Lead Project: 450-17-0022
Parish: ORLEANS, ST TAMMANY
Routes: I-10
Description: INTERSTATE 10 TWIN SPANS OVER LAKE PONTCHARTRAIN
Type Const: phase i - e. bound structure; phase ii - w. bound structure (additive alternate)
- design build emergency span and substructure repair, roadway construction and related work.
 
RankLicenseBidderAmount
102179 BOH BROS. CONSTRUCTION CO., LLC. $29,457,255.00
228665 GILBERTSOUTH/MASSMAN/TRAYLOR, JT VT $36,698,899.28
342786 FLATIRON CONST/JAMES CONST, A JT VT $87,887,770.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
BOH BROS. CONSTRUCTION CO., LLC.
- 2 -
GILBERTSOUTH/MASSMAN/TRAYLOR, JT VT
- 3 -
FLATIRON CONST/JAMES CONST, A JT VT

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
713-01-A temporary signs and barricades (phase i) lump      LUMP 200,000.00 200,000.00 200,000.00 200,000.00 350,000.00 350,000.00    
727-01-A mobilization (phase i) lump      LUMP 1,000,000.00 1,000,000.00 3,700,000.00 3,700,000.00 21,100,000.00 21,100,000.00    
731-01-A nonreflectorized raised pavement markers (phase i) 6,380      EACH 14.00 89,320.00 12.00 76,560.00 14.00 89,320.00    
731-02-A reflectorized raised pavement markers (phase i) 5,440      EACH 7.00 38,080.00 5.90 32,096.00 7.00 38,080.00    
732-02-A-01 plastic pavement striping (solid line) (4" width)
(phase i)
16.220  MILE 2,500.00 40,550.00 2,112.00 34,256.64 2,500.00 40,550.00    
732-05-A removal of existing markings (phase i) 5.410  MILE 3,600.00 19,476.00 3,200.00 17,312.00 3,500.00 18,935.00    
S-001 engineering services (phase i) lump      LUMP 350,000.00 350,000.00 400,000.00 400,000.00 1,530,000.00 1,530,000.00    
S-002 65 ft. span relocation (westbound to eastbound) (phase
i)
38      EACH 20,000.00 760,000.00 55,000.00 2,090,000.00 326,000.00 12,388,000.00    
S-003 65 ft. span eastbound realignment (phase i) 170      EACH 18,000.00 3,060,000.00 16,000.00 2,720,000.00 110,000.00 18,700,000.00    
S-004 reinstall existing undamaged 65 ft. eastbound span
(phase i)
5      EACH FREE FREE FREE FREE FREE FREE    
S-005 concrete bridge deck repair (phase i) 140      CF 1,200.00 168,000.00 590.00 82,600.00 1,000.00 140,000.00    
S-006 concrete brush curb repair (phase i) 455      CF 675.00 307,125.00 590.00 268,450.00 1,000.00 455,000.00    
S-007 brush curb and hand rail replacement (phase i) 130      LNFT 130.00 16,900.00 1,000.00 130,000.00 1,000.00 130,000.00    
S-008 65 ft. girder bearing replacement (phase i) 195      EACH 1,300.00 253,500.00 700.00 136,500.00 5,000.00 975,000.00    
S-009 repair of concrete girder spalling-screw jacks (phase
i)
130      EACH 5,400.00 702,000.00 2,000.00 260,000.00 2,000.00 260,000.00    
S-010 repair of concrete girder spalling-cap saddles (phase
i)
40      EACH 2,200.00 88,000.00 8,000.00 320,000.00 10,000.00 400,000.00    
S-011 repair of concrete girder spalling-helper bent (phase
i)
2      EACH 150,000.00 300,000.00 60,000.00 120,000.00 100,000.00 200,000.00    
S-012 under the bridge epoxy injection (phase i) 1,050      LNFT 160.00 168,000.00 62.50 65,625.00 100.00 105,000.00    
S-013 bridge deck epoxy injection (phase i) 1,050      LNFT 125.00 131,250.00 62.50 65,625.00 100.00 105,000.00    
S-014 bridge navigational lighting repair (phase i) lump      LUMP 425,000.00 425,000.00 370,500.00 370,500.00 500,000.00 500,000.00    
S-015 removal and disposal of bridge spans (phase i) 28      EACH 70,000.00 1,960,000.00 65,000.00 1,820,000.00 170,000.00 4,760,000.00    
S-016 removal and disposal of miscelleanous debris (phase i) lump      LUMP 20,000.00 20,000.00 50,000.00 50,000.00 100,000.00 100,000.00    
S-017 new roadway north crossover (phase i) lump      LUMP 150,000.00 150,000.00 500,000.00 500,000.00 100,000.00 100,000.00    
S-018 new roadway south crossover (phase i) lump      LUMP 150,000.00 150,000.00 500,000.00 500,000.00 100,000.00 100,000.00    
S-019 repair of roadway damage (phase i) lump      LUMP 75,000.00 75,000.00 1,000,000.00 1,000,000.00 800,000.00 800,000.00    
S-020 roadway debris removal and disposal (phase i) lump      LUMP 10,000.00 10,000.00 100,000.00 100,000.00 575,000.00 575,000.00    
S-021 traffic control (phase i) lump      LUMP 30,000.00 30,000.00 100,000.00 100,000.00 92,000.00 92,000.00    
 SUBTOTAL GENERAL       10,512,201.00   15,159,524.64   64,051,885.00    
                       
ALTERNATE A phase ii west bound structure                    
                       
ALTERNATE A1 additive alt. phase ii - emergency repair                    
203-08 borrow (vehicular measurement)(phase ii) 300      CUYD 25.00 7,500.00 50.00 15,000.00 30.00 9,000.00    
704-01-B guard rail (single thrie beam)(6'3" post spacing) 8,400.0    LNFT 33.00 277,200.00 62.00 520,800.00 30.00 252,000.00    
710-01 flowable fill (phase ii) 50      CUYD 175.00 8,750.00 300.00 15,000.00 250.00 12,500.00    
711-03-E-01 riprap (130 lb)(3' thick)(phase ii) 300.0    TON 30.00 9,000.00 200.00 60,000.00 80.00 24,000.00    
713-01-B temporary signs and barricades (phase ii) lump      LUMP 25,000.00 25,000.00 200,000.00 200,000.00 30,000.00 30,000.00    
727-01-B mobilization (phase ii) lump      LUMP 2,000,000.00 2,000,000.00 2,560,000.00 2,560,000.00 1,500,000.00 1,500,000.00    
731-01-B nonreflectorized raised pavement markers (phase ii) 6,380      EACH 14.00 89,320.00 12.00 76,560.00 14.00 89,320.00    
731-02-B reflectorized raised pavement markers (phase ii) 5,440      EACH 7.00 38,080.00 5.90 32,096.00 7.00 38,080.00    
732-02-A-02 plastic pavement striping (solid line)(4 " width)
(phase ii)
16.220  MILE 2,400.00 38,928.00 2,112.00 34,256.64 2,500.00 40,550.00    
732-05-B removal of existing markings(phase ii) 5.410  MILE 3,600.00 19,476.00 3,200.00 17,312.00 3,500.00 18,935.00    
744-01-A traffic control management (phase ii) lump      LUMP 37,000.00 37,000.00 50,000.00 50,000.00 150,000.00 150,000.00    
S-022 engineering services (phase ii) lump      LUMP 300,000.00 300,000.00 200,000.00 200,000.00 200,000.00 200,000.00    
S-023 65 ft. span westbound realignment (phase ii) 265      EACH 12,000.00 3,180,000.00 15,500.00 4,107,500.00 20,000.00 5,300,000.00    
S-024 acrow panel bridge (la dotd supplied)(phase ii) 2,000      LNFT 365.00 730,000.00 500.00 1,000,000.00 400.00 800,000.00    
S-025 acrow panel bridge (contractor supplied) (phase ii) 2,160      LNFT 2,600.00 5,616,000.00 3,000.00 6,480,000.00 2,500.00 5,400,000.00    
S-026 acrow panel cap build-ups (phase ii) 140      EACH 7,000.00 980,000.00 1.00 140.00 2,000.00 280,000.00    
S-027 reinstall exisiting undamaged 65 ft westbound span
(phase ii)
5      EACH FREE FREE FREE FREE FREE FREE    
S-028 concrete bridge deck repairs (phase ii) 419      CUFT 700.00 293,300.00 590.00 247,210.00 1,000.00 419,000.00    
S-029 precast concrete barrier (15 ft units - la dotd
supplied)(phase ii)
3,300      EACH 70.00 231,000.00 170.00 561,000.00 300.00 990,000.00    
S-030 precast concrete barrier (15 ft units - contractor
supplied) (phase ii)
500      EACH 710.00 355,000.00 500.00 250,000.00 700.00 350,000.00    
S-031 65 ft. girder bearing replacement (phase ii) 455      EACH 1,000.00 455,000.00 350.00 159,250.00 5,000.00 2,275,000.00    
S-032 65 ft. span pile bent replacement (phase ii) 1      EACH 380,000.00 380,000.00 350,000.00 350,000.00 250,000.00 250,000.00    
S-033 repair of concrete girder spalling-screw jack(phase ii) 300      EACH 3,500.00 1,050,000.00 2,500.00 750,000.00 2,000.00 600,000.00    
S-034 repair of concrete girder spalling-cap saddle(phase ii) 90      EACH 1,300.00 117,000.00 6,500.00 585,000.00 10,000.00 900,000.00    
S-035 repair of concrete girder spalling-helper bents(phase
ii)
3      EACH 100,000.00 300,000.00 150,000.00 450,000.00 100,000.00 300,000.00    
S-036 under the bridge-epoxy injection (phase ii) 2,450      LNFT 80.00 196,000.00 62.50 153,125.00 50.00 122,500.00    
S-037 bridge deck repair-epoxy injection (phase ii) 2,450      LNFT 70.00 171,500.00 62.50 153,125.00 100.00 245,000.00    
S-038 removal and disposal of bridge spans (phase ii) 26      EACH 40,000.00 1,040,000.00 60,000.00 1,560,000.00 65,000.00 1,690,000.00    
S-039 removal and disposal of miscellaneous debris (phase ii) lump      LUMP 10,000.00 10,000.00 12,000.00 12,000.00 100,000.00 100,000.00    
S-040 traffic control (phase ii) lump      LUMP 30,000.00 30,000.00 5,000.00 5,000.00 50,000.00 50,000.00    
S-041 emergency crossover gate rehabilitation (phase ii) lump      LUMP 160,000.00 160,000.00 135,000.00 135,000.00 200,000.00 200,000.00    
S-042 65 ft. span relocation (westbound to westbound) (phase
ii)
20      EACH 40,000.00 800,000.00 40,000.00 800,000.00 60,000.00 1,200,000.00    
 SUBTOTAL ALT A1       18,945,054.00   21,539,374.64   23,835,885.00    
                       
 CONTRACTOR TOTAL       29,457,255.00   36,698,899.28   87,887,770.00    