| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - THE MECO GROUP INC. |
- 2 - TRIAD BUILDERS OF RUSTON INC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
6,000.00 |
6,000.00 |
1,160.00 |
1,160.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
4,000.00 |
4,000.00 |
2,900.00 |
2,900.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
80.0 |
SQYD |
15.00 |
1,200.00 |
14.00 |
1,120.00 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
6,500.00 |
6,500.00 |
5,800.00 |
5,800.00 |
|
|
|
|
| 302-02 |
class ii base course (4" thick)
|
2,424.4 |
SQYD |
9.00 |
21,819.60 |
15.66 |
37,966.10 |
|
|
|
|
| 701-01-G |
cross drain pipe (18" rcp)
|
6   |
LNFT |
80.00 |
480.00 |
145.00 |
870.00 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp)
|
30   |
LNFT |
80.00 |
2,400.00 |
145.00 |
4,350.00 |
|
|
|
|
| 701-05-G |
side drain pipe (18"rcp)
|
160   |
LNFT |
55.00 |
8,800.00 |
58.00 |
9,280.00 |
|
|
|
|
| 702-01 |
junction boxes
|
2   |
EACH |
1,500.00 |
3,000.00 |
2,900.00 |
5,800.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
2,159.1 |
SQYD |
34.00 |
73,409.40 |
46.40 |
100,182.24 |
|
|
|
|
| 706-01-C |
concrete walk (6" thick)
|
265.3 |
SQYD |
50.00 |
13,265.00 |
52.20 |
13,848.66 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
4,000.00 |
4,000.00 |
5,800.00 |
5,800.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
20,000.00 |
20,000.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
1,198   |
LNFT |
1.50 |
1,797.00 |
4.14 |
4,959.72 |
|
|
|
|
| 739-01 |
hydro-seeding
|
1.00 |
ACRE |
2,500.00 |
2,500.00 |
1,800.00 |
1,800.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,000.00 |
3,000.00 |
2,900.00 |
2,900.00 |
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
1   |
EACH |
500.00 |
500.00 |
580.00 |
580.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
5,000.00 |
5,000.00 |
3,500.00 |
3,500.00 |
|
|
|
|
| S-001 |
safety end treatment (for 24" rcp)
|
1   |
EACH |
2,500.00 |
2,500.00 |
1,200.00 |
1,200.00 |
|
|
|
|
| S-002 |
saw cut, full depth
|
360   |
LNFT |
8.00 |
2,880.00 |
2.50 |
900.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
183,051.00 |
|
239,916.72 |
|
|
|
|
|