment (2 barrels, 36" rcp/pcp) 4      EACH 2,400.00 9,600.00 5,200.00 20,800.00 2,000.00 8,000.00 2,000.00 8,000.00
702-05-H cross drain end treatment (2 barrels, 48" equiv. rcpa) 1      EACH 4,400.00 4,400.00 5,400.00 5,400.00 3,000.00 3,000.00 4,500.00 4,500.00
702-05-I cross drain end treatment (2 barrels, 30" equiv. rcpa) 2      EACH 2,200.00 4,400.00 4,800.00 9,600.00 2,500.00 5,000.00 2,300.00 4,600.00
702-05-J cross drain end treatment (2 barrels, 36" equiv. rcpa) 4      EACH 1,200.00 4,800.00 5,200.00 20,800.00 2,400.00 9,600.00 2,500.00 10,000.00
702-05-K cross drain end treatment (3 barrels, 30" rcp/pcp) 2      EACH 2,400.00 4,800.00 6,200.00 12,400.00 2,500.00 5,000.00 2,300.00 4,600.00
702-05-L cross drain end treatment (3 barrels, 36" rcp/pcp) 2      EACH 2,700.00 5,400.00 6,800.00 13,600.00 3,400.00 6,800.00 2,500.00 5,000.00
702-05-M cross drain end treatment (3 barrels, 42" rcp/pcp) 4      EACH 3,000.00 12,000.00 7,300.00 29,200.00 3,600.00 14,400.00 2,800.00 11,200.00
702-05-N cross drain end treatment (3 barrels, 48" rcp/pcp) 2      EACH 3,500.00 7,000.00 8,000.00 16,000.00 4,500.00 9,000.00 3,200.00 6,400.00
702-05-O cross drain end treatment (3 barrels, 60" equiv. rcpa) 2      EACH 5,500.00 11,000.00 10,000.00 20,000.00 7,000.00 14,000.00 6,000.00 12,000.00
702-07-B cross drain safety end (type 2) 1      EACH 2,500.00 2,500.00 7,000.00 7,000.00 4,500.00 4,500.00 2,800.00 2,800.00
702-07-C cross drain safety end (type 3) 3      EACH 3,500.00 10,500.00 6,000.00 18,000.00 8,000.00 24,000.00 5,500.00 16,500.00
702-08-A side drain safety end (type 1) 11      EACH 1,200.00 13,200.00 1,100.00 12,100.00 1,400.00 15,400.00 1,000.00 11,000.00
705-01 barbed wire fence 7,007      LNFT 5.50 38,538.50 5.50 38,538.50 4.00 28,028.00 5.00 35,035.00
705-02 combination mesh & barbed wire fence 549      LNFT 6.00 3,294.00 6.25 3,431.25 5.50 3,019.50 5.75 3,156.75
705-04 single swinging driveway gates 4      EACH 450.00 1,800.00 450.00 1,800.00 500.00 2,000.00 400.00 1,600.00
705-05 double swinging driveway gates 3      DBGT 550.00 1,650.00 550.00 1,650.00 800.00 2,400.00 500.00 1,500.00
705-06-A chain link fence (4-foot height) 684      LNFT 15.00 10,260.00 14.00 9,576.00 13.00 8,892.00 13.00 8,892.00
705-06-C chain link fence (6-foot height) 123      LNFT 20.00 2,460.00 19.00 2,337.00 20.00 2,460.00 17.50 2,152.50
705-07-A 4-foot single gates for chain link fence (4-foot
height)
1      EACH 800.00 800.00 800.00 800.00 700.00 700.00 750.00 750.00
705-09 rebuilt fence 452      LNFT 17.00 7,684.00 16.00 7,232.00 16.00 7,232.00 15.00 6,780.00
706-02-C concrete drive (6" thick) 856.5    SQYD 35.00 29,977.50 54.00 46,251.00 50.00 42,825.00 75.00 64,237.50
706-03-A incidental concrete paving (4" thick) 214.0    SQYD 50.00 10,700.00 58.00 12,412.00 46.00 9,844.00 40.00 8,560.00
707-03 combination concrete curb & gutter 1,293.0    LNFT 20.00 25,860.00 22.50 29,092.50 22.00 28,446.00 24.00 31,032.00
708-01 right-of-way monument 60      EACH 300.00 18,000.00 110.00 6,600.00 120.00 7,200.00 200.00 12,000.00
708-02 right-of-way monument witness post 60      EACH 300.00 18,000.00 110.00 6,600.00 120.00 7,200.00 90.00 5,400.00
711-01-B riprap (10 lb, 12" thick) 689      SQYD 75.00 51,675.00 65.00 44,785.00 100.00 68,900.00 55.00 37,895.00
712-01-C concrete cast-in-place revetment (6" thick) 160      SQYD 175.00 28,000.00 134.00 21,440.00 110.00 17,600.00 100.00 16,000.00
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00 25,000.00 25,000.00 200,000.00 200,000.00 375,000.00 375,000.00
713-03-E temporary pavement markings (24" width) 2,253      LNFT 1.00 2,253.00 0.64 1,441.92 0.60 1,351.80 1.50 3,379.50
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
8.253  MILE 550.00 4,539.15 138.00 1,138.91 800.00 6,602.40 250.00 2,063.25
713-04-A-01 temporary pavement markings (broken line)(4" width)(4'
length)(type 1 removable)
0.250  MILE 4,500.00 1,125.00 261.00 65.25 4,000.00 1,000.00 3,950.00 987.50
713-05-A temporary pavement markings (solid line)(4" width) 16.495  MILE 800.00 13,196.00 536.00 8,841.32 500.00 8,247.50 650.00 10,721.75
713-05-A-01 temporary pavement markings (solid line)(4" width)
(type 1 removable)
0.250  MILE 2,500.00 625.00 14,150.00 3,537.50 14,000.00 3,500.00 10,500.00 2,625.00
713-06-A temporary pavement legends and symbols (arrow) 1      EACH 60.00 60.00 43.00 43.00 40.00 40.00 200.00 200.00
713-06-B temporary pavement legends and symbols (double arrow) 4      EACH 75.00 300.00 43.00 172.00 40.00 160.00 100.00 400.00
713-06-C temporary pavement legends and symbols (only) 3      EACH 60.00 180.00 43.00 129.00 40.00 120.00 100.00 300.00
716-01-A mulch (vegetative) 17.28   ACRE 650.00 11,232.00 650.00 11,232.00 600.00 10,368.00 650.00 11,232.00
717-01 seeding 2,933      LB 8.00 23,464.00 7.50 21,997.50 7.00 20,531.00 7.00 20,531.00
718-01 fertilizer 97,800      LB 0.40 39,120.00 0.38 37,164.00 0.25 24,450.00 0.25 24,450.00
720-01-A erosion control system, slope protection (type a) 82,005      SQYD 1.00 82,005.00 1.00 82,005.00 1.10 90,205.50 1.25 102,506.25
722-02 project site laboratory (equipped) 1      EACH 20,000.00 20,000.00 5,000.00 5,000.00 30,000.00 30,000.00 27,000.00 27,000.00
724-01-C pavement patching (14" minimum thickness) 3,490      SQYD 65.00 226,850.00 57.00 198,930.00 70.00 244,300.00 75.00 261,750.00
725-01 temporary detour roads 200.0    LNFT 400.00 80,000.00 210.00 42,000.00 200.00 40,000.00 400.00 80,000.00
726-01 bedding material 1,994.7    CUYD 40.00 79,788.00 59.00 117,687.30 55.00 109,708.50 90.00 179,523.00
727-01 mobilization lump      LUMP 750,000.00 750,000.00 1,000,000.00 1,000,000.00 1,400,000.00 1,400,000.00 1,500,000.00 1,500,000.00
729-16-C object marker assembly (type 3) 44      EACH 60.00 2,640.00 90.00 3,960.00 70.00 3,080.00 65.00 2,860.00
731-02 reflectorized raised pavement markers 2,437      EACH 5.50 13,403.50 4.00 9,748.00 4.00 9,748.00 8.00 19,496.00
732-01-C plastic pavement striping (8" width) 4,197      LNFT 1.00 4,197.00 0.86 3,609.42 0.60 2,518.20 2.00 8,394.00
732-01-E plastic pavement striping (24" width) 1,320      LNFT 3.00 3,960.00 2.57 3,392.40 2.40 3,168.00 6.50 8,580.00
732-02-A plastic pavement striping (solid line) (4" width) 24.822  MILE 2,500.00 62,055.00 2,000.00 49,644.00 2,000.00 49,644.00 3,350.00 83,153.70
732-04-A plastic pavement legends & symbols (arrow) 20      EACH 100.50 2,010.00 128.00 2,560.00 120.00 2,400.00 250.00 5,000.00
732-04-B plastic pavement legends & symbols (double arrow) 2      EACH 225.00 450.00 128.00 256.00 120.00 240.00 550.00 1,100.00
732-04-C plastic pavement legends & symbols (only) 18      EACH 200.00 3,600.00 128.00 2,304.00 120.00 2,160.00 350.00 6,300.00
732-05 removal of existing markings 6.205  MILE 5,000.00 31,025.00 2,500.00 15,512.50 2,400.00 14,892.00 4,150.00 25,750.75
735-01 mailboxes 84      EACH 10.00 840.00 12.00 1,008.00 1.00 84.00 1.00 84.00
735-02 mailbox supports (single) 69      EACH 150.00 10,350.00 150.00 10,350.00 130.00 8,970.00 125.00 8,625.00
735-03 mailbox supports (double) 6      EACH 200.00 1,200.00 250.00 1,500.00 180.00 1,080.00 175.00 1,050.00
735-04 mailbox supports (multiple) 1      EACH 400.00 400.00 550.00 550.00 350.00 350.00 350.00 350.00
736-01 trenching and backfilling 50      LNFT 5.50 275.00 6.00 300.00 5.00 250.00 5.00 250.00
736-04-A signal support (32' strain pole) 4      EACH 6,500.00 26,000.00 6,500.00 26,000.00 6,000.00 24,000.00 6,000.00 24,000.00
736-05-A signal heads (1-section, 12" lens, led indication (r) 2      EACH 550.00 1,100.00 550.00 1,100.00 500.00 1,000.00 500.00 1,000.00
736-05-B signal heads (1-section, 12" lens, led indication (y) 4      EACH 550.00 2,200.00 550.00 2,200.00 500.00 2,000.00 500.00 2,000.00
736-06 signal service 1      EACH 1,600.00 1,600.00 1,600.00 1,600.00 1,500.00 1,500.00 1,500.00 1,500.00
736-08-A signal controller (flasher) 1      EACH 1,100.00 1,100.00 1,100.00 1,100.00 1,000.00 1,000.00 1,000.00 1,000.00
736-10-A underground junction box (type e) 2      EACH 550.00 1,100.00 550.00 1,100.00 500.00 1,000.00 500.00 1,000.00
736-11-A conduit (2" schedule 80) 50      LNFT 11.00 550.00 11.00 550.00 10.00 500.00 10.00 500.00
736-12-A conductor (3c power) 65      LNFT 5.50 357.50 6.00 390.00 5.00 325.00 5.00 325.00
736-12-B conductor (4c signal) 330      LNFT 2.20 726.00 2.25 742.50 2.00 660.00 2.00 660.00
740-01 construction layout lump      LUMP 200,000.00 200,000.00 50,000.00 50,000.00 250,000.00 250,000.00 340,000.00 340,000.00
744-01 traffic control management lump      LUMP 30,000.00 30,000.00 10,000.00 10,000.00 30,000.00 30,000.00 125,000.00 125,000.00
805-01-B class a concrete (box culvert headwalls) 10.59   CUYD 1,500.00 15,885.00 965.00 10,219.35 1,200.00 12,708.00 1,000.00 10,590.00
805-12-C-01 reinforced concrete box culverts (extension)(6' x 3') 115.0    LNFT 375.00 43,125.00 590.00 67,850.00 300.00 34,500.00 350.00 40,250.00
805-12-Y-01 reinforced concrete box culverts (extension)(6' x 2') 124.0    LNFT 375.00 46,500.00 560.00 69,440.00 260.00 32,240.00 325.00 40,300.00
805-12-Z-01 reinforced concrete box culverts (extension)(4' x 2') 110.0    LNFT 250.00 27,500.00 450.00 49,500.00 270.00 29,700.00 300.00 33,000.00
806-01 deformed reinforcing steel 997      LB 0.80 797.60 2.00 1,994.00 2.00 1,994.00 7.00 6,979.00
S-001 rumble strips (ground-in) 12.4    MILE 1,000.00 12,400.00 1,200.00 14,880.00 700.00 8,680.00 555.00 6,882.00
S-002 plugging existing water well 1      EACH 5,500.00 5,500.00 10,000.00 10,000.00 5,000.00 5,000.00 1,500.00 1,500.00
 SUBTOTAL GENERAL       5,872,170.15   7,132,688.52   8,554,005.00   8,612,474.65
                       
ALTERNATE A                      
                       
ALTERNATE A1                      
302-02-C-01 class ii base course (10" thick)(stone or recycled
pccp)
47,879.2    SQYD 18.00 861,825.60 20.00 957,584.00 17.00 813,946.40 27.00 1,292,738.40
302-02-E-01 class ii base course (4" thick)(stone or recycled pccp) 126,205.5    SQYD 8.00 1,009,644.00 7.00 883,438.50 9.00 1,135,849.50 9.00 1,135,849.50
302-02-F-01 class ii base course (8" thick)(soil cement) 126,205.5    SQYD 9.75 1,230,503.62 8.25 1,041,195.37 11.00 1,388,260.50 11.00 1,388,260.50
502-01 superpave asphaltic concrete 36,636.0    TON 50.00 1,831,800.00 48.00 1,758,528.00 60.00 2,198,160.00 65.00 2,381,340.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
9,393.3    TON 70.00 657,531.00 64.00 601,171.20 82.00 770,250.60 75.00 704,497.50
732-03-A plastic pavement striping (broken line)(4" width) 12.303  MILE 700.00 8,612.10 800.00 9,842.40 750.00 9,227.25 1,200.00 14,763.60
 SUBTOTAL ALT A1       5,599,916.32   5,251,759.47   6,315,694.25   6,917,449.50
                       
ALTERNATE A2                      
302-02-C-01 class ii base course (10" thick)(stone or recycled
pccp)
47,879.2    SQYD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
302-02-E-01 class ii base course (4" thick)(stone or recycled pccp) 126,205.5    SQYD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
302-02-F-01 class ii base course (8" thick)(soil cement) 126,205.5    SQYD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
502-01 superpave asphaltic concrete 4,758.0    TON 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
2,241.0    TON 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
601-01-G portland cement concrete pavement (8" thick) 96,600.0    SQYD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
601-02-G portland cement concrete pavement (8" thick)
(crossovers and turnouts)
21,673.3    SQYD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
601-04 portland cement concrete pavement coring 63      EACH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
732-03-A plastic pavement striping (broken line)(4"width) 6.098  MILE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v)
6.205  MILE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
                       
 CONTRACTOR TOTAL       11,472,086.47   12,384,447.99   14,869,699.25   15,529,924.15