| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - FORDICE CONSTRUCTION CO. |
- 2 - CHAMBERS CONSTRUCTION CO., INC. |
- 3 - COASTAL BRIDGE CO., L.L.C. |
- 4 - T. L. WALLACE CONSTRUCTION, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
19,000.00 |
19,000.00 |
80,000.00 |
80,000.00 |
| 202-02-A-01 |
removal of bridge(sta. 105+00, 19.4' wide x 50.1' long
timber bridge) |
1   |
EACH |
5,000.00 |
5,000.00 |
8,000.00 |
8,000.00 |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
| 202-02-A-02 |
removal of bridge(sta. 105+00, 21.0' wide x 36.06'
long timber bridge) |
1   |
EACH |
5,000.00 |
5,000.00 |
4,000.00 |
4,000.00 |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
| 202-02-A-03 |
removal of bridge(sta. 105+00, 24.49' wide x 39.06'
long timber bridge) |
1   |
EACH |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
410.2 |
SQYD |
6.50 |
2,666.30 |
12.00 |
4,922.40 |
7.00 |
2,871.40 |
7.00 |
2,871.40 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
25,000.00 |
25,000.00 |
30,000.00 |
30,000.00 |
21,000.00 |
21,000.00 |
25,000.00 |
25,000.00 |
| 204-02 |
temporary hay or straw bales
|
250   |
EACH |
10.50 |
2,625.00 |
10.00 |
2,500.00 |
10.00 |
2,500.00 |
10.00 |
2,500.00 |
| 204-03 |
temporary slope drains
|
350   |
LNFT |
5.00 |
1,750.00 |
1.00 |
350.00 |
2.00 |
700.00 |
6.00 |
2,100.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
EACH |
225.00 |
2,700.00 |
25.00 |
300.00 |
200.00 |
2,400.00 |
200.00 |
2,400.00 |
| 204-06 |
temporary silt fencing
|
640   |
LNFT |
4.00 |
2,560.00 |
3.00 |
1,920.00 |
2.00 |
1,280.00 |
3.00 |
1,920.00 |
| 302-01 |
class ii base course
|
110.1 |
CUYD |
90.00 |
9,909.00 |
120.00 |
13,212.00 |
90.00 |
9,909.00 |
115.00 |
12,661.50 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
22   |
CUYD |
65.00 |
1,430.00 |
85.00 |
1,870.00 |
65.00 |
1,430.00 |
190.00 |
4,180.00 |
| 502-01 |
superpave asphaltic concrete
|
257.0 |
TON |
160.00 |
41,120.00 |
160.00 |
41,120.00 |
135.00 |
34,695.00 |
135.00 |
34,695.00 |
| 701-05-G |
side drain pipe (18")
|
91   |
LNFT |
42.50 |
3,867.50 |
30.00 |
2,730.00 |
45.00 |
4,095.00 |
40.00 |
3,640.00 |
| 701-05-G-01 |
side drain pipe (18")(erosion)
|
365   |
LNFT |
26.00 |
9,490.00 |
30.00 |
10,950.00 |
40.00 |
14,600.00 |
30.00 |
10,950.00 |
| 701-05-I-01 |
side drain pipe (24")(erosion)
|
397   |
LNFT |
31.50 |
12,505.50 |
38.00 |
15,086.00 |
60.00 |
23,820.00 |
35.00 |
13,895.00 |
| 701-06-D-01 |
side drain pipe arch (24" equiv.)(erosion)
|
122   |
LNFT |
45.00 |
5,490.00 |
42.00 |
5,124.00 |
60.00 |
7,320.00 |
45.00 |
5,490.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
43.00 |
8,600.00 |
60.00 |
12,000.00 |
50.00 |
10,000.00 |
45.00 |
9,000.00 |
| 704-09 |
guard rail anchor sections (turndown)
|
200.0 |
LNFT |
32.00 |
6,400.00 |
35.00 |
7,000.00 |
40.00 |
8,000.00 |
35.00 |
7,000.00 |
| 705-01 |
barbed wire fence
|
600   |
LNFT |
8.50 |
5,100.00 |
8.00 |
4,800.00 |
8.00 |
4,800.00 |
5.00 |
3,000.00 |
| 711-01-C |
riprap (30 lb, 14" thick)
|
522   |
SQYD |
32.00 |
16,704.00 |
60.00 |
31,320.00 |
45.00 |
23,490.00 |
45.00 |
23,490.00 |
| 711-04 |
geotextile fabric
|
522   |
SQYD |
2.00 |
1,044.00 |
2.00 |
1,044.00 |
3.00 |
1,566.00 |
2.00 |
1,044.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
18,000.00 |
18,000.00 |
14,000.00 |
14,000.00 |
| 724-02 |
pavement widening
|
252.9 |
SQYD |
65.00 |
16,438.50 |
100.00 |
25,290.00 |
80.00 |
20,232.00 |
80.00 |
20,232.00 |
| 726-01 |
bedding material
|
117.8 |
CUYD |
55.00 |
6,479.00 |
60.00 |
7,068.00 |
55.00 |
6,479.00 |
55.00 |
6,479.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
25,000.00 |
25,000.00 |
26,900.00 |
26,900.00 |
78,000.00 |
78,000.00 |
60,000.00 |
60,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
80.00 |
320.00 |
70.00 |
280.00 |
70.00 |
280.00 |
60.00 |
240.00 |
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
80.00 |
1,280.00 |
85.00 |
1,360.00 |
80.00 |
1,280.00 |
70.00 |
1,120.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
14,000.00 |
14,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
| 804-01-B |
precast concrete piles (14")
|
1,404   |
LNFT |
30.00 |
42,120.00 |
40.00 |
56,160.00 |
42.00 |
58,968.00 |
31.00 |
43,524.00 |
| 804-12 |
loading permanent piles
|
2   |
EACH |
FREE |
FREE |
100.00 |
200.00 |
100.00 |
200.00 |
1.00 |
2.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
20.58 |
CUYD |
700.00 |
14,406.00 |
500.00 |
10,290.00 |
700.00 |
14,406.00 |
660.00 |
13,582.80 |
| 805-10-A |
bridge superstructure & substructure (24' clr. rdwy;
90 degree crossing) |
6   |
SPAN |
15,500.00 |
93,000.00 |
20,000.00 |
120,000.00 |
19,400.00 |
116,400.00 |
18,000.00 |
108,000.00 |
| 805-12-H |
reinforced concrete box culverts (7'x 4')
|
188.0 |
LNFT |
350.00 |
65,800.00 |
325.00 |
61,100.00 |
350.00 |
65,800.00 |
330.00 |
62,040.00 |
| 806-01 |
deformed reinforcing steel
|
2,458   |
LB |
1.10 |
2,703.80 |
1.00 |
2,458.00 |
1.00 |
2,458.00 |
1.00 |
2,458.00 |
| 813-01 |
concrete approach slabs
|
111.12 |
SQYD |
175.00 |
19,446.00 |
170.00 |
18,890.40 |
175.00 |
19,446.00 |
175.00 |
19,446.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
520,954.60 |
|
579,244.80 |
|
623,425.40 |
|
635,960.70 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - JAMES CONSTRUCTION GROUP LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
30,000.00 |
30,000.00 |
|
|
|
|
|
|
| 202-02-A-01 |
removal of bridge(sta. 105+00, 19.4' wide x 50.1' long
timber bridge) |
1   |
EACH |
12,000.00 |
12,000.00 |
|
|
|
|
|
|
| 202-02-A-02 |
removal of bridge(sta. 105+00, 21.0' wide x 36.06'
long timber bridge) |
1   |
EACH |
12,000.00 |
12,000.00 |
|
|
|
|
|
|
| 202-02-A-03 |
removal of bridge(sta. 105+00, 24.49' wide x 39.06'
long timber bridge) |
1   |
EACH |
12,000.00 |
12,000.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
410.2 |
SQYD |
15.00 |
6,153.00 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
50,000.00 |
50,000.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
250   |
EACH |
7.00 |
1,750.00 |
|
|
|
|
|
|
| 204-03 |
temporary slope drains
|
350   |
LNFT |
1.50 |
525.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
EACH |
150.00 |
1,800.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
640   |
LNFT |
1.35 |
864.00 |
|
|
|
|
|
|
| 302-01 |
class ii base course
|
110.1 |
CUYD |
80.00 |
8,808.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
22   |
CUYD |
70.00 |
1,540.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
257.0 |
TON |
150.00 |
38,550.00 |
|
|
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
91   |
LNFT |
60.00 |
5,460.00 |
|
|
|
|
|
|
| 701-05-G-01 |
side drain pipe (18")(erosion)
|
365   |
LNFT |
70.00 |
25,550.00 |
|
|
|
|
|
|
| 701-05-I-01 |
side drain pipe (24")(erosion)
|
397   |
LNFT |
80.00 |
31,760.00 |
|
|
|
|
|
|
| 701-06-D-01 |
side drain pipe arch (24" equiv.)(erosion)
|
122   |
LNFT |
100.00 |
12,200.00 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
45.00 |
9,000.00 |
|
|
|
|
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
200.0 |
LNFT |
25.00 |
5,000.00 |
|
|
|
|
|
|
| 705-01 |
barbed wire fence
|
600   |
LNFT |
7.00 |
4,200.00 |
|
|
|
|
|
|
| 711-01-C |
riprap (30 lb, 14" thick)
|
522   |
SQYD |
55.00 |
28,710.00 |
|
|
|
|
|
|
| 711-04 |
geotextile fabric
|
522   |
SQYD |
3.00 |
1,566.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
16,000.00 |
16,000.00 |
|
|
|
|
|
|
| 724-02 |
pavement widening
|
252.9 |
SQYD |
80.00 |
20,232.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
117.8 |
CUYD |
85.00 |
10,013.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
50.00 |
200.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
80.00 |
1,280.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
1,404   |
LNFT |
90.00 |
126,360.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
2   |
EACH |
3,500.00 |
7,000.00 |
|
|
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
20.58 |
CUYD |
1,500.00 |
30,870.00 |
|
|
|
|
|
|
| 805-10-A |
bridge superstructure & substructure (24' clr. rdwy;
90 degree crossing) |
6   |
SPAN |
25,000.00 |
150,000.00 |
|
|
|
|
|
|
| 805-12-H |
reinforced concrete box culverts (7'x 4')
|
188.0 |
LNFT |
600.00 |
112,800.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
2,458   |
LB |
1.00 |
2,458.00 |
|
|
|
|
|
|
| 813-01 |
concrete approach slabs
|
111.12 |
SQYD |
260.00 |
28,891.20 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
930,540.20 |
|
|
|
|
|
|
|