| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JACK B. HARPER CONTRACTOR, INC. |
- 2 - ALPHA SERVICE AND PRODUCTS, INC. |
- 3 - ATWOOD FENCE COMPANY INC. |
UNITED RENTALS HWY TECHNOLOGIES INC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
585   |
LNFT |
2.50 |
1,462.50 |
5.00 |
2,925.00 |
5.00 |
2,925.00 |
4.50 |
2,632.50 |
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
75.0 |
LNFT |
43.00 |
3,225.00 |
55.00 |
4,125.00 |
50.00 |
3,750.00 |
40.00 |
3,000.00 |
| 704-03 |
blocked out guard rail
|
1,843.8 |
LNFT |
19.00 |
35,032.20 |
15.75 |
29,039.85 |
20.00 |
36,876.00 |
18.00 |
33,188.40 |
| 704-06 |
guard rail anchor sections (trailing end)
|
6.3 |
LNFT |
64.00 |
403.20 |
80.00 |
504.00 |
65.00 |
409.50 |
60.00 |
378.00 |
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
1,900.00 |
3,800.00 |
1,800.00 |
3,600.00 |
2,000.00 |
4,000.00 |
2,000.00 |
4,000.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
1   |
EACH |
2,400.00 |
2,400.00 |
2,500.00 |
2,500.00 |
2,500.00 |
2,500.00 |
2,250.00 |
2,250.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
210.4 |
SQYD |
48.00 |
10,099.20 |
70.00 |
14,728.00 |
60.00 |
12,624.00 |
60.00 |
12,624.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
2,700.00 |
2,700.00 |
3,000.00 |
3,000.00 |
6,500.00 |
6,500.00 |
4,500.00 |
4,500.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
340   |
SQYD |
2.00 |
680.00 |
5.00 |
1,700.00 |
2.00 |
680.00 |
7.00 |
2,380.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
5,500.00 |
5,500.00 |
7,500.00 |
7,500.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
75.00 |
300.00 |
75.00 |
300.00 |
70.00 |
280.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
530.00 |
530.00 |
1,500.00 |
1,500.00 |
2,500.00 |
2,500.00 |
3,000.00 |
3,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
1,500.00 |
1,500.00 |
1,500.00 |
1,500.00 |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
63,132.10 |
|
67,421.85 |
|
83,564.50 |
|
IRREGULAR |
|