| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - W. E. BLAIN & SONS, INC. |
- 4 - DENTON-JAMES LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
300,000.00 |
300,000.00 |
630,000.00 |
630,000.00 |
275,000.00 |
275,000.00 |
900,000.00 |
900,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
40,000.00 |
40,000.00 |
15,000.00 |
15,000.00 |
50,000.00 |
50,000.00 |
150,000.00 |
150,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
18,282   |
SQYD |
9.00 |
164,538.00 |
6.00 |
109,692.00 |
7.60 |
138,943.20 |
6.50 |
118,833.00 |
| 202-02-D |
removal of concrete walks & drives
|
300   |
SQYD |
15.00 |
4,500.00 |
9.00 |
2,700.00 |
8.00 |
2,400.00 |
9.00 |
2,700.00 |
| 202-02-F |
removal of concrete combination curb & gutter
|
5,034.0 |
LNFT |
3.50 |
17,619.00 |
6.00 |
30,204.00 |
9.00 |
45,306.00 |
2.00 |
10,068.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
23,848.2 |
SQYD |
7.00 |
166,937.40 |
4.00 |
95,392.80 |
4.60 |
109,701.72 |
4.00 |
95,392.80 |
| 202-02-01 |
removal of 20' x 56' wood frame building (rt. of sta.
111+60) |
1   |
EACH |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
6,720.00 |
6,720.00 |
1.00 |
1.00 |
| 202-02-02 |
removal of 26' x 60' wood frame building (rt. of sta.
51+40)(contains non-friable asbestos) |
1   |
EACH |
1.00 |
1.00 |
3,000.00 |
3,000.00 |
12,480.00 |
12,480.00 |
1.00 |
1.00 |
| 202-02-03 |
removal of 28' x 40' building (lt. of sta. 53+40)
|
1   |
EACH |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
6,720.00 |
6,720.00 |
1.00 |
1.00 |
| 202-02-04 |
removal of 12' x 12' tin building (lt. of sta. 52+80)
|
1   |
EACH |
1.00 |
1.00 |
500.00 |
500.00 |
864.00 |
864.00 |
1.00 |
1.00 |
| 202-02-05 |
removal of 12' x 63' tin building (lt. of sta. 52+10)
|
1   |
EACH |
1.00 |
1.00 |
1,800.00 |
1,800.00 |
4,536.00 |
4,536.00 |
1.00 |
1.00 |
| 202-02-06 |
removal of 28' x 40' brick building (rt. of sta.
113+25) |
1   |
EACH |
1.00 |
1.00 |
2,000.00 |
2,000.00 |
8,960.00 |
8,960.00 |
1.00 |
1.00 |
| 202-02-07 |
removal of 30' x 40' building (lt. of 281+00)
|
1   |
EACH |
1.00 |
1.00 |
2,500.00 |
2,500.00 |
7,200.00 |
7,200.00 |
1.00 |
1.00 |
| 202-02-08 |
removal of 30' x 20' wood frame building (lt. of sta.
44+50)(contains asbestos siding) |
1   |
EACH |
1.00 |
1.00 |
3,000.00 |
3,000.00 |
4,800.00 |
4,800.00 |
1.00 |
1.00 |
| 202-02-09 |
removal of 833 square foot wood frame building (lt. of
sta. 44+50) |
1   |
EACH |
1.00 |
1.00 |
1,200.00 |
1,200.00 |
4,998.00 |
4,998.00 |
1.00 |
1.00 |
| 202-02-10 |
removal of 9' x 14' building (lt. of sta. 48+00)
|
1   |
EACH |
1.00 |
1.00 |
50.00 |
50.00 |
756.00 |
756.00 |
1.00 |
1.00 |
| 202-02-11 |
removal of 48' x 52' brick building (rt. of sta. 48+00)
|
1   |
EACH |
1.00 |
1.00 |
2,800.00 |
2,800.00 |
14,976.00 |
14,976.00 |
1.00 |
1.00 |
| 203-01 |
general excavation
|
248,385   |
CUYD |
4.00 |
993,540.00 |
3.00 |
745,155.00 |
4.50 |
1,117,732.50 |
4.00 |
993,540.00 |
| 203-02 |
drainage excavation
|
500   |
CUYD |
10.00 |
5,000.00 |
8.00 |
4,000.00 |
11.00 |
5,500.00 |
10.00 |
5,000.00 |
| 203-03 |
muck excavation
|
1,000   |
CUYD |
11.00 |
11,000.00 |
12.00 |
12,000.00 |
11.00 |
11,000.00 |
10.00 |
10,000.00 |
| 203-04 |
embankment
|
250,162   |
CUYD |
6.50 |
1,626,053.00 |
5.50 |
1,375,891.00 |
8.50 |
2,126,377.00 |
8.00 |
2,001,296.00 |
| 204-02 |
temporary hay or straw bales
|
250   |
EACH |
9.00 |
2,250.00 |
6.00 |
1,500.00 |
9.00 |
2,250.00 |
6.00 |
1,500.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
39   |
EACH |
75.00 |
2,925.00 |
150.00 |
5,850.00 |
160.00 |
6,240.00 |
100.00 |
3,900.00 |
| 204-06 |
temporary silt fencing
|
86,812   |
LNFT |
2.00 |
173,624.00 |
1.25 |
108,515.00 |
1.30 |
112,855.60 |
1.30 |
112,855.60 |
| 204-07 |
temporary stone construction entrance
|
14   |
EACH |
1,000.00 |
14,000.00 |
1,000.00 |
14,000.00 |
2,000.00 |
28,000.00 |
1,500.00 |
21,000.00 |
| 304-01 |
lime
|
3,290.48 |
TON |
120.00 |
394,857.60 |
125.00 |
411,310.00 |
100.00 |
329,048.00 |
125.00 |
411,310.00 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
232,365   |
SQYD |
1.55 |
360,165.75 |
1.20 |
278,838.00 |
0.01 |
2,323.65 |
1.60 |
371,784.00 |
| 401-01 |
aggregate surface course (net section)
|
1,038.6 |
CUYD |
18.00 |
18,694.80 |
50.00 |
51,930.00 |
31.35 |
32,560.11 |
50.00 |
51,930.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,050.0 |
CUYD |
30.00 |
31,500.00 |
45.00 |
47,250.00 |
45.00 |
47,250.00 |
50.00 |
52,500.00 |
| 701-01-G |
cross drain pipe (18" rcp/pcp)
|
82   |
LNFT |
54.00 |
4,428.00 |
65.00 |
5,330.00 |
87.00 |
7,134.00 |
55.00 |
4,510.00 |
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
879   |
LNFT |
59.00 |
51,861.00 |
75.00 |
65,925.00 |
74.00 |
65,046.00 |
60.00 |
52,740.00 |
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
608   |
LNFT |
73.00 |
44,384.00 |
120.00 |
72,960.00 |
85.00 |
51,680.00 |
75.00 |
45,600.00 |
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
654   |
LNFT |
96.00 |
62,784.00 |
145.00 |
94,830.00 |
105.00 |
68,670.00 |
95.00 |
62,130.00 |
| 701-01-N |
cross drain pipe (42" rcp/pcp)
|
96   |
LNFT |
139.00 |
13,344.00 |
200.00 |
19,200.00 |
135.00 |
12,960.00 |
130.00 |
12,480.00 |
| 701-01-O |
cross drain pipe (48" rcp/pcp)
|
876   |
LNFT |
161.00 |
141,036.00 |
240.00 |
210,240.00 |
165.00 |
144,540.00 |
140.00 |
122,640.00 |
| 701-02-E |
cross drain pipe arch (30" equiv. rcpa)
|
224   |
LNFT |
102.00 |
22,848.00 |
150.00 |
33,600.00 |
95.00 |
21,280.00 |
85.00 |
19,040.00 |
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
388   |
LNFT |
128.00 |
49,664.00 |
160.00 |
62,080.00 |
120.00 |
46,560.00 |
100.00 |
38,800.00 |
| 701-05-G |
side drain pipe (18")
|
246   |
LNFT |
42.00 |
10,332.00 |
60.00 |
14,760.00 |
36.00 |
8,856.00 |
44.00 |
10,824.00 |
| 701-05-I |
side drain pipe (24")
|
748   |
LNFT |
59.00 |
44,132.00 |
80.00 |
59,840.00 |
40.00 |
29,920.00 |
50.00 |
37,400.00 |
| 701-05-K |
side drain pipe (30")
|
34   |
LNFT |
80.00 |
2,720.00 |
125.00 |
4,250.00 |
60.00 |
2,040.00 |
68.00 |
2,312.00 |
| 701-05-M |
side drain pipe (36")
|
72   |
LNFT |
107.00 |
7,704.00 |
180.00 |
12,960.00 |
70.00 |
5,040.00 |
80.00 |
5,760.00 |
| 701-06-E |
side drain pipe arch (30" equiv.)
|
476   |
LNFT |
85.00 |
40,460.00 |
140.00 |
66,640.00 |
80.00 |
38,080.00 |
80.00 |
38,080.00 |
| 701-09 |
fabricating pipe fittings (36" x 36" x 24")
|
1   |
EACH |
1,600.00 |
1,600.00 |
2,300.00 |
2,300.00 |
1,500.00 |
1,500.00 |
2,000.00 |
2,000.00 |
| 701-15 |
concrete collar
|
44   |
EACH |
805.00 |
35,420.00 |
900.00 |
39,600.00 |
600.00 |
26,400.00 |
700.00 |
30,800.00 |
| 702-02-A |
manholes (mh-06)
|
2   |
EACH |
2,400.00 |
4,800.00 |
5,900.00 |
11,800.00 |
3,700.00 |
7,400.00 |
2,600.00 |
5,200.00 |
| 702-03-A |
catch basins (cb-01)
|
2   |
EACH |
2,600.00 |
5,200.00 |
4,600.00 |
9,200.00 |
2,500.00 |
5,000.00 |
2,600.00 |
5,200.00 |
| 702-04-A |
adjusting manholes
|
2   |
EACH |
1,100.00 |
2,200.00 |
3,600.00 |
7,200.00 |
1,400.00 |
2,800.00 |
1,000.00 |
2,000.00 |
| 702-07-A |
cross drain safety end treatment (type 1)
|
7   |
EACH |
1,900.00 |
13,300.00 |
2,000.00 |
14,000.00 |
1,500.00 |
10,500.00 |
1,400.00 |
9,800.00 |
| 702-07-D |
cross drain safety end treatment (type 4)
|
5   |
EACH |
6,500.00 |
32,500.00 |
3,400.00 |
17,000.00 |
8,500.00 |
42,500.00 |
6,000.00 |
30,000.00 |
| 702-08-A |
side drain safety end treatment (type 1)
|
46   |
EACH |
1,200.00 |
55,200.00 |
1,600.00 |
73,600.00 |
1,400.00 |
64,400.00 |
1,200.00 |
55,200.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
75.0 |
LNFT |
32.00 |
2,400.00 |
30.00 |
2,250.00 |
29.00 |
2,175.00 |
30.00 |
2,250.00 |
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
75.0 |
LNFT |
54.00 |
4,050.00 |
50.00 |
3,750.00 |
50.00 |
3,750.00 |
50.00 |
3,750.00 |
| 704-03 |
blocked out guard rail
|
112.5 |
LNFT |
18.00 |
2,025.00 |
18.00 |
2,025.00 |
16.50 |
1,856.25 |
17.00 |
1,912.50 |
| 704-06 |
guard rail anchor sections (trailing end)
|
18.8 |
LNFT |
78.00 |
1,466.40 |
75.00 |
1,410.00 |
72.50 |
1,363.00 |
73.00 |
1,372.40 |
| 704-11-A |
guard rail end treatment (flared)
|
3   |
EACH |
2,000.00 |
6,000.00 |
2,000.00 |
6,000.00 |
1,850.00 |
5,550.00 |
2,000.00 |
6,000.00 |
| 705-01 |
barbed wire fence
|
6,292   |
LNFT |
5.10 |
32,089.20 |
5.00 |
31,460.00 |
4.75 |
29,887.00 |
5.00 |
31,460.00 |
| 705-04 |
single swinging driveway gates
|
3   |
EACH |
550.00 |
1,650.00 |
450.00 |
1,350.00 |
500.00 |
1,500.00 |
500.00 |
1,500.00 |
| 705-05 |
double swinging driveway gates
|
1   |
DBGT |
800.00 |
800.00 |
700.00 |
700.00 |
750.00 |
750.00 |
700.00 |
700.00 |
| 706-02-C |
concrete drive (6" thick)
|
64.9 |
SQYD |
43.00 |
2,790.70 |
55.00 |
3,569.50 |
50.00 |
3,245.00 |
60.00 |
3,894.00 |
| 706-03-C |
incidental concrete paving (6" thick)
|
399.0 |
SQYD |
48.00 |
19,152.00 |
60.00 |
23,940.00 |
47.00 |
18,753.00 |
55.00 |
21,945.00 |
| 707-01 |
concrete curb
|
394.0 |
LNFT |
22.00 |
8,668.00 |
14.00 |
5,516.00 |
12.00 |
4,728.00 |
10.00 |
3,940.00 |
| 707-03 |
combination concrete curb & gutter
|
815.6 |
LNFT |
23.00 |
18,758.80 |
22.00 |
17,943.20 |
28.00 |
22,836.80 |
22.00 |
17,943.20 |
| 708-01 |
right-of-way monument
|
148   |
EACH |
100.00 |
14,800.00 |
180.00 |
26,640.00 |
90.00 |
13,320.00 |
120.00 |
17,760.00 |
| 708-02 |
right-of-way monument witness post
|
148   |
EACH |
100.00 |
14,800.00 |
180.00 |
26,640.00 |
90.00 |
13,320.00 |
120.00 |
17,760.00 |
| 711-01-C |
riprap (30 lb, 14"thick)
|
92   |
SQYD |
75.00 |
6,900.00 |
55.00 |
5,060.00 |
45.00 |
4,140.00 |
65.00 |
5,980.00 |
| 711-04 |
geotextile fabric
|
92   |
SQYD |
2.15 |
197.80 |
2.50 |
230.00 |
3.00 |
276.00 |
2.00 |
184.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
170,000.00 |
170,000.00 |
160,000.00 |
160,000.00 |
140,000.00 |
140,000.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
1.372 |
MILE |
192.00 |
263.42 |
250.00 |
343.00 |
400.00 |
548.80 |
2,500.00 |
3,430.00 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
0.536 |
MILE |
540.00 |
289.44 |
500.00 |
268.00 |
500.00 |
268.00 |
510.00 |
273.36 |
| 716-01-A |
mulch (vegetative)
|
141.16 |
ACRE |
536.00 |
75,661.76 |
400.00 |
56,464.00 |
650.00 |
91,754.00 |
400.00 |
56,464.00 |
| 717-01 |
seeding
|
2,824   |
LB |
10.00 |
28,240.00 |
10.00 |
28,240.00 |
9.00 |
25,416.00 |
10.00 |
28,240.00 |
| 718-01 |
fertilizer
|
141,162   |
LB |
0.32 |
45,171.84 |
0.25 |
35,290.50 |
0.20 |
28,232.40 |
0.22 |
31,055.64 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
25,000.00 |
25,000.00 |
15,000.00 |
15,000.00 |
32,000.00 |
32,000.00 |
25,000.00 |
25,000.00 |
| 725-01 |
temporary detour roads
|
550.0 |
LNFT |
230.00 |
126,500.00 |
150.00 |
82,500.00 |
240.00 |
132,000.00 |
225.00 |
123,750.00 |
| 726-01 |
bedding material
|
437.9 |
CUYD |
53.00 |
23,208.70 |
50.00 |
21,895.00 |
50.00 |
21,895.00 |
50.00 |
21,895.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
1,300,000.00 |
1,300,000.00 |
1,100,000.00 |
1,100,000.00 |
1,000,000.00 |
1,000,000.00 |
1,500,000.00 |
1,500,000.00 |
| 728-01-A |
jack or bored pipe (24" rcp/pcp)
|
89.0 |
LNFT |
481.00 |
42,809.00 |
450.00 |
40,050.00 |
425.00 |
37,825.00 |
450.00 |
40,050.00 |
| 728-01-B |
jack or bored pipe (36" rcp/pcp)
|
160.0 |
LNFT |
627.00 |
100,320.00 |
600.00 |
96,000.00 |
525.00 |
84,000.00 |
600.00 |
96,000.00 |
| 729-19-A |
dead end roadway installation (type a)
|
8   |
EACH |
3,100.00 |
24,800.00 |
3,000.00 |
24,000.00 |
2,850.00 |
22,800.00 |
3,000.00 |
24,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
2,347   |
EACH |
4.83 |
11,336.01 |
5.00 |
11,735.00 |
4.50 |
10,561.50 |
4.50 |
10,561.50 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
37.833 |
MILE |
2,000.00 |
75,666.00 |
1,800.00 |
68,099.40 |
1,850.00 |
69,991.05 |
1,900.00 |
71,882.70 |
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.760 |
MILE |
4,500.00 |
3,420.00 |
4,000.00 |
3,040.00 |
4,224.00 |
3,210.24 |
4,300.00 |
3,268.00 |
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.114 |
MILE |
16,500.00 |
1,881.00 |
15,000.00 |
1,710.00 |
15,840.00 |
1,805.76 |
16,000.00 |
1,824.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
9   |
EACH |
134.00 |
1,206.00 |
125.00 |
1,125.00 |
125.00 |
1,125.00 |
130.00 |
1,170.00 |
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
5   |
EACH |
188.00 |
940.00 |
175.00 |
875.00 |
175.00 |
875.00 |
180.00 |
900.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
11   |
EACH |
188.00 |
2,068.00 |
175.00 |
1,925.00 |
175.00 |
1,925.00 |
180.00 |
1,980.00 |
| 732-05 |
removal of existing markings
|
22.988 |
MILE |
3,400.00 |
78,159.20 |
3,000.00 |
68,964.00 |
3,168.00 |
72,825.98 |
1.00 |
22.98 |
| 735-01 |
mailboxes
|
20   |
EACH |
12.00 |
240.00 |
10.00 |
200.00 |
2.00 |
40.00 |
1.00 |
20.00 |
| 735-02 |
mailbox supports (single)
|
20   |
EACH |
90.00 |
1,800.00 |
150.00 |
3,000.00 |
150.00 |
3,000.00 |
150.00 |
3,000.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
100,000.00 |
100,000.00 |
150,000.00 |
150,000.00 |
306,000.00 |
306,000.00 |
240,000.00 |
240,000.00 |
| 742-02 |
adjusting sanitary sewer house connections
|
2   |
EACH |
536.00 |
1,072.00 |
1,000.00 |
2,000.00 |
600.00 |
1,200.00 |
1,000.00 |
2,000.00 |
| 744-01 |
traffic contraol management
|
lump |
LUMP |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
64,000.00 |
64,000.00 |
30,000.00 |
30,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
9.98 |
CUYD |
644.00 |
6,427.12 |
1,000.00 |
9,980.00 |
1,300.00 |
12,974.00 |
1,000.00 |
9,980.00 |
| 805-12-E-01 |
reinforced concrete box culverts (4'x 4')(extension)
|
26.0 |
LNFT |
483.00 |
12,558.00 |
500.00 |
13,000.00 |
750.00 |
19,500.00 |
350.00 |
9,100.00 |
| 806-01 |
deformed reinforcing steel
|
1,297   |
LB |
2.15 |
2,788.55 |
0.70 |
907.90 |
2.00 |
2,594.00 |
1.20 |
1,556.40 |
| S-001 |
rumble strips (ground-in)
|
17.0 |
MILE |
761.00 |
12,937.00 |
550.00 |
9,350.00 |
675.00 |
11,475.00 |
500.00 |
8,500.00 |
| S-002 |
saw cut existing concrete
|
8,572   |
LNFT |
5.00 |
42,860.00 |
5.00 |
42,860.00 |
8.00 |
68,576.00 |
8.00 |
68,576.00 |
| | SUBTOTAL GENERAL |
|
|
|
7,367,303.49 |
|
7,083,698.30 |
|
7,593,671.56 |
|
8,598,987.08 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
|
|
|
|
|
|
|
|
|
|
|
| 302-02-C-01 |
class ii base course (10" thick)(stone or recycled
pccp) |
51,706.3 |
SQYD |
17.50 |
904,860.25 |
15.00 |
775,594.50 |
18.65 |
964,322.49 |
17.00 |
879,007.10 |
| 302-02-C-02 |
class ii base course (10" thick)(soil cement)
|
172,762.1 |
SQYD |
7.50 |
1,295,715.75 |
10.00 |
1,727,621.00 |
7.55 |
1,304,353.85 |
9.30 |
1,606,687.53 |
| 302-02-E-01 |
class ii base course (4" thick)(stone or recycled pccp)
|
170,814.7 |
SQYD |
7.20 |
1,229,865.84 |
6.00 |
1,024,888.20 |
7.22 |
1,233,282.13 |
7.30 |
1,246,947.31 |
| 502-01 |
superpave asphaltic concrete
|
50,950.6 |
TON |
47.00 |
2,394,678.20 |
50.00 |
2,547,530.00 |
51.10 |
2,603,575.66 |
50.00 |
2,547,530.00 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
7,647.6 |
TON |
62.00 |
474,151.20 |
62.00 |
474,151.20 |
62.00 |
474,151.20 |
62.00 |
474,151.20 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
15.119 |
MILE |
805.00 |
12,170.79 |
750.00 |
11,339.25 |
750.00 |
11,339.25 |
800.00 |
12,095.20 |
| | SUBTOTAL ALT A1 |
|
|
|
6,311,442.03 |
|
6,561,124.15 |
|
6,591,024.58 |
|
6,766,418.34 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
|
|
|
|
|
|
|
|
|
|
|
| 302-02-C-01 |
class ii base course (10" thick)(stone or recycled
pccp) |
51,706.3 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 302-02-E-01 |
class ii base course (4" thick)(stone or recycled pccp)
|
170,814.7 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 302-02-F-01 |
class ii base course (8" thick)(soil cement)
|
172,762.1 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 502-01 |
superpave asphaltic concrete
|
4,926.1 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
988.0 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 601-01-G |
portland cement concrete pavement (8" thick)
|
136,427.1 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 601-02-G |
portland cement concrete pavement (8" thick)
(crossovers & turnouts) |
22,922.4 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 601-04 |
portland cement concrete pavement coring
|
210   |
EACH |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 732-03-A |
plastic pvmt striping (broken line)(4"width)
|
7.395 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)preformed
marking tape (type 5) |
7.724 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
13,678,745.52 |
|
13,644,822.45 |
|
14,184,696.14 |
|
15,365,405.42 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - GILCHRIST CONSTRUCTION CO. LLC |
- 6 - HIGHWAY SPECIALISTS INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
1,000,000.00 |
1,000,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
4,000.00 |
4,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
18,282   |
SQYD |
6.00 |
109,692.00 |
8.00 |
146,256.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
300   |
SQYD |
7.00 |
2,100.00 |
12.00 |
3,600.00 |
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
5,034.0 |
LNFT |
1.50 |
7,551.00 |
6.00 |
30,204.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
23,848.2 |
SQYD |
5.00 |
119,241.00 |
7.00 |
166,937.40 |
|
|
|
|
| 202-02-01 |
removal of 20' x 56' wood frame building (rt. of sta.
111+60) |
1   |
EACH |
4,000.00 |
4,000.00 |
1,500.00 |
1,500.00 |
|
|
|
|
| 202-02-02 |
removal of 26' x 60' wood frame building (rt. of sta.
51+40)(contains non-friable asbestos) |
1   |
EACH |
4,000.00 |
4,000.00 |
5,100.00 |
5,100.00 |
|
|
|
|
| 202-02-03 |
removal of 28' x 40' building (lt. of sta. 53+40)
|
1   |
EACH |
4,000.00 |
4,000.00 |
1,500.00 |
1,500.00 |
|
|
|
|
| 202-02-04 |
removal of 12' x 12' tin building (lt. of sta. 52+80)
|
1   |
EACH |
1,000.00 |
1,000.00 |
500.00 |
500.00 |
|
|
|
|
| 202-02-05 |
removal of 12' x 63' tin building (lt. of sta. 52+10)
|
1   |
EACH |
4,000.00 |
4,000.00 |
1,800.00 |
1,800.00 |
|
|
|
|
| 202-02-06 |
removal of 28' x 40' brick building (rt. of sta.
113+25) |
1   |
EACH |
8,000.00 |
8,000.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 202-02-07 |
removal of 30' x 40' building (lt. of 281+00)
|
1   |
EACH |
1,000.00 |
1,000.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 202-02-08 |
removal of 30' x 20' wood frame building (lt. of sta.
44+50)(contains asbestos siding) |
1   |
EACH |
10,000.00 |
10,000.00 |
5,100.00 |
5,100.00 |
|
|
|
|
| 202-02-09 |
removal of 833 square foot wood frame building (lt. of
sta. 44+50) |
1   |
EACH |
4,000.00 |
4,000.00 |
1,200.00 |
1,200.00 |
|
|
|
|
| 202-02-10 |
removal of 9' x 14' building (lt. of sta. 48+00)
|
1   |
EACH |
1,000.00 |
1,000.00 |
50.00 |
50.00 |
|
|
|
|
| 202-02-11 |
removal of 48' x 52' brick building (rt. of sta. 48+00)
|
1   |
EACH |
8,000.00 |
8,000.00 |
2,800.00 |
2,800.00 |
|
|
|
|
| 203-01 |
general excavation
|
248,385   |
CUYD |
5.00 |
1,241,925.00 |
6.00 |
1,490,310.00 |
|
|
|
|
| 203-02 |
drainage excavation
|
500   |
CUYD |
12.00 |
6,000.00 |
15.00 |
7,500.00 |
|
|
|
|
| 203-03 |
muck excavation
|
1,000   |
CUYD |
12.00 |
12,000.00 |
15.00 |
15,000.00 |
|
|
|
|
| 203-04 |
embankment
|
250,162   |
CUYD |
8.00 |
2,001,296.00 |
8.50 |
2,126,377.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
250   |
EACH |
10.00 |
2,500.00 |
10.00 |
2,500.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
39   |
EACH |
200.00 |
7,800.00 |
70.00 |
2,730.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
86,812   |
LNFT |
1.25 |
108,515.00 |
1.75 |
151,921.00 |
|
|
|
|
| 204-07 |
temporary stone construction entrance
|
14   |
EACH |
2,800.00 |
39,200.00 |
3,400.00 |
47,600.00 |
|
|
|
|
| 304-01 |
lime
|
3,290.48 |
TON |
25.00 |
82,262.00 |
125.00 |
411,310.00 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
232,365   |
SQYD |
0.25 |
58,091.25 |
1.50 |
348,547.50 |
|
|
|
|
| 401-01 |
aggregate surface course (net section)
|
1,038.6 |
CUYD |
50.00 |
51,930.00 |
35.00 |
36,351.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,050.0 |
CUYD |
60.00 |
63,000.00 |
80.00 |
84,000.00 |
|
|
|
|
| 701-01-G |
cross drain pipe (18" rcp/pcp)
|
82   |
LNFT |
65.00 |
5,330.00 |
85.00 |
6,970.00 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
879   |
LNFT |
68.00 |
59,772.00 |
115.00 |
101,085.00 |
|
|
|
|
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
608   |
LNFT |
90.00 |
54,720.00 |
120.00 |
72,960.00 |
|
|
|
|
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
654   |
LNFT |
110.00 |
71,940.00 |
130.00 |
85,020.00 |
|
|
|
|
| 701-01-N |
cross drain pipe (42" rcp/pcp)
|
96   |
LNFT |
140.00 |
13,440.00 |
175.00 |
16,800.00 |
|
|
|
|
| 701-01-O |
cross drain pipe (48" rcp/pcp)
|
876   |
LNFT |
180.00 |
157,680.00 |
180.00 |
157,680.00 |
|
|
|
|
| 701-02-E |
cross drain pipe arch (30" equiv. rcpa)
|
224   |
LNFT |
100.00 |
22,400.00 |
130.00 |
29,120.00 |
|
|
|
|
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
388   |
LNFT |
120.00 |
46,560.00 |
145.00 |
56,260.00 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
246   |
LNFT |
80.00 |
19,680.00 |
30.00 |
7,380.00 |
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
748   |
LNFT |
90.00 |
67,320.00 |
35.00 |
26,180.00 |
|
|
|
|
| 701-05-K |
side drain pipe (30")
|
34   |
LNFT |
100.00 |
3,400.00 |
50.00 |
1,700.00 |
|
|
|
|
| 701-05-M |
side drain pipe (36")
|
72   |
LNFT |
120.00 |
8,640.00 |
70.00 |
5,040.00 |
|
|
|
|
| 701-06-E |
side drain pipe arch (30" equiv.)
|
476   |
LNFT |
125.00 |
59,500.00 |
55.00 |
26,180.00 |
|
|
|
|
| 701-09 |
fabricating pipe fittings (36" x 36" x 24")
|
1   |
EACH |
2,500.00 |
2,500.00 |
2,600.00 |
2,600.00 |
|
|
|
|
| 701-15 |
concrete collar
|
44   |
EACH |
2,500.00 |
110,000.00 |
900.00 |
39,600.00 |
|
|
|
|
| 702-02-A |
manholes (mh-06)
|
2   |
EACH |
4,000.00 |
8,000.00 |
4,200.00 |
8,400.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
2   |
EACH |
4,500.00 |
9,000.00 |
3,400.00 |
6,800.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
2   |
EACH |
2,500.00 |
5,000.00 |
1,700.00 |
3,400.00 |
|
|
|
|
| 702-07-A |
cross drain safety end treatment (type 1)
|
7   |
EACH |
2,000.00 |
14,000.00 |
1,900.00 |
13,300.00 |
|
|
|
|
| 702-07-D |
cross drain safety end treatment (type 4)
|
5   |
EACH |
4,000.00 |
20,000.00 |
5,700.00 |
28,500.00 |
|
|
|
|
| 702-08-A |
side drain safety end treatment (type 1)
|
46   |
EACH |
2,000.00 |
92,000.00 |
900.00 |
41,400.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
75.0 |
LNFT |
40.00 |
3,000.00 |
29.00 |
2,175.00 |
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
75.0 |
LNFT |
40.00 |
3,000.00 |
50.00 |
3,750.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
112.5 |
LNFT |
20.00 |
2,250.00 |
16.50 |
1,856.25 |
|
|
|
|
| 704-06 |
guard rail anchor sections (trailing end)
|
18.8 |
LNFT |
90.00 |
1,692.00 |
72.50 |
1,363.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
3   |
EACH |
2,000.00 |
6,000.00 |
1,850.00 |
5,550.00 |
|
|
|
|
| 705-01 |
barbed wire fence
|
6,292   |
LNFT |
6.00 |
37,752.00 |
4.75 |
29,887.00 |
|
|
|
|
| 705-04 |
single swinging driveway gates
|
3   |
EACH |
600.00 |
1,800.00 |
500.00 |
1,500.00 |
|
|
|
|
| 705-05 |
double swinging driveway gates
|
1   |
DBGT |
900.00 |
900.00 |
750.00 |
750.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
64.9 |
SQYD |
90.00 |
5,841.00 |
75.00 |
4,867.50 |
|
|
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
399.0 |
SQYD |
55.00 |
21,945.00 |
60.00 |
23,940.00 |
|
|
|
|
| 707-01 |
concrete curb
|
394.0 |
LNFT |
23.00 |
9,062.00 |
18.00 |
7,092.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
815.6 |
LNFT |
35.00 |
28,546.00 |
24.00 |
19,574.40 |
|
|
|
|
| 708-01 |
right-of-way monument
|
148   |
EACH |
350.00 |
51,800.00 |
120.00 |
17,760.00 |
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
148   |
EACH |
350.00 |
51,800.00 |
85.00 |
12,580.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb, 14"thick)
|
92   |
SQYD |
75.00 |
6,900.00 |
100.00 |
9,200.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
92   |
SQYD |
12.00 |
1,104.00 |
5.00 |
460.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
200,000.00 |
200,000.00 |
1,000,000.00 |
1,000,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
1.372 |
MILE |
600.00 |
823.20 |
250.00 |
343.00 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
0.536 |
MILE |
4,000.00 |
2,144.00 |
5,000.00 |
2,680.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
141.16 |
ACRE |
600.00 |
84,696.00 |
500.00 |
70,580.00 |
|
|
|
|
| 717-01 |
seeding
|
2,824   |
LB |
11.00 |
31,064.00 |
9.00 |
25,416.00 |
|
|
|
|
| 718-01 |
fertilizer
|
141,162   |
LB |
0.40 |
56,464.80 |
0.30 |
42,348.60 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
25,000.00 |
25,000.00 |
27,000.00 |
27,000.00 |
|
|
|
|
| 725-01 |
temporary detour roads
|
550.0 |
LNFT |
200.00 |
110,000.00 |
350.00 |
192,500.00 |
|
|
|
|
| 726-01 |
bedding material
|
437.9 |
CUYD |
100.00 |
43,790.00 |
85.00 |
37,221.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
1,600,000.00 |
1,600,000.00 |
1,500,000.00 |
1,500,000.00 |
|
|
|
|
| 728-01-A |
jack or bored pipe (24" rcp/pcp)
|
89.0 |
LNFT |
550.00 |
48,950.00 |
450.00 |
40,050.00 |
|
|
|
|
| 728-01-B |
jack or bored pipe (36" rcp/pcp)
|
160.0 |
LNFT |
750.00 |
120,000.00 |
600.00 |
96,000.00 |
|
|
|
|
| 729-19-A |
dead end roadway installation (type a)
|
8   |
EACH |
4,000.00 |
32,000.00 |
2,850.00 |
22,800.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,347   |
EACH |
6.00 |
14,082.00 |
5.50 |
12,908.50 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
37.833 |
MILE |
2,500.00 |
94,582.50 |
2,600.00 |
98,365.80 |
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.760 |
MILE |
4,000.00 |
3,040.00 |
15,000.00 |
11,400.00 |
|
|
|
|
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.114 |
MILE |
12,000.00 |
1,368.00 |
40,000.00 |
4,560.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
9   |
EACH |
150.00 |
1,350.00 |
350.00 |
3,150.00 |
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
5   |
EACH |
200.00 |
1,000.00 |
350.00 |
1,750.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
11   |
EACH |
200.00 |
2,200.00 |
350.00 |
3,850.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
22.988 |
MILE |
6,000.00 |
137,928.00 |
650.00 |
14,942.20 |
|
|
|
|
| 735-01 |
mailboxes
|
20   |
EACH |
100.00 |
2,000.00 |
5.00 |
100.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
20   |
EACH |
200.00 |
4,000.00 |
175.00 |
3,500.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
240,000.00 |
240,000.00 |
400,000.00 |
400,000.00 |
|
|
|
|
| 742-02 |
adjusting sanitary sewer house connections
|
2   |
EACH |
2,000.00 |
4,000.00 |
1,250.00 |
2,500.00 |
|
|
|
|
| 744-01 |
traffic contraol management
|
lump |
LUMP |
80,000.00 |
80,000.00 |
125,000.00 |
125,000.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
9.98 |
CUYD |
1,500.00 |
14,970.00 |
1,200.00 |
11,976.00 |
|
|
|
|
| 805-12-E-01 |
reinforced concrete box culverts (4'x 4')(extension)
|
26.0 |
LNFT |
500.00 |
13,000.00 |
700.00 |
18,200.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
1,297   |
LB |
2.00 |
2,594.00 |
6.00 |
7,782.00 |
|
|
|
|
| S-001 |
rumble strips (ground-in)
|
17.0 |
MILE |
1,000.00 |
17,000.00 |
600.00 |
10,200.00 |
|
|
|
|
| S-002 |
saw cut existing concrete
|
8,572   |
LNFT |
5.00 |
42,860.00 |
2.00 |
17,144.00 |
|
|
|
|
| | SUBTOTAL GENERAL |
|
|
|
9,081,283.75 |
|
10,078,141.65 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
|
|
|
|
|
|
|
|
|
|
|
| 302-02-C-01 |
class ii base course (10" thick)(stone or recycled
pccp) |
51,706.3 |
SQYD |
18.00 |
930,713.40 |
19.50 |
1,008,272.85 |
|
|
|
|
| 302-02-C-02 |
class ii base course (10" thick)(soil cement)
|
172,762.1 |
SQYD |
12.00 |
2,073,145.20 |
11.50 |
1,986,764.15 |
|
|
|
|
| 302-02-E-01 |
class ii base course (4" thick)(stone or recycled pccp)
|
170,814.7 |
SQYD |
9.00 |
1,537,332.30 |
9.00 |
1,537,332.30 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
50,950.6 |
TON |
69.00 |
3,515,591.40 |
53.00 |
2,700,381.80 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
7,647.6 |
TON |
89.00 |
680,636.40 |
85.00 |
650,046.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
15.119 |
MILE |
1,000.00 |
15,119.00 |
1,250.00 |
18,898.75 |
|
|
|
|
| | SUBTOTAL ALT A1 |
|
|
|
8,752,537.70 |
|
7,901,695.85 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
|
|
|
|
|
|
|
|
|
|
|
| 302-02-C-01 |
class ii base course (10" thick)(stone or recycled
pccp) |
51,706.3 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 302-02-E-01 |
class ii base course (4" thick)(stone or recycled pccp)
|
170,814.7 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 302-02-F-01 |
class ii base course (8" thick)(soil cement)
|
172,762.1 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
4,926.1 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
988.0 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 601-01-G |
portland cement concrete pavement (8" thick)
|
136,427.1 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 601-02-G |
portland cement concrete pavement (8" thick)
(crossovers & turnouts) |
22,922.4 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 601-04 |
portland cement concrete pavement coring
|
210   |
EACH |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 732-03-A |
plastic pvmt striping (broken line)(4"width)
|
7.395 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)preformed
marking tape (type 5) |
7.724 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
17,833,821.45 |
|
17,979,837.50 |
|
|
|
|
|