| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - T. L. WALLACE CONSTRUCTION, INC. |
- 2 - COASTAL BRIDGE CO., L.L.C. |
- 3 - GUINN BROTHERS, LLC. |
- 4 - BOH BROS. CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
89,000.00 |
89,000.00 |
36,000.00 |
36,000.00 |
65,000.00 |
65,000.00 |
33,000.00 |
33,000.00 |
| 202-02-A-01 |
removal of bridge (sta. 101+58.720; 13.90 m x 6.15 m;
3 span timber bridge) |
1   |
ea |
2,000.00 |
2,000.00 |
6,000.00 |
6,000.00 |
8,500.00 |
8,500.00 |
3,200.00 |
3,200.00 |
| 202-02-A-02 |
removal of bridge (sta. 101+50.215; 25.80 m x 6.15 m;
5 span timber bridge) |
1   |
ea |
4,000.00 |
4,000.00 |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
6,500.00 |
6,500.00 |
| 202-02-A-03 |
removal of bridge (sta. 101+71.317; 28.96 m x 4.88 m;
6 span timber bridge) |
1   |
ea |
7,000.00 |
7,000.00 |
11,000.00 |
11,000.00 |
12,000.00 |
12,000.00 |
8,000.00 |
8,000.00 |
| 202-02-A-04 |
removal of bridge (sta. 102+41.386; 15.00m x 5.66m
timber bridge) |
1   |
ea |
2,000.00 |
2,000.00 |
7,000.00 |
7,000.00 |
8,500.00 |
8,500.00 |
3,200.00 |
3,200.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
1,187.0 |
sq m |
5.50 |
6,528.50 |
6.00 |
7,122.00 |
5.00 |
5,935.00 |
5.55 |
6,587.85 |
| 203-06 |
excavation & embankment
|
lump |
lump |
70,000.00 |
70,000.00 |
80,000.00 |
80,000.00 |
105,000.00 |
105,000.00 |
83,250.00 |
83,250.00 |
| 204-02 |
temporary hay or straw bales
|
120   |
ea |
9.00 |
1,080.00 |
8.00 |
960.00 |
10.00 |
1,200.00 |
7.75 |
930.00 |
| 204-03 |
temporary slope drains
|
30   |
ln m |
15.00 |
450.00 |
35.00 |
1,050.00 |
10.00 |
300.00 |
33.30 |
999.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
ea |
65.00 |
780.00 |
160.00 |
1,920.00 |
100.00 |
1,200.00 |
166.50 |
1,998.00 |
| 204-06 |
temporary silt fencing
|
150   |
ln m |
20.00 |
3,000.00 |
16.00 |
2,400.00 |
5.00 |
750.00 |
1.50 |
225.00 |
| 302-01 |
class ii base course
|
418.6 |
cu m |
129.00 |
53,999.40 |
70.00 |
29,302.00 |
85.00 |
35,581.00 |
75.50 |
31,604.30 |
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
173.3 |
cu m |
41.00 |
7,105.30 |
50.00 |
8,665.00 |
85.00 |
14,730.50 |
52.00 |
9,011.60 |
| 502-01 |
superpave asphaltic concrete
|
276.1 |
Mg |
120.00 |
33,132.00 |
120.00 |
33,132.00 |
175.00 |
48,317.50 |
180.00 |
49,698.00 |
| 701-01-O |
cross drain pipe (1200 mm rcp/pcp)
|
33.0 |
ln m |
285.00 |
9,405.00 |
550.00 |
18,150.00 |
700.00 |
23,100.00 |
560.00 |
18,480.00 |
| 701-01-P/Q |
cross drain pipe (1350 mm rcp/pcp or 1500 mm cmp)
|
71.2 |
ln m |
300.00 |
21,360.00 |
550.00 |
39,160.00 |
765.00 |
54,468.00 |
565.00 |
40,228.00 |
| 701-05-G |
side drain pipe (450 mm)
|
6.0 |
ln m |
80.00 |
480.00 |
130.00 |
780.00 |
250.00 |
1,500.00 |
130.00 |
780.00 |
| 702-05-A |
cross drain end treatment (4-barrell 1350 mm rcp/pcp
or 1500 mm cmp) |
2   |
ea |
2,100.00 |
4,200.00 |
5,000.00 |
10,000.00 |
7,500.00 |
15,000.00 |
5,000.00 |
10,000.00 |
| 702-05-B |
cross drain end treatment (2-barrell 1200 mm rcp/pcp)
|
2   |
ea |
1,500.00 |
3,000.00 |
6,000.00 |
12,000.00 |
4,500.00 |
9,000.00 |
4,600.00 |
9,200.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
60.96 |
ln m |
150.00 |
9,144.00 |
150.00 |
9,144.00 |
170.00 |
10,363.20 |
160.00 |
9,753.60 |
| 704-09 |
guard rail anchor sections (turndown)
|
60.96 |
ln m |
120.00 |
7,315.20 |
150.00 |
9,144.00 |
150.00 |
9,144.00 |
160.00 |
9,753.60 |
| 705-01 |
barbed wire fence
|
240   |
ln m |
16.00 |
3,840.00 |
18.00 |
4,320.00 |
18.00 |
4,320.00 |
18.00 |
4,320.00 |
| 711-01-D |
riprap (25 kg,460 mm thick)
|
683   |
sq m |
55.00 |
37,565.00 |
65.00 |
44,395.00 |
75.00 |
51,225.00 |
65.50 |
44,736.50 |
| 711-04 |
geotextile fabric
|
683   |
sq m |
3.00 |
2,049.00 |
3.00 |
2,049.00 |
5.00 |
3,415.00 |
2.75 |
1,878.25 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
15,000.00 |
15,000.00 |
18,000.00 |
18,000.00 |
35,000.00 |
35,000.00 |
9,800.00 |
9,800.00 |
| 726-01 |
bedding material
|
72.0 |
cu m |
70.00 |
5,040.00 |
60.00 |
4,320.00 |
85.00 |
6,120.00 |
55.50 |
3,996.00 |
| 727-01 |
mobilization
|
lump |
lump |
50,000.00 |
50,000.00 |
75,000.00 |
75,000.00 |
145,000.00 |
145,000.00 |
168,000.00 |
168,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
8   |
ea |
60.00 |
480.00 |
50.00 |
400.00 |
80.00 |
640.00 |
50.00 |
400.00 |
| 729-16-C |
object marker assembly (type 3)
|
16   |
ea |
70.00 |
1,120.00 |
80.00 |
1,280.00 |
90.00 |
1,440.00 |
72.00 |
1,152.00 |
| 740-01 |
construction layout
|
lump |
lump |
12,000.00 |
12,000.00 |
15,000.00 |
15,000.00 |
25,000.00 |
25,000.00 |
45,000.00 |
45,000.00 |
| 744-01 |
traffic control management
|
lump |
lump |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
5,000.00 |
5,000.00 |
| 804-01-B |
precast concrete piles (350 mm)
|
979.2 |
ln m |
95.00 |
93,024.00 |
135.00 |
132,192.00 |
140.00 |
137,088.00 |
128.00 |
125,337.60 |
| 804-12 |
loading permanent piles
|
2   |
ea |
1.00 |
2.00 |
100.00 |
200.00 |
1.00 |
2.00 |
8,325.00 |
16,650.00 |
| 805-10-A |
bridge superstructure & substructure (90 degree
crossing; 7.3 m rdwy) (curved) |
13   |
span |
20,000.00 |
260,000.00 |
26,000.00 |
338,000.00 |
21,000.00 |
273,000.00 |
29,800.00 |
387,400.00 |
| S-101 |
concrete approach slab (7.3 m rdwy, 90 degree
crossing,curved) |
4   |
ea |
7,200.00 |
28,800.00 |
5,000.00 |
20,000.00 |
7,500.00 |
30,000.00 |
6,585.00 |
26,340.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
863,899.40 |
|
998,085.00 |
|
1,169,839.20 |
|
1,176,409.30 |
|