Lead Project: 002-04-0037
Parish: MADISON
Routes: US 80
Description: RICHLAND PARISH LINE - ROUTE LA 577 EAST
Type Const: grading, drainage structures, pavement patching, cold planing asphaltic concrete,
asphaltic surface treatment, superpave asphaltic concrete overlay, and related work.
 
RankLicenseBidderAmount
105789 D & J CONSTRUCTION CO., INC. $1,535,162.88
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,589,782.01
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 5,000.00 5,000.00 20,000.00 20,000.00        
202-02-H removal of guard rail 480      LNFT 10.00 4,800.00 5.00 2,400.00        
203-08 borrow (vehicular measurement) 750      CUYD 40.00 30,000.00 20.00 15,000.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
1,012      CUYD 40.00 40,480.00 32.00 32,384.00        
502-01 superpave asphaltic concrete 8,881.5    TON 59.75 530,669.62 66.00 586,179.00        
502-01-A superpave asphaltic concrete, drives, turnouts, and
miscellaneous
454.2    TON 125.00 56,775.00 157.00 71,309.40        
507-01-B asphaltic surface treatment (2 applications) 53,175      SQYD 2.50 132,937.50 3.17 168,564.75        
509-01 cold planing asphaltic pavement 53,175      SQYD 2.00 106,350.00 1.50 79,762.50        
509-02 contractor retained reclaimed asphaltic pavement - 1,493      CUYD 0.01 - 14.93 0.10 - 149.30        
704-03 blocked out guard rail 150.0    LNFT 17.50 2,625.00 24.00 3,600.00        
704-07-A guard rail bridge attachments (single thrie beam) 80.0    LNFT 30.00 2,400.00 40.00 3,200.00        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 45.00 4,500.00 61.00 6,100.00        
704-11-A guard rail end treatment (flared) 4      EACH 2,000.00 8,000.00 2,700.00 10,800.00        
713-01 temporary signs & barricades lump      LUMP 90,000.00 90,000.00 8,000.00 8,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
11.403  MILE 165.00 1,881.49 177.00 2,018.33        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
11.403  MILE 190.00 2,166.57 340.00 3,877.02        
713-05-A temporary pavement markings (solid line)(4" width) 23.442  MILE 340.00 7,970.28 679.00 15,917.11        
713-07 temporary reflectorized raised pavement markers 498      EACH 1.25 622.50 2.00 996.00        
716-01-A mulch (vegetative) 3.61   ACRE 650.00 2,346.50 1,200.00 4,332.00        
717-01 seeding 162      LB 7.00 1,134.00 12.00 1,944.00        
718-01 fertilizer 3,610      LB 0.30 1,083.00 0.52 1,877.20        
724-01-C pavement patching (18" minimum thickness) 1,050      SQYD 125.00 131,250.00 120.00 126,000.00        
724-03 pavement joint repair 1,000.0    TON 75.00 75,000.00 125.00 125,000.00        
726-01 bedding material 45.5    CUYD 75.00 3,412.50 82.00 3,731.00        
727-01 mobilization lump      LUMP 134,000.00 134,000.00 150,000.00 150,000.00        
729-16-C object marker assembly (type 3) 16      EACH 65.00 1,040.00 88.00 1,408.00        
731-02 reflectorized raised pavement markers 503      EACH 7.50 3,772.50 6.00 3,018.00        
732-02-A plastic pavement striping (solid line) (4" width) 7.814  MILE 2,800.00 21,879.20 2,500.00 19,535.00        
732-03-A plastic pavement striping (broken line)(4" width) 3.801  MILE 1,150.00 4,371.15 1,000.00 3,801.00        
735-01 mailboxes 11      EACH 1.00 11.00 15.00 165.00        
735-02 mailbox supports (single) 5      EACH 190.00 950.00 150.00 750.00        
735-04 mailbox supports (multiple) 2      EACH 325.00 650.00 350.00 700.00        
740-01 construction layout lump      LUMP 15,000.00 15,000.00 15,000.00 15,000.00        
744-01 traffic control management lump      LUMP 20,000.00 20,000.00 20,000.00 20,000.00        
805-12-Y reinforced concrete box culverts (2'x 2') 66.0    LNFT 500.00 33,000.00 360.00 23,760.00        
805-12-Z reinforced concrete box culverts (3'x 2') 16.0    LNFT 500.00 8,000.00 425.00 6,800.00        
S-001 cleaning existing ditches 600      LNFT 10.00 6,000.00 7.00 4,200.00        
S-002 milling concrete approach slabs 62      SQYD 150.00 9,300.00 71.00 4,402.00        
S-003 tree trimming lump      LUMP 25,000.00 25,000.00 29,000.00 29,000.00        
S-004 clean and reseal stress relief joint 72      LNFT 150.00 10,800.00 200.00 14,400.00        
                       
 CONTRACTOR TOTAL       1,535,162.88   1,589,782.01        