| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
480   |
LNFT |
10.00 |
4,800.00 |
5.00 |
2,400.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
750   |
CUYD |
40.00 |
30,000.00 |
20.00 |
15,000.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,012   |
CUYD |
40.00 |
40,480.00 |
32.00 |
32,384.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
8,881.5 |
TON |
59.75 |
530,669.62 |
66.00 |
586,179.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
miscellaneous |
454.2 |
TON |
125.00 |
56,775.00 |
157.00 |
71,309.40 |
|
|
|
|
| 507-01-B |
asphaltic surface treatment (2 applications)
|
53,175   |
SQYD |
2.50 |
132,937.50 |
3.17 |
168,564.75 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
53,175   |
SQYD |
2.00 |
106,350.00 |
1.50 |
79,762.50 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,493   |
CUYD |
0.01 |
- 14.93 |
0.10 |
- 149.30 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
150.0 |
LNFT |
17.50 |
2,625.00 |
24.00 |
3,600.00 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
80.0 |
LNFT |
30.00 |
2,400.00 |
40.00 |
3,200.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
45.00 |
4,500.00 |
61.00 |
6,100.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,000.00 |
8,000.00 |
2,700.00 |
10,800.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
90,000.00 |
90,000.00 |
8,000.00 |
8,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
11.403 |
MILE |
165.00 |
1,881.49 |
177.00 |
2,018.33 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
11.403 |
MILE |
190.00 |
2,166.57 |
340.00 |
3,877.02 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
23.442 |
MILE |
340.00 |
7,970.28 |
679.00 |
15,917.11 |
|
|
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
498   |
EACH |
1.25 |
622.50 |
2.00 |
996.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
3.61 |
ACRE |
650.00 |
2,346.50 |
1,200.00 |
4,332.00 |
|
|
|
|
| 717-01 |
seeding
|
162   |
LB |
7.00 |
1,134.00 |
12.00 |
1,944.00 |
|
|
|
|
| 718-01 |
fertilizer
|
3,610   |
LB |
0.30 |
1,083.00 |
0.52 |
1,877.20 |
|
|
|
|
| 724-01-C |
pavement patching (18" minimum thickness)
|
1,050   |
SQYD |
125.00 |
131,250.00 |
120.00 |
126,000.00 |
|
|
|
|
| 724-03 |
pavement joint repair
|
1,000.0 |
TON |
75.00 |
75,000.00 |
125.00 |
125,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
45.5 |
CUYD |
75.00 |
3,412.50 |
82.00 |
3,731.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
134,000.00 |
134,000.00 |
150,000.00 |
150,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
65.00 |
1,040.00 |
88.00 |
1,408.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
503   |
EACH |
7.50 |
3,772.50 |
6.00 |
3,018.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.814 |
MILE |
2,800.00 |
21,879.20 |
2,500.00 |
19,535.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.801 |
MILE |
1,150.00 |
4,371.15 |
1,000.00 |
3,801.00 |
|
|
|
|
| 735-01 |
mailboxes
|
11   |
EACH |
1.00 |
11.00 |
15.00 |
165.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
5   |
EACH |
190.00 |
950.00 |
150.00 |
750.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
2   |
EACH |
325.00 |
650.00 |
350.00 |
700.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 805-12-Y |
reinforced concrete box culverts (2'x 2')
|
66.0 |
LNFT |
500.00 |
33,000.00 |
360.00 |
23,760.00 |
|
|
|
|
| 805-12-Z |
reinforced concrete box culverts (3'x 2')
|
16.0 |
LNFT |
500.00 |
8,000.00 |
425.00 |
6,800.00 |
|
|
|
|
| S-001 |
cleaning existing ditches
|
600   |
LNFT |
10.00 |
6,000.00 |
7.00 |
4,200.00 |
|
|
|
|
| S-002 |
milling concrete approach slabs
|
62   |
SQYD |
150.00 |
9,300.00 |
71.00 |
4,402.00 |
|
|
|
|
| S-003 |
tree trimming
|
lump |
LUMP |
25,000.00 |
25,000.00 |
29,000.00 |
29,000.00 |
|
|
|
|
| S-004 |
clean and reseal stress relief joint
|
72   |
LNFT |
150.00 |
10,800.00 |
200.00 |
14,400.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,535,162.88 |
|
1,589,782.01 |
|
|
|
|
|