Lead Project: 451-07-0060
Parish: RICHLAND
Routes: I-20
Description: RAYVILLE - HOLLY RIDGE
Type Const: cold planing asphaltic pavement, asphlatic surface trmt, superpave asphaltic concrete
overlay, and related work.
 
RankLicenseBidderAmount
105789 D & J CONSTRUCTION CO., INC. $3,767,048.57
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $3,617,227.83
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
502-01 superpave asphaltic concrete 32,798.9    TON 56.50 1,853,137.85 54.00 1,771,140.60        
507-01-B asphaltic surface treatment (2 applications) 229,218      SQYD 2.15 492,818.70 2.44 559,291.92        
509-01 cold planing asphaltic pavement 298,164      SQYD 0.90 268,347.60 1.75 521,787.00        
509-02 contractor retained reclaimed asphaltic pavement - 8,298      CUYD 0.01 - 82.98 0.10 - 829.80        
713-01 temporary signs & barricades lump      LUMP 300,000.00 300,000.00 141,000.00 141,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
26.440  MILE 175.00 4,627.00 150.00 3,966.00        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
26.440  MILE 200.00 5,288.00 438.00 11,580.72        
713-05-A temporary pavement markings (solid line)(4" width) 52.880  MILE 1.00 52.88 935.00 49,442.80        
713-07 temporary reflectorized raised pavement markers 1,747      EACH 0.01 17.47 1.76 3,074.72        
716-01-A mulch (vegetative) 12.74   ACRE 650.00 8,281.00 800.00 10,192.00        
717-01 seeding 573      LB 4.00 2,292.00 4.70 2,693.10        
718-01 fertilizer 12,740      LB 0.33 4,204.20 0.39 4,968.60        
724-01-C pavement patching (8" minimum thickness) 2,667      SQYD 98.00 261,366.00 90.00 240,030.00        
727-01 mobilization lump      LUMP 370,000.00 370,000.00 85.00 85.00        
731-02 reflectorized raised pavement markers 2,099      EACH 7.15 15,007.85 6.11 12,824.89        
732-01-C plastic pavement striping (8" width) 2,450      LNFT 4.00 9,800.00 1.00 2,450.00        
732-01-E plastic pavement striping (24" width) 600      LNFT 5.50 3,300.00 3.45 2,070.00        
732-02-A plastic pavement striping (solid line) (4" width) 26.440  MILE 3,150.00 83,286.00 2,500.00 66,100.00        
732-03-A plastic pavement striping (broken line)(4" width) 13.220  MILE 1,250.00 16,525.00 900.00 11,898.00        
740-01 construction layout lump      LUMP 10,000.00 10,000.00 7,000.00 7,000.00        
744-01 traffic control management lump      LUMP 25,000.00 25,000.00 180,679.92 180,679.92        
S-001 rumble strips (ground-in) 26.3    MILE 600.00 15,780.00 600.00 15,780.00        
S-002 dynamic message sign unit 2      EACH 9,000.00 18,000.00 1.18 2.36        
                       
 CONTRACTOR TOTAL       3,767,048.57   3,617,227.83        