| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BEST-YET BUILDERS, LLC |
- 2 - F. J. BURNELL, INC. |
- 3 - BLOUNT BROS. CONSTRUCTION, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
100,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
30,000.00 |
30,000.00 |
40,000.00 |
40,000.00 |
100,000.00 |
100,000.00 |
|
|
| 202-02-B |
removal of concrete box culverts
|
1   |
ea |
5,000.00 |
5,000.00 |
7,500.00 |
7,500.00 |
25,000.00 |
25,000.00 |
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
1,920   |
sq m |
5.98 |
11,481.60 |
7.00 |
13,440.00 |
10.00 |
19,200.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
2,435   |
sq m |
12.00 |
29,220.00 |
6.00 |
14,610.00 |
10.00 |
24,350.00 |
|
|
| 202-02-E |
removal of concrete curbs
|
151.6 |
ln m |
16.40 |
2,486.24 |
10.00 |
1,516.00 |
20.00 |
3,032.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
6,555.1 |
sq m |
4.78 |
31,333.37 |
4.50 |
29,497.95 |
9.00 |
58,995.90 |
|
|
| 202-02-I |
removal of existing signal equipment
|
lump |
lump |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-01 |
removal of pavement structure (asphalt concrete over
portland cement concre te pavement) |
9,096   |
sq m |
8.37 |
76,133.52 |
5.00 |
45,480.00 |
12.00 |
109,152.00 |
|
|
| 202-02-02 |
removal of asphaltic concrete over untreated base
(306 mm - 380 mm) |
4,231   |
sq m |
8.37 |
35,413.47 |
3.60 |
15,231.60 |
10.00 |
42,310.00 |
|
|
| 202-02-03 |
removal of mixed building (18' x 60', sta. 4+950 lt.)
|
1   |
ea |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
1,200.00 |
1,200.00 |
|
|
| 202-02-04 |
removal of metal sign (4' x 6', sta. 4+950 lt., on top
of building) |
1   |
ea |
750.00 |
750.00 |
500.00 |
500.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-05 |
removal of wood frame building (70' x 60', sta.
5+000 lt.) |
1   |
ea |
750.00 |
750.00 |
4,000.00 |
4,000.00 |
30,000.00 |
30,000.00 |
|
|
| 202-02-06 |
removal of wood frame building (50' x 80', sta.
5+025 lt.) |
1   |
ea |
750.00 |
750.00 |
5,000.00 |
5,000.00 |
28,000.00 |
28,000.00 |
|
|
| 202-02-07 |
removal of wood sign (4' x 8', sta. 5+025 lt.)
|
1   |
ea |
200.00 |
200.00 |
500.00 |
500.00 |
1,000.00 |
1,000.00 |
|
|
| 202-02-08 |
removal of sign (3' x 6', sta. 5+050 lt.)
|
1   |
ea |
250.00 |
250.00 |
500.00 |
500.00 |
2,000.00 |
2,000.00 |
|
|
| 202-02-09 |
removal of mixed building (24' x 50', sta. 5+050 lt.)
|
1   |
ea |
1,000.00 |
1,000.00 |
2,500.00 |
2,500.00 |
8,500.00 |
8,500.00 |
|
|
| 202-02-10 |
removal of wood frame building (20' x 22', sta.
5+080 lt.) |
1   |
ea |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
4,000.00 |
4,000.00 |
|
|
| 202-02-11 |
removal of cinder block building (42' x 84', sta.
5+100 lt.) |
1   |
ea |
1,000.00 |
1,000.00 |
5,000.00 |
5,000.00 |
35,000.00 |
35,000.00 |
|
|
| 202-02-12 |
removal of wood sign (4' x 16', sta. 5+100 lt.,
attached to building) |
1   |
ea |
150.00 |
150.00 |
500.00 |
500.00 |
20,000.00 |
20,000.00 |
|
|
| 202-02-13 |
removal of wood frame building (28' x 60', sta.
5+280 lt.) |
1   |
ea |
1,000.00 |
1,000.00 |
3,000.00 |
3,000.00 |
10,000.00 |
10,000.00 |
|
|
| 202-02-14 |
removal of sign (3' x 5', sta. 5+280 lt.)
|
1   |
ea |
250.00 |
250.00 |
500.00 |
500.00 |
2,000.00 |
2,000.00 |
|
|
| 202-02-15 |
removal of brick veneer building (28' x 50', sta.
10+180 rt.) |
1   |
ea |
1,000.00 |
1,000.00 |
2,500.00 |
2,500.00 |
14,000.00 |
14,000.00 |
|
|
| 202-02-16 |
removal of wood frame residence (24' x 30', sta.
10+180 lt.) |
1   |
ea |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
5,000.00 |
5,000.00 |
|
|
| 203-01 |
general excavation
|
29,248   |
cu m |
5.00 |
146,240.00 |
7.85 |
229,596.80 |
13.00 |
380,224.00 |
|
|
| 203-03 |
muck excavation
|
480   |
cu m |
12.00 |
5,760.00 |
13.00 |
6,240.00 |
15.00 |
7,200.00 |
|
|
| 203-04 |
embankment
|
2,545   |
cu m |
9.81 |
24,966.45 |
9.00 |
22,905.00 |
13.00 |
33,085.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
6   |
ea |
175.00 |
1,050.00 |
250.00 |
1,500.00 |
500.00 |
3,000.00 |
|
|
| 204-06 |
temporary silt fencing
|
3,500   |
ln m |
1.64 |
5,740.00 |
5.00 |
17,500.00 |
4.00 |
14,000.00 |
|
|
| 204-07 |
temporary stone construction entrance
|
1   |
ea |
1,000.00 |
1,000.00 |
2,500.00 |
2,500.00 |
4,000.00 |
4,000.00 |
|
|
| 302-02-E |
class ii base course (305 mm thick)
|
38,058.9 |
sq m |
19.00 |
723,119.10 |
21.00 |
799,236.90 |
24.00 |
913,413.60 |
|
|
| 304-01 |
lime
|
278.43 |
Mg |
115.00 |
32,019.45 |
120.00 |
33,411.60 |
150.00 |
41,764.50 |
|
|
| 304-04-D |
lime treatment (type d) (300 mm thick)
|
18,415   |
sq m |
3.00 |
55,245.00 |
3.60 |
66,294.00 |
10.00 |
184,150.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,000.0 |
cu m |
0.65 |
650.00 |
33.00 |
33,000.00 |
50.00 |
50,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
614.4 |
Mg |
66.14 |
40,636.41 |
170.00 |
104,448.00 |
80.00 |
49,152.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
1,297   |
sq m |
2.99 |
3,878.03 |
4.50 |
5,836.50 |
7.00 |
9,079.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 65   |
cu m |
0.10 |
- 6.50 |
1.00 |
- 65.00 |
1.00 |
- 65.00 |
|
|
| 601-01 |
portland cement concrete pavement (230 mm thick)
|
35,372.2 |
sq m |
63.00 |
2,228,448.60 |
53.00 |
1,874,726.60 |
60.00 |
2,122,332.00 |
|
|
| 701-01-Q |
cross drain pipe (1500 mm rcp/pcp)
|
120.0 |
ln m |
750.00 |
90,000.00 |
625.00 |
75,000.00 |
900.00 |
108,000.00 |
|
|
| 701-03-F |
storm drain pipe (375 mm rcp/pcp)
|
1,991.2 |
ln m |
115.00 |
228,988.00 |
98.50 |
196,133.20 |
90.00 |
179,208.00 |
|
|
| 701-03-G |
storm drain pipe (450 mm rcp/pcp)
|
157.6 |
ln m |
140.00 |
22,064.00 |
108.00 |
17,020.80 |
100.00 |
15,760.00 |
|
|
| 701-03-I |
storm drain pipe (600 mm rcp/pcp)
|
54.8 |
ln m |
180.00 |
9,864.00 |
155.00 |
8,494.00 |
160.00 |
8,768.00 |
|
|
| 701-03-K |
storm drain pipe (750 mm rcp/pcp)
|
316.5 |
ln m |
210.00 |
66,465.00 |
250.00 |
79,125.00 |
220.00 |
69,630.00 |
|
|
| 702-02-F |
manholes (mh-01-m)
|
2   |
ea |
3,200.00 |
6,400.00 |
7,500.00 |
15,000.00 |
5,000.00 |
10,000.00 |
|
|
| 702-03-A |
catch basins (cb-01m)
|
1   |
ea |
2,800.00 |
2,800.00 |
3,000.00 |
3,000.00 |
5,000.00 |
5,000.00 |
|
|
| 702-03-C |
catch basins (cb-06m)
|
25   |
ea |
3,200.00 |
80,000.00 |
3,500.00 |
87,500.00 |
6,000.00 |
150,000.00 |
|
|
| 702-03-D |
catch basins (cb-07m)
|
30   |
ea |
4,300.00 |
129,000.00 |
4,200.00 |
126,000.00 |
6,000.00 |
180,000.00 |
|
|
| 702-03-F |
catch basins (cb-08m)
|
21   |
ea |
5,000.00 |
105,000.00 |
5,000.00 |
105,000.00 |
7,000.00 |
147,000.00 |
|
|
| 706-01-A |
concrete walk (100 mm thick)
|
1,392.1 |
sq m |
41.86 |
58,273.30 |
31.00 |
43,155.10 |
48.00 |
66,820.80 |
|
|
| 706-02-C |
concrete drive (150 mm thick)
|
1,575.6 |
sq m |
53.82 |
84,798.79 |
40.00 |
63,024.00 |
50.00 |
78,780.00 |
|
|
| 706-03-C |
incidental concrete paving (150 mm thick)
|
752.8 |
sq m |
47.84 |
36,013.95 |
36.00 |
27,100.80 |
50.00 |
37,640.00 |
|
|
| 707-01 |
concrete curb
|
3,767.1 |
ln m |
20.00 |
75,342.00 |
13.00 |
48,972.30 |
22.00 |
82,876.20 |
|
|
| 708-01 |
right-of-way monument
|
84   |
ea |
231.00 |
19,404.00 |
230.00 |
19,320.00 |
250.00 |
21,000.00 |
|
|
| 711-02-D |
riprap (25 kg)
|
55   |
cu m |
85.00 |
4,675.00 |
72.00 |
3,960.00 |
60.00 |
3,300.00 |
|
|
| 711-04 |
geotextile fabric
|
80   |
sq m |
2.00 |
160.00 |
5.00 |
400.00 |
4.00 |
320.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
70,000.00 |
70,000.00 |
150,000.00 |
150,000.00 |
100,000.00 |
100,000.00 |
|
|
| 713-05-A |
temporary pavement markings (solid line) (100 mm width)
|
5.000 |
km |
432.00 |
2,160.00 |
450.00 |
2,250.00 |
100.00 |
500.00 |
|
|
| 713-05-A-01 |
temporary pavement markings (solid line) (100 mm width)
(type 1 removable) |
3.000 |
km |
9,000.00 |
27,000.00 |
9,000.00 |
27,000.00 |
14,000.00 |
42,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
2.6 |
hctr |
1,500.00 |
3,900.00 |
3,000.00 |
7,800.00 |
3,000.00 |
7,800.00 |
|
|
| 717-01 |
seeding
|
150   |
kg |
15.00 |
2,250.00 |
17.50 |
2,625.00 |
10.00 |
1,500.00 |
|
|
| 718-01 |
fertilizer
|
2,800   |
kg |
0.60 |
1,680.00 |
0.65 |
1,820.00 |
1.00 |
2,800.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
ea |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
35,000.00 |
35,000.00 |
|
|
| 724-02 |
pavement widening
|
391.0 |
sq m |
50.00 |
19,550.00 |
110.00 |
43,010.00 |
50.00 |
19,550.00 |
|
|
| 725-01 |
temporary detour roads
|
575.0 |
ln m |
275.00 |
158,125.00 |
300.00 |
172,500.00 |
500.00 |
287,500.00 |
|
|
| 726-01 |
bedding material
|
600.0 |
cu m |
55.00 |
33,000.00 |
65.00 |
39,000.00 |
60.00 |
36,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
160,000.00 |
160,000.00 |
325,000.00 |
325,000.00 |
400,000.00 |
400,000.00 |
|
|
| 729-01-A |
sign (type a) (r1-2, 914 mm x 914 mm, 2 each)
|
0.72 |
sq m |
935.00 |
673.20 |
1,000.00 |
720.00 |
1,000.00 |
720.00 |
|
|
| 729-01-D |
sign (type a) (r3-5r, 762 mm x 914 mm, 1 each)
|
0.70 |
sq m |
935.00 |
654.50 |
1,000.00 |
700.00 |
1,000.00 |
700.00 |
|
|
| 729-01-G |
sign (type a) (r10-12, 610 mm x 762 mm, 4 each)
|
1.86 |
sq m |
935.00 |
1,739.10 |
1,000.00 |
1,860.00 |
1,000.00 |
1,860.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
ea |
80.00 |
320.00 |
85.00 |
340.00 |
150.00 |
600.00 |
|
|
| 729-19-A |
dead end road installations (type a)
|
1   |
ea |
4,000.00 |
4,000.00 |
3,500.00 |
3,500.00 |
5,000.00 |
5,000.00 |
|
|
| 729-21 |
u-channel post
|
2   |
ea |
80.00 |
160.00 |
100.00 |
200.00 |
50.00 |
100.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,865   |
ea |
5.00 |
14,325.00 |
5.50 |
15,757.50 |
8.00 |
22,920.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (100 mm width)
|
7.768 |
km |
1,359.00 |
10,556.71 |
1,400.00 |
10,875.20 |
18,000.00 |
139,824.00 |
|
|
| 732-02-C |
plastic pavement striping (solid line) (200 mm width)
|
0.510 |
km |
2,700.00 |
1,377.00 |
2,800.00 |
1,428.00 |
5,000.00 |
2,550.00 |
|
|
| 732-02-D |
plastic pavement striping (solid line) (300 mm width)
|
0.025 |
km |
4,000.00 |
100.00 |
5,000.00 |
125.00 |
6,500.00 |
162.50 |
|
|
| 732-02-E |
plastic pavement striping (solid line) (600 mm width)
|
0.222 |
km |
8,000.00 |
1,776.00 |
8,300.00 |
1,842.60 |
12,000.00 |
2,664.00 |
|
|
| 732-03-A-01 |
plastic pvmt striping (broken line) (100 mm width)
preformed marking tape (type v) |
3.631 |
km |
2,700.00 |
9,803.70 |
2,800.00 |
10,166.80 |
6,000.00 |
21,786.00 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
26   |
ea |
160.00 |
4,160.00 |
165.00 |
4,290.00 |
200.00 |
5,200.00 |
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
40   |
ea |
230.00 |
9,200.00 |
240.00 |
9,600.00 |
300.00 |
12,000.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
14   |
ea |
180.00 |
2,520.00 |
185.00 |
2,590.00 |
300.00 |
4,200.00 |
|
|
| 736-01 |
trenching and backfilling
|
190   |
ln m |
11.00 |
2,090.00 |
12.00 |
2,280.00 |
11.00 |
2,090.00 |
|
|
| 736-03-A |
jacked or bored conduit (50.8 mm p.e.c.)
|
2,312   |
ln m |
41.80 |
96,641.60 |
43.00 |
99,416.00 |
50.00 |
115,600.00 |
|
|
| 736-03-B |
jacked or bored conduit (76.2 mm p.e.c.)
|
70   |
ln m |
88.00 |
6,160.00 |
90.00 |
6,300.00 |
55.00 |
3,850.00 |
|
|
| 736-04-A |
signal support (mast arm standard w/15.2 m arm)
|
1   |
ea |
10,780.00 |
10,780.00 |
11,000.00 |
11,000.00 |
12,000.00 |
12,000.00 |
|
|
| 736-04-B |
signal support (mast arm standard w/16.8 m arm)
|
3   |
ea |
12,650.00 |
37,950.00 |
13,000.00 |
39,000.00 |
14,000.00 |
42,000.00 |
|
|
| 736-05-A |
signal heads (3-section, r,y,g) led
|
8   |
ea |
1,390.00 |
11,120.00 |
1,500.00 |
12,000.00 |
2,000.00 |
16,000.00 |
|
|
| 736-05-B |
signal heads (5-section, r,lty,y,ltg,g) led
|
4   |
ea |
2,100.00 |
8,400.00 |
2,200.00 |
8,800.00 |
2,000.00 |
8,000.00 |
|
|
| 736-05-C |
signal heads (5-section, r,rty,y,rtg,g) led
|
1   |
ea |
2,200.00 |
2,200.00 |
2,300.00 |
2,300.00 |
2,000.00 |
2,000.00 |
|
|
| 736-06 |
signal service (pole mounted)
|
1   |
ea |
2,200.00 |
2,200.00 |
2,300.00 |
2,300.00 |
2,500.00 |
2,500.00 |
|
|
| 736-08 |
signal controller (8 phase nema controller in a base
mounted type 6 control ler cabinet) |
1   |
ea |
17,000.00 |
17,000.00 |
18,000.00 |
18,000.00 |
16,000.00 |
16,000.00 |
|
|
| 736-09 |
loop detector
|
60   |
ln m |
60.00 |
3,600.00 |
62.00 |
3,720.00 |
60.00 |
3,600.00 |
|
|
| 736-10-A |
underground junction box (type "e")
|
31   |
ea |
275.00 |
8,525.00 |
280.00 |
8,680.00 |
550.00 |
17,050.00 |
|
|
| 736-10-B |
underground junction box (type "f")
|
4   |
ea |
400.00 |
1,600.00 |
410.00 |
1,640.00 |
700.00 |
2,800.00 |
|
|
| 736-10-C |
underground junction box (type "h")
|
2   |
ea |
500.00 |
1,000.00 |
520.00 |
1,040.00 |
1,000.00 |
2,000.00 |
|
|
| 736-11-A |
conduit (12.7 mm p.e.c.)
|
12   |
ln m |
8.00 |
96.00 |
50.00 |
600.00 |
9.00 |
108.00 |
|
|
| 736-11-B |
conduit (50.8 mm p.e.c.)
|
160   |
ln m |
11.00 |
1,760.00 |
11.00 |
1,760.00 |
19.00 |
3,040.00 |
|
|
| 736-11-C |
conduit (76.2 mm p.e.c.)
|
15   |
ln m |
35.00 |
525.00 |
50.00 |
750.00 |
20.00 |
300.00 |
|
|
| 736-12-A |
conductor (2c, loop lead-in)
|
285   |
ln m |
4.00 |
1,140.00 |
3.75 |
1,068.75 |
9.00 |
2,565.00 |
|
|
| 736-12-B |
conductor (3c, power)
|
5   |
ln m |
22.00 |
110.00 |
50.00 |
250.00 |
55.00 |
275.00 |
|
|
| 736-12-D |
conductor (10c, signal, #14 awg)
|
540   |
ln m |
21.00 |
11,340.00 |
21.50 |
11,610.00 |
5.00 |
2,700.00 |
|
|
| 736-12-E |
conductor (12c, interconnect)
|
2,400   |
ln m |
5.00 |
12,000.00 |
4.80 |
11,520.00 |
6.00 |
14,400.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
90,000.00 |
90,000.00 |
95,000.00 |
95,000.00 |
150,000.00 |
150,000.00 |
|
|
| 741-09 |
adjusting water house connections
|
10   |
ea |
300.00 |
3,000.00 |
450.00 |
4,500.00 |
1,500.00 |
15,000.00 |
|
|
| 741-10 |
adjusting water service lines
|
100   |
ln m |
20.00 |
2,000.00 |
60.00 |
6,000.00 |
30.00 |
3,000.00 |
|
|
| 742-01 |
sanitary sewer pipe (200 mm)
|
22   |
ln m |
55.00 |
1,210.00 |
200.00 |
4,400.00 |
80.00 |
1,760.00 |
|
|
| 742-02 |
adjusting sanitary sewer house connections
|
10   |
ea |
450.00 |
4,500.00 |
550.00 |
5,500.00 |
1,500.00 |
15,000.00 |
|
|
| 742-03 |
adjusting sanitary sewer service lines
|
100   |
ln m |
45.00 |
4,500.00 |
80.00 |
8,000.00 |
60.00 |
6,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
lump |
25,000.00 |
25,000.00 |
15,000.00 |
15,000.00 |
30,000.00 |
30,000.00 |
|
|
| 805-01-A |
class a concrete (pipe headwalls)
|
27.71 |
cu m |
850.00 |
23,553.50 |
850.00 |
23,553.50 |
1,500.00 |
41,565.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
1,038   |
kg |
1.50 |
1,557.00 |
1.55 |
1,608.90 |
4.00 |
4,152.00 |
|
|
| S-001 |
plug and abandon existing reinforced concrete pipe
(flowable fill to be included) |
1   |
ea |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
10,000.00 |
10,000.00 |
|
|
| S-002 |
video detection device and connection
|
4   |
ea |
7,000.00 |
28,000.00 |
8,000.00 |
32,000.00 |
9,000.00 |
36,000.00 |
|
|
| S-003 |
video detection system
|
1   |
ea |
5,200.00 |
5,200.00 |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
5,599,951.09 |
|
5,707,708.40 |
|
7,368,469.50 |
|
|
|