Letting of 7/27/2005 LA DOTD Headquarters


REBID
go back
Go Back
 
Lead Project: 451-07-0061
Parish: RICHLAND
Routes: I-20
Description: INTERCHANGE LIGHTING I-20 @ LA 137 (RAYVILLE)
Type Const: roadway lightng and related work.
 
RankLicenseBidderAmount
101165 ERNEST P. BREAUX ELECTRICAL, INC. $382,025.50
213082 WYE ELECTRIC, INC. $405,352.50
01692 TOOMER ELECTRICAL CO., INC. IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
ERNEST P. BREAUX ELECTRICAL, INC.
- 2 -
WYE ELECTRIC, INC.

TOOMER ELECTRICAL CO., INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 5,400.00 5,400.00 4,000.00 4,000.00 4,242.00 4,242.00    
713-01 temporary signs & barricades lump      LUMP 5,400.00 5,400.00 8,000.00 8,000.00 5,040.00 5,040.00    
727-01 mobilization lump      LUMP 1,500.00 1,500.00 1,000.00 1,000.00 23,372.00 23,372.00    
730-01 trenching and backfilling 5,325      LNFT 5.20 27,690.00 2.50 13,312.50 1.10 5,857.50    
730-02-A conduit with conductors (2" galvanized rigid steel,
3#1)
120      LNFT 14.40 1,728.00 19.00 2,280.00 15.00 1,800.00    
730-02-B conduit with conductors (2" schedule 40 pvc, 3#1) 200      LNFT 7.30 1,460.00 9.00 1,800.00 7.06 1,412.00    
730-02-C conduit with conductors (1-1/2" schedule 40 pvc, 2#2,
2#6, 1#2 bare)
250      LNFT 7.60 1,900.00 9.60 2,400.00 8.09 2,022.50    
730-02-D conduit with conductors (1-1/2" schedule 40 pvc, 2#2,
2#4, 1#2 bare)
700      LNFT 7.60 5,320.00 9.00 6,300.00 6.27 4,389.00    
730-02-E conduit with conductors (1-1/4" schedule 40 pvc, 4#6,
1#6 bare)
700      LNFT 5.20 3,640.00 5.80 4,060.00 4.97 3,479.00    
730-02-F conduit with conductors (1-1/4" schedule 40 pvc, 2#2,
1#2 bare)
225      LNFT 6.00 1,350.00 6.40 1,440.00 4.20 945.00    
730-02-G conduit with conductors (1-1/4" schedule 40 pvc, 2#4,
1#4 bare)
525      LNFT 4.65 2,441.25 4.50 2,362.50 4.22 2,215.50    
730-02-H conduit with conductors (1-1/4" schedule 40 pvc, 2#6,
1#6 bare)
2,675      LNFT 3.85 10,298.75 5.30 14,177.50 3.17 8,479.75    
730-02-I conduit with conductors (1" schedule 40 pvc, 2#8,
1#8 bare)
175      LNFT 3.00 525.00 4.40 770.00 4.16 728.00    
730-02-J conduit with conductors (1" rigid aluminum, 3#8) 515      LNFT 12.50 6,437.50 10.00 5,150.00 9.75 5,021.25    
730-02-K conduit with conductors (3/4" rigid aluminum, 3#10) 250      LNFT 12.10 3,025.00 8.40 2,100.00 7.45 1,862.50    
730-02-L conduit with conductors (3/4" liquid-tight flexible
metallic, 3#10)
125      LNFT 7.00 875.00 4.00 500.00 5.40 675.00    
730-04 jacking or bored casing (6" diameter, schedule 80 pvc) 800      LNFT 23.85 19,080.00 18.00 14,400.00 22.00 17,600.00    
730-05-A light pole (50 foot, aluminum, break. base, concr.
mowing apron w/junction box; one (1) internal
lowering device
9      EACH 7,180.00 64,620.00 10,600.00 95,400.00 4,914.67 44,232.03    
730-05-B light pole (40 foot, aluminum, break. base, concr.
mowing apron w/junction box, one (1) internal
lowering device
8      EACH 5,900.00 47,200.00 9,840.00 78,720.00 4,333.38 34,667.04    
730-06-A high mast pole (120 foot, steel, internal lowering
device)
2      EACH 38,200.00 76,400.00 34,000.00 68,000.00 40,695.00 81,390.00    
730-07-A luminaire (high mast, 1000w h.p.s., 480v, ies type ii,
medium, cutoff distribution)
16      EACH 625.00 10,000.00 770.00 12,320.00 654.57 10,473.12    
730-07-B luminaire (low mast, 400w hps, 480v, dbl. fuse ass.,
offset trunnion mount, ies type iii, long,
non-cutoff distribution)
9      EACH 595.00 5,355.00 585.00 5,265.00 615.56 5,540.04    
730-07-C luminaire (low mast, 250w hps, 480v, dbl. fuse ass.,
offset trunnion mount, ies type iv, long,
non-cutoff distribution)
8      EACH 500.00 4,000.00 580.00 4,640.00 529.50 4,236.00    
730-07-D luminaire (underpass, wallpack, 100w hps, 480v, double
fuse assembly, ies type iv, short, non-cutoff
distribution)
10      EACH 340.00 3,400.00 385.00 3,850.00 256.90 2,569.00    
730-08 electrical service point (pedestal) 1      EACH 9,330.00 9,330.00 7,500.00 7,500.00 8,010.00 8,010.00    
730-12-A removal and storage of light poles (40 foot, ground
mount, one (1) 6 foot truss arm, steel)
16      EACH 610.00 9,760.00 150.00 2,400.00 108.00 1,728.00    
730-12-B removal and storage of light poles (40 foot, ground
mount, tw0 (2) 6 foot truss arms, steel)
2      EACH 650.00 1,300.00 150.00 300.00 205.00 410.00    
730-12-C removal and storage of light poles (35 foot, structure
mount, one (1) 6 foot truss arm, steel)
2      EACH 610.00 1,220.00 250.00 500.00 205.00 410.00    
730-14 removal and disposal of luminaires (low mast, 250 watt,
480v, h.p.s.)
22      EACH 75.00 1,650.00 40.00 880.00 27.00 594.00    
730-16-A underground junction box (11" x 18") 6      EACH 450.00 2,700.00 400.00 2,400.00 308.67 1,852.02    
730-16-B underground junction box (13" x 24") 7      EACH 485.00 3,395.00 450.00 3,150.00 428.43 2,999.01    
730-17 structure junction box (8" x 8" x 4") 20      EACH 570.00 11,400.00 460.00 9,200.00 180.85 3,617.00    
740-01 construction layout lump      LUMP 880.00 880.00 5,500.00 5,500.00 1,355.00 1,355.00    
744-01 traffic control management lump      LUMP 8,980.00 8,980.00 2,000.00 2,000.00 3,500.00 3,500.00    
S-001 modular breakaway cable system (low mast) 17      EACH 1,215.00 20,655.00 975.00 16,575.00 276.06 4,693.02    
S-002 circuit breaker disconnect (underpass) 2      EACH 855.00 1,710.00 1,350.00 2,700.00 222.50 445.00    
                       
 CONTRACTOR TOTAL       382,025.50   405,352.50   IRREGULAR    