DBE GOAL FED
Lead Project: 713-59-0194
Parish: E FELICIANA
Routes:
Description: TRIB.TO SPRING CREEK & BRIDGES OVER PRETTY & RICHLAND CREEK
Type Const: grading, class ii base course, drainage structures, superpave asphaltic concrete
pavement, portland cement concrete slab span bridges, and related work.
 
RankLicenseBidderAmount
114422 T. L. WALLACE CONSTRUCTION, INC. $863,899.40
200481 COASTAL BRIDGE CO., L.L.C. $998,085.00
309090 GUINN BROTHERS, LLC. $1,169,839.20
402179 BOH BROS. CONSTRUCTION CO., LLC. $1,176,409.30
 
Item Number Item Description Quantity Unit of Measure - 1 -
T. L. WALLACE CONSTRUCTION, INC.
- 2 -
COASTAL BRIDGE CO., L.L.C.
- 3 -
GUINN BROTHERS, LLC.
- 4 -
BOH BROS. CONSTRUCTION CO., LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 89,000.00 89,000.00 36,000.00 36,000.00 65,000.00 65,000.00 33,000.00 33,000.00
202-02-A-01 removal of bridge (sta. 101+58.720; 13.90 m x 6.15 m;
3 span timber bridge)
1      ea 2,000.00 2,000.00 6,000.00 6,000.00 8,500.00 8,500.00 3,200.00 3,200.00
202-02-A-02 removal of bridge (sta. 101+50.215; 25.80 m x 6.15 m;
5 span timber bridge)
1      ea 4,000.00 4,000.00 10,000.00 10,000.00 8,000.00 8,000.00 6,500.00 6,500.00
202-02-A-03 removal of bridge (sta. 101+71.317; 28.96 m x 4.88 m;
6 span timber bridge)
1      ea 7,000.00 7,000.00 11,000.00 11,000.00 12,000.00 12,000.00 8,000.00 8,000.00
202-02-A-04 removal of bridge (sta. 102+41.386; 15.00m x 5.66m
timber bridge)
1      ea 2,000.00 2,000.00 7,000.00 7,000.00 8,500.00 8,500.00 3,200.00 3,200.00
202-02-G removal of surfacing & stabilized base 1,187.0    sq m 5.50 6,528.50 6.00 7,122.00 5.00 5,935.00 5.55 6,587.85
203-06 excavation & embankment lump      lump 70,000.00 70,000.00 80,000.00 80,000.00 105,000.00 105,000.00 83,250.00 83,250.00
204-02 temporary hay or straw bales 120      ea 9.00 1,080.00 8.00 960.00 10.00 1,200.00 7.75 930.00
204-03 temporary slope drains 30      ln m 15.00 450.00 35.00 1,050.00 10.00 300.00 33.30 999.00
204-05-A temporary sediment check dams (hay) 12      ea 65.00 780.00 160.00 1,920.00 100.00 1,200.00 166.50 1,998.00
204-06 temporary silt fencing 150      ln m 20.00 3,000.00 16.00 2,400.00 5.00 750.00 1.50 225.00
302-01 class ii base course 418.6    cu m 129.00 53,999.40 70.00 29,302.00 85.00 35,581.00 75.50 31,604.30
403-01 aggregate roadway surfacing (vehicular measurement) 173.3    cu m 41.00 7,105.30 50.00 8,665.00 85.00 14,730.50 52.00 9,011.60
502-01 superpave asphaltic concrete 276.1    Mg 120.00 33,132.00 120.00 33,132.00 175.00 48,317.50 180.00 49,698.00
701-01-O cross drain pipe (1200 mm rcp/pcp) 33.0    ln m 285.00 9,405.00 550.00 18,150.00 700.00 23,100.00 560.00 18,480.00
701-01-P/Q cross drain pipe (1350 mm rcp/pcp or 1500 mm cmp) 71.2    ln m 300.00 21,360.00 550.00 39,160.00 765.00 54,468.00 565.00 40,228.00
701-05-G side drain pipe (450 mm) 6.0    ln m 80.00 480.00 130.00 780.00 250.00 1,500.00 130.00 780.00
702-05-A cross drain end treatment (4-barrell 1350 mm rcp/pcp
or 1500 mm cmp)
2      ea 2,100.00 4,200.00 5,000.00 10,000.00 7,500.00 15,000.00 5,000.00 10,000.00
702-05-B cross drain end treatment (2-barrell 1200 mm rcp/pcp) 2      ea 1,500.00 3,000.00 6,000.00 12,000.00 4,500.00 9,000.00 4,600.00 9,200.00
704-08-B guard rail transitions (double thrie beam) 60.96   ln m 150.00 9,144.00 150.00 9,144.00 170.00 10,363.20 160.00 9,753.60
704-09 guard rail anchor sections (turndown) 60.96   ln m 120.00 7,315.20 150.00 9,144.00 150.00 9,144.00 160.00 9,753.60
705-01 barbed wire fence 240      ln m 16.00 3,840.00 18.00 4,320.00 18.00 4,320.00 18.00 4,320.00
711-01-D riprap (25 kg,460 mm thick) 683      sq m 55.00 37,565.00 65.00 44,395.00 75.00 51,225.00 65.50 44,736.50
711-04 geotextile fabric 683      sq m 3.00 2,049.00 3.00 2,049.00 5.00 3,415.00 2.75 1,878.25
713-01 temporary signs & barricades lump      lump 15,000.00 15,000.00 18,000.00 18,000.00 35,000.00 35,000.00 9,800.00 9,800.00
726-01 bedding material 72.0    cu m 70.00 5,040.00 60.00 4,320.00 85.00 6,120.00 55.50 3,996.00
727-01 mobilization lump      lump 50,000.00 50,000.00 75,000.00 75,000.00 145,000.00 145,000.00 168,000.00 168,000.00
729-16-B object marker assembly (type 2) 8      ea 60.00 480.00 50.00 400.00 80.00 640.00 50.00 400.00
729-16-C object marker assembly (type 3) 16      ea 70.00 1,120.00 80.00 1,280.00 90.00 1,440.00 72.00 1,152.00
740-01 construction layout lump      lump 12,000.00 12,000.00 15,000.00 15,000.00 25,000.00 25,000.00 45,000.00 45,000.00
744-01 traffic control management lump      lump 20,000.00 20,000.00 10,000.00 10,000.00 20,000.00 20,000.00 5,000.00 5,000.00
804-01-B precast concrete piles (350 mm) 979.2    ln m 95.00 93,024.00 135.00 132,192.00 140.00 137,088.00 128.00 125,337.60
804-12 loading permanent piles 2      ea 1.00 2.00 100.00 200.00 1.00 2.00 8,325.00 16,650.00
805-10-A bridge superstructure & substructure (90 degree
crossing; 7.3 m rdwy) (curved)
13      span 20,000.00 260,000.00 26,000.00 338,000.00 21,000.00 273,000.00 29,800.00 387,400.00
S-101 concrete approach slab (7.3 m rdwy, 90 degree
crossing,curved)
4      ea 7,200.00 28,800.00 5,000.00 20,000.00 7,500.00 30,000.00 6,585.00 26,340.00
                       
 CONTRACTOR TOTAL       863,899.40   998,085.00   1,169,839.20   1,176,409.30