| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - GILBERTSOUTH/MASSMAN/TRAYLOR, JT VT |
- 3 - FLATIRON CONST/JAMES CONST, A JT VT |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 713-01-A |
temporary signs and barricades (phase i)
|
lump |
LUMP |
200,000.00 |
200,000.00 |
200,000.00 |
200,000.00 |
350,000.00 |
350,000.00 |
|
|
| 727-01-A |
mobilization (phase i)
|
lump |
LUMP |
1,000,000.00 |
1,000,000.00 |
3,700,000.00 |
3,700,000.00 |
21,100,000.00 |
21,100,000.00 |
|
|
| 731-01-A |
nonreflectorized raised pavement markers (phase i)
|
6,380   |
EACH |
14.00 |
89,320.00 |
12.00 |
76,560.00 |
14.00 |
89,320.00 |
|
|
| 731-02-A |
reflectorized raised pavement markers (phase i)
|
5,440   |
EACH |
7.00 |
38,080.00 |
5.90 |
32,096.00 |
7.00 |
38,080.00 |
|
|
| 732-02-A-01 |
plastic pavement striping (solid line) (4" width)
(phase i) |
16.220 |
MILE |
2,500.00 |
40,550.00 |
2,112.00 |
34,256.64 |
2,500.00 |
40,550.00 |
|
|
| 732-05-A |
removal of existing markings (phase i)
|
5.410 |
MILE |
3,600.00 |
19,476.00 |
3,200.00 |
17,312.00 |
3,500.00 |
18,935.00 |
|
|
| S-001 |
engineering services (phase i)
|
lump |
LUMP |
350,000.00 |
350,000.00 |
400,000.00 |
400,000.00 |
1,530,000.00 |
1,530,000.00 |
|
|
| S-002 |
65 ft. span relocation (westbound to eastbound) (phase
i) |
38   |
EACH |
20,000.00 |
760,000.00 |
55,000.00 |
2,090,000.00 |
326,000.00 |
12,388,000.00 |
|
|
| S-003 |
65 ft. span eastbound realignment (phase i)
|
170   |
EACH |
18,000.00 |
3,060,000.00 |
16,000.00 |
2,720,000.00 |
110,000.00 |
18,700,000.00 |
|
|
| S-004 |
reinstall existing undamaged 65 ft. eastbound span
(phase i) |
5   |
EACH |
FREE |
FREE |
FREE |
FREE |
FREE |
FREE |
|
|
| S-005 |
concrete bridge deck repair (phase i)
|
140   |
CF |
1,200.00 |
168,000.00 |
590.00 |
82,600.00 |
1,000.00 |
140,000.00 |
|
|
| S-006 |
concrete brush curb repair (phase i)
|
455   |
CF |
675.00 |
307,125.00 |
590.00 |
268,450.00 |
1,000.00 |
455,000.00 |
|
|
| S-007 |
brush curb and hand rail replacement (phase i)
|
130   |
LNFT |
130.00 |
16,900.00 |
1,000.00 |
130,000.00 |
1,000.00 |
130,000.00 |
|
|
| S-008 |
65 ft. girder bearing replacement (phase i)
|
195   |
EACH |
1,300.00 |
253,500.00 |
700.00 |
136,500.00 |
5,000.00 |
975,000.00 |
|
|
| S-009 |
repair of concrete girder spalling-screw jacks (phase
i) |
130   |
EACH |
5,400.00 |
702,000.00 |
2,000.00 |
260,000.00 |
2,000.00 |
260,000.00 |
|
|
| S-010 |
repair of concrete girder spalling-cap saddles (phase
i) |
40   |
EACH |
2,200.00 |
88,000.00 |
8,000.00 |
320,000.00 |
10,000.00 |
400,000.00 |
|
|
| S-011 |
repair of concrete girder spalling-helper bent (phase
i) |
2   |
EACH |
150,000.00 |
300,000.00 |
60,000.00 |
120,000.00 |
100,000.00 |
200,000.00 |
|
|
| S-012 |
under the bridge epoxy injection (phase i)
|
1,050   |
LNFT |
160.00 |
168,000.00 |
62.50 |
65,625.00 |
100.00 |
105,000.00 |
|
|
| S-013 |
bridge deck epoxy injection (phase i)
|
1,050   |
LNFT |
125.00 |
131,250.00 |
62.50 |
65,625.00 |
100.00 |
105,000.00 |
|
|
| S-014 |
bridge navigational lighting repair (phase i)
|
lump |
LUMP |
425,000.00 |
425,000.00 |
370,500.00 |
370,500.00 |
500,000.00 |
500,000.00 |
|
|
| S-015 |
removal and disposal of bridge spans (phase i)
|
28   |
EACH |
70,000.00 |
1,960,000.00 |
65,000.00 |
1,820,000.00 |
170,000.00 |
4,760,000.00 |
|
|
| S-016 |
removal and disposal of miscelleanous debris (phase i)
|
lump |
LUMP |
20,000.00 |
20,000.00 |
50,000.00 |
50,000.00 |
100,000.00 |
100,000.00 |
|
|
| S-017 |
new roadway north crossover (phase i)
|
lump |
LUMP |
150,000.00 |
150,000.00 |
500,000.00 |
500,000.00 |
100,000.00 |
100,000.00 |
|
|
| S-018 |
new roadway south crossover (phase i)
|
lump |
LUMP |
150,000.00 |
150,000.00 |
500,000.00 |
500,000.00 |
100,000.00 |
100,000.00 |
|
|
| S-019 |
repair of roadway damage (phase i)
|
lump |
LUMP |
75,000.00 |
75,000.00 |
1,000,000.00 |
1,000,000.00 |
800,000.00 |
800,000.00 |
|
|
| S-020 |
roadway debris removal and disposal (phase i)
|
lump |
LUMP |
10,000.00 |
10,000.00 |
100,000.00 |
100,000.00 |
575,000.00 |
575,000.00 |
|
|
| S-021 |
traffic control (phase i)
|
lump |
LUMP |
30,000.00 |
30,000.00 |
100,000.00 |
100,000.00 |
92,000.00 |
92,000.00 |
|
|
| | SUBTOTAL GENERAL |
|
|
|
10,512,201.00 |
|
15,159,524.64 |
|
64,051,885.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
phase ii west bound structure
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
additive alt. phase ii - emergency repair
|
|
|
|
|
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)(phase ii)
|
300   |
CUYD |
25.00 |
7,500.00 |
50.00 |
15,000.00 |
30.00 |
9,000.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'3" post spacing)
|
8,400.0 |
LNFT |
33.00 |
277,200.00 |
62.00 |
520,800.00 |
30.00 |
252,000.00 |
|
|
| 710-01 |
flowable fill (phase ii)
|
50   |
CUYD |
175.00 |
8,750.00 |
300.00 |
15,000.00 |
250.00 |
12,500.00 |
|
|
| 711-03-E-01 |
riprap (130 lb)(3' thick)(phase ii)
|
300.0 |
TON |
30.00 |
9,000.00 |
200.00 |
60,000.00 |
80.00 |
24,000.00 |
|
|
| 713-01-B |
temporary signs and barricades (phase ii)
|
lump |
LUMP |
25,000.00 |
25,000.00 |
200,000.00 |
200,000.00 |
30,000.00 |
30,000.00 |
|
|
| 727-01-B |
mobilization (phase ii)
|
lump |
LUMP |
2,000,000.00 |
2,000,000.00 |
2,560,000.00 |
2,560,000.00 |
1,500,000.00 |
1,500,000.00 |
|
|
| 731-01-B |
nonreflectorized raised pavement markers (phase ii)
|
6,380   |
EACH |
14.00 |
89,320.00 |
12.00 |
76,560.00 |
14.00 |
89,320.00 |
|
|
| 731-02-B |
reflectorized raised pavement markers (phase ii)
|
5,440   |
EACH |
7.00 |
38,080.00 |
5.90 |
32,096.00 |
7.00 |
38,080.00 |
|
|
| 732-02-A-02 |
plastic pavement striping (solid line)(4 " width)
(phase ii) |
16.220 |
MILE |
2,400.00 |
38,928.00 |
2,112.00 |
34,256.64 |
2,500.00 |
40,550.00 |
|
|
| 732-05-B |
removal of existing markings(phase ii)
|
5.410 |
MILE |
3,600.00 |
19,476.00 |
3,200.00 |
17,312.00 |
3,500.00 |
18,935.00 |
|
|
| 744-01-A |
traffic control management (phase ii)
|
lump |
LUMP |
37,000.00 |
37,000.00 |
50,000.00 |
50,000.00 |
150,000.00 |
150,000.00 |
|
|
| S-022 |
engineering services (phase ii)
|
lump |
LUMP |
300,000.00 |
300,000.00 |
200,000.00 |
200,000.00 |
200,000.00 |
200,000.00 |
|
|
| S-023 |
65 ft. span westbound realignment (phase ii)
|
265   |
EACH |
12,000.00 |
3,180,000.00 |
15,500.00 |
4,107,500.00 |
20,000.00 |
5,300,000.00 |
|
|
| S-024 |
acrow panel bridge (la dotd supplied)(phase ii)
|
2,000   |
LNFT |
365.00 |
730,000.00 |
500.00 |
1,000,000.00 |
400.00 |
800,000.00 |
|
|
| S-025 |
acrow panel bridge (contractor supplied) (phase ii)
|
2,160   |
LNFT |
2,600.00 |
5,616,000.00 |
3,000.00 |
6,480,000.00 |
2,500.00 |
5,400,000.00 |
|
|
| S-026 |
acrow panel cap build-ups (phase ii)
|
140   |
EACH |
7,000.00 |
980,000.00 |
1.00 |
140.00 |
2,000.00 |
280,000.00 |
|
|
| S-027 |
reinstall exisiting undamaged 65 ft westbound span
(phase ii) |
5   |
EACH |
FREE |
FREE |
FREE |
FREE |
FREE |
FREE |
|
|
| S-028 |
concrete bridge deck repairs (phase ii)
|
419   |
CUFT |
700.00 |
293,300.00 |
590.00 |
247,210.00 |
1,000.00 |
419,000.00 |
|
|
| S-029 |
precast concrete barrier (15 ft units - la dotd
supplied)(phase ii) |
3,300   |
EACH |
70.00 |
231,000.00 |
170.00 |
561,000.00 |
300.00 |
990,000.00 |
|
|
| S-030 |
precast concrete barrier (15 ft units - contractor
supplied) (phase ii) |
500   |
EACH |
710.00 |
355,000.00 |
500.00 |
250,000.00 |
700.00 |
350,000.00 |
|
|
| S-031 |
65 ft. girder bearing replacement (phase ii)
|
455   |
EACH |
1,000.00 |
455,000.00 |
350.00 |
159,250.00 |
5,000.00 |
2,275,000.00 |
|
|
| S-032 |
65 ft. span pile bent replacement (phase ii)
|
1   |
EACH |
380,000.00 |
380,000.00 |
350,000.00 |
350,000.00 |
250,000.00 |
250,000.00 |
|
|
| S-033 |
repair of concrete girder spalling-screw jack(phase ii)
|
300   |
EACH |
3,500.00 |
1,050,000.00 |
2,500.00 |
750,000.00 |
2,000.00 |
600,000.00 |
|
|
| S-034 |
repair of concrete girder spalling-cap saddle(phase ii)
|
90   |
EACH |
1,300.00 |
117,000.00 |
6,500.00 |
585,000.00 |
10,000.00 |
900,000.00 |
|
|
| S-035 |
repair of concrete girder spalling-helper bents(phase
ii) |
3   |
EACH |
100,000.00 |
300,000.00 |
150,000.00 |
450,000.00 |
100,000.00 |
300,000.00 |
|
|
| S-036 |
under the bridge-epoxy injection (phase ii)
|
2,450   |
LNFT |
80.00 |
196,000.00 |
62.50 |
153,125.00 |
50.00 |
122,500.00 |
|
|
| S-037 |
bridge deck repair-epoxy injection (phase ii)
|
2,450   |
LNFT |
70.00 |
171,500.00 |
62.50 |
153,125.00 |
100.00 |
245,000.00 |
|
|
| S-038 |
removal and disposal of bridge spans (phase ii)
|
26   |
EACH |
40,000.00 |
1,040,000.00 |
60,000.00 |
1,560,000.00 |
65,000.00 |
1,690,000.00 |
|
|
| S-039 |
removal and disposal of miscellaneous debris (phase ii)
|
lump |
LUMP |
10,000.00 |
10,000.00 |
12,000.00 |
12,000.00 |
100,000.00 |
100,000.00 |
|
|
| S-040 |
traffic control (phase ii)
|
lump |
LUMP |
30,000.00 |
30,000.00 |
5,000.00 |
5,000.00 |
50,000.00 |
50,000.00 |
|
|
| S-041 |
emergency crossover gate rehabilitation (phase ii)
|
lump |
LUMP |
160,000.00 |
160,000.00 |
135,000.00 |
135,000.00 |
200,000.00 |
200,000.00 |
|
|
| S-042 |
65 ft. span relocation (westbound to westbound) (phase
ii) |
20   |
EACH |
40,000.00 |
800,000.00 |
40,000.00 |
800,000.00 |
60,000.00 |
1,200,000.00 |
|
|
| | SUBTOTAL ALT A1 |
|
|
|
18,945,054.00 |
|
21,539,374.64 |
|
23,835,885.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
29,457,255.00 |
|
36,698,899.28 |
|
87,887,770.00 |
|
|
|