| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
2,000   |
SQYD |
10.00 |
20,000.00 |
8.00 |
16,000.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
520.0 |
LNFT |
5.00 |
2,600.00 |
5.00 |
2,600.00 |
|
|
|
|
| 202-02-J |
removal of existing above ground pipe
|
6   |
EACH |
250.00 |
1,500.00 |
1,000.00 |
6,000.00 |
|
|
|
|
| 202-02-K |
removal of existing concrete headwalls
|
17   |
EACH |
550.00 |
9,350.00 |
200.00 |
3,400.00 |
|
|
|
|
| 202-02-L |
removal of existing steel headwalls and sheeting
|
6   |
EACH |
500.00 |
3,000.00 |
300.00 |
1,800.00 |
|
|
|
|
| 202-03-B |
relocation of existing sign w/flashing caution lights
|
2   |
EACH |
2,000.00 |
4,000.00 |
1,900.00 |
3,800.00 |
|
|
|
|
| 202-03-C |
relocation of existing steel post
|
4   |
EACH |
350.00 |
1,400.00 |
1,000.00 |
4,000.00 |
|
|
|
|
| 203-01 |
general excavation
|
9,094   |
CUYD |
9.50 |
86,393.00 |
1.00 |
9,094.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
262   |
CUYD |
20.00 |
5,240.00 |
30.00 |
7,860.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
200.0 |
CUYD |
40.00 |
8,000.00 |
40.00 |
8,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
15,514.9 |
TON |
50.00 |
775,745.00 |
60.00 |
930,894.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,376.9 |
TON |
110.00 |
151,459.00 |
80.00 |
110,152.00 |
|
|
|
|
| 701-01-G |
cross drain pipe (18" rcp/pcp)
|
37   |
LNFT |
85.00 |
3,145.00 |
70.00 |
2,590.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
4,218   |
LNFT |
36.00 |
151,848.00 |
40.00 |
168,720.00 |
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
9,291   |
LNFT |
46.00 |
427,386.00 |
47.00 |
436,677.00 |
|
|
|
|
| 701-04-A |
storm drain pipe arch (15" equiv. rcpa)
|
102   |
LNFT |
48.00 |
4,896.00 |
55.00 |
5,610.00 |
|
|
|
|
| 701-04-B |
storm drain pipe arch (18" equiv. rcpa)
|
3,544   |
LNFT |
55.00 |
194,920.00 |
60.00 |
212,640.00 |
|
|
|
|
| 701-04-G |
storm drain pipe arch (42" equiv. rcpa)
|
35   |
LNFT |
160.00 |
5,600.00 |
145.00 |
5,075.00 |
|
|
|
|
| 701-07-C |
yard drain pipe (8")
|
100   |
LNFT |
21.00 |
2,100.00 |
30.00 |
3,000.00 |
|
|
|
|
| 701-14 |
cleaning existing pipes
|
4,039   |
LNFT |
4.50 |
18,175.50 |
5.00 |
20,195.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
181   |
EACH |
2,600.00 |
470,600.00 |
3,500.00 |
633,500.00 |
|
|
|
|
| 702-03-B |
catch basins (cb-02)
|
9   |
EACH |
3,800.00 |
34,200.00 |
4,500.00 |
40,500.00 |
|
|
|
|
| 702-03-H |
catch basins (cb-05)
|
10   |
EACH |
725.00 |
7,250.00 |
1,200.00 |
12,000.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
8   |
EACH |
325.00 |
2,600.00 |
500.00 |
4,000.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
23   |
EACH |
900.00 |
20,700.00 |
300.00 |
6,900.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
2,000.0 |
SQYD |
43.00 |
86,000.00 |
45.00 |
90,000.00 |
|
|
|
|
| 707-04 |
asphaltic curb
|
12,000.0 |
LNFT |
6.00 |
72,000.00 |
3.00 |
36,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
65,000.00 |
65,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
4,500   |
LNFT |
0.01 |
45.00 |
0.10 |
450.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
198   |
LNFT |
0.10 |
19.80 |
0.30 |
59.40 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
8.233 |
MILE |
5.00 |
41.16 |
10.00 |
82.33 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
16.438 |
MILE |
10.00 |
164.38 |
10.00 |
164.38 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
32.876 |
MILE |
15.00 |
493.14 |
20.00 |
657.52 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
10   |
EACH |
20.00 |
200.00 |
10.00 |
100.00 |
|
|
|
|
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
3   |
EACH |
50.00 |
150.00 |
30.00 |
90.00 |
|
|
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
250   |
SQYD |
45.00 |
11,250.00 |
50.00 |
12,500.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
250   |
SQYD |
45.00 |
11,250.00 |
65.00 |
16,250.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
300,000.00 |
300,000.00 |
390,000.00 |
390,000.00 |
|
|
|
|
| 729-19-C |
dead end road installations(type c)
|
3   |
EACH |
2,000.00 |
6,000.00 |
700.00 |
2,100.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
932   |
EACH |
7.00 |
6,524.00 |
7.00 |
6,524.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,500   |
LNFT |
1.00 |
1,500.00 |
1.00 |
1,500.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
66   |
LNFT |
3.00 |
198.00 |
3.00 |
198.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
10.959 |
MILE |
2,200.00 |
24,109.80 |
2,200.00 |
24,109.80 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.479 |
MILE |
800.00 |
4,383.20 |
800.00 |
4,383.20 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
10   |
EACH |
160.00 |
1,600.00 |
160.00 |
1,600.00 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
3   |
EACH |
170.00 |
510.00 |
170.00 |
510.00 |
|
|
|
|
| 736-09 |
loop detector
|
300   |
LNFT |
13.00 |
3,900.00 |
13.00 |
3,900.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
40,000.00 |
40,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| 741-06 |
relocating fire hydrant
|
12   |
EACH |
2,500.00 |
30,000.00 |
800.00 |
9,600.00 |
|
|
|
|
| 741-07 |
relocating water valve
|
1   |
EACH |
2,000.00 |
2,000.00 |
700.00 |
700.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
4,500.00 |
4,500.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-001 |
dynamic message sign unit
|
2   |
EACH |
10,000.00 |
20,000.00 |
20,000.00 |
40,000.00 |
|
|
|
|
| S-002 |
geotextile fabric
|
19,652   |
SQYD |
0.90 |
17,686.80 |
2.00 |
39,304.00 |
|
|
|
|
| S-003 |
relocating gas valve
|
1   |
EACH |
5,500.00 |
5,500.00 |
1,600.00 |
1,600.00 |
|
|
|
|
| S-004 |
stone bedding and backfill material (610 gradation)
(vehicular measure) |
20,000   |
CUYD |
32.50 |
650,000.00 |
26.00 |
520,000.00 |
|
|
|
|
| S-005 |
saw cutting of pavement
|
600   |
LNFT |
4.50 |
2,700.00 |
3.00 |
1,800.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,764,832.78 |
|
3,984,189.63 |
|
|
|
|
|