Letting of 7/27/2005 LA DOTD Headquarters


REBID
go back
Go Back
 
Lead Project: 744-60-0009
Parish: WEBSTER
Routes:
Description: CULLEN SIDEWALK PROJECT
Type Const: grading, drainage structures, class ii base course, concrete sidewalks, and related
work.
 
RankLicenseBidderAmount
141051 THE MECO GROUP INC. $183,051.00
223029 TRIAD BUILDERS OF RUSTON INC $239,916.72
 
Item Number Item Description Quantity Unit of Measure - 1 -
THE MECO GROUP INC.
- 2 -
TRIAD BUILDERS OF RUSTON INC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 6,000.00 6,000.00 1,160.00 1,160.00        
202-01 removal of structures & obstructions lump      LUMP 4,000.00 4,000.00 2,900.00 2,900.00        
202-02-G removal of surfacing & stabilized base 80.0    SQYD 15.00 1,200.00 14.00 1,120.00        
203-06 excavation & embankment lump      LUMP 6,500.00 6,500.00 5,800.00 5,800.00        
302-02 class ii base course (4" thick) 2,424.4    SQYD 9.00 21,819.60 15.66 37,966.10        
701-01-G cross drain pipe (18" rcp) 6      LNFT 80.00 480.00 145.00 870.00        
701-01-I cross drain pipe (24" rcp) 30      LNFT 80.00 2,400.00 145.00 4,350.00        
701-05-G side drain pipe (18"rcp) 160      LNFT 55.00 8,800.00 58.00 9,280.00        
702-01 junction boxes 2      EACH 1,500.00 3,000.00 2,900.00 5,800.00        
706-01-A concrete walk (4" thick) 2,159.1    SQYD 34.00 73,409.40 46.40 100,182.24        
706-01-C concrete walk (6" thick) 265.3    SQYD 50.00 13,265.00 52.20 13,848.66        
713-01 temporary signs & barricades lump      LUMP 4,000.00 4,000.00 5,800.00 5,800.00        
727-01 mobilization lump      LUMP 20,000.00 20,000.00 35,000.00 35,000.00        
732-01-D plastic pavement striping (12" width) 1,198      LNFT 1.50 1,797.00 4.14 4,959.72        
739-01 hydro-seeding 1.00   ACRE 2,500.00 2,500.00 1,800.00 1,800.00        
740-01 construction layout lump      LUMP 3,000.00 3,000.00 2,900.00 2,900.00        
741-11 adjusting water valve and meter box 1      EACH 500.00 500.00 580.00 580.00        
744-01 traffic control management lump      LUMP 5,000.00 5,000.00 3,500.00 3,500.00        
S-001 safety end treatment (for 24" rcp) 1      EACH 2,500.00 2,500.00 1,200.00 1,200.00        
S-002 saw cut, full depth 360      LNFT 8.00 2,880.00 2.50 900.00        
                       
 CONTRACTOR TOTAL       183,051.00   239,916.72        