| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - UNITED RENTALS HWY TECHNOLOGIES INC |
- 2 - JACK B. HARPER CONTRACTOR, INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
977   |
LNFT |
4.00 |
3,908.00 |
4.00 |
3,908.00 |
|
|
|
|
| 202-02-01 |
removal of sign and support(s)
|
204   |
EACH |
200.00 |
40,800.00 |
351.00 |
71,604.00 |
|
|
|
|
| 202-02-02 |
removal of sign face(s)
|
575   |
EACH |
40.00 |
23,000.00 |
235.00 |
135,125.00 |
|
|
|
|
| 202-02-03 |
removal of sign supports
|
29   |
EACH |
200.00 |
5,800.00 |
205.00 |
5,945.00 |
|
|
|
|
| 202-02-04 |
removal of sign and u-channel post
|
208   |
EACH |
30.00 |
6,240.00 |
77.00 |
16,016.00 |
|
|
|
|
| 202-02-05 |
removal of sign support footing
|
69   |
EACH |
150.00 |
10,350.00 |
410.00 |
28,290.00 |
|
|
|
|
| 202-02-06 |
removal of overhead sign support
|
38   |
EACH |
7,000.00 |
266,000.00 |
3,510.00 |
133,380.00 |
|
|
|
|
| 202-02-07 |
removal of overhead sign support footings
|
19   |
EACH |
3,000.00 |
57,000.00 |
4,050.00 |
76,950.00 |
|
|
|
|
| 202-02-08 |
removal of overhead sign fascia mounting
|
14   |
EACH |
750.00 |
10,500.00 |
1,755.00 |
24,570.00 |
|
|
|
|
| 202-02-09 |
removal of chain link fence
|
2,030   |
lnft |
2.00 |
4,060.00 |
6.00 |
12,180.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
625   |
CUYD |
45.00 |
28,125.00 |
26.00 |
16,250.00 |
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
212.5 |
LNFT |
38.00 |
8,075.00 |
45.00 |
9,562.50 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
1,625.1 |
LNFT |
15.00 |
24,376.50 |
22.00 |
35,752.20 |
|
|
|
|
| 704-06 |
guard rail anchor sections (trailing end)
|
12.6 |
LNFT |
60.00 |
756.00 |
70.00 |
882.00 |
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
18.9 |
LNFT |
65.00 |
1,228.50 |
88.00 |
1,663.20 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
25.0 |
LNFT |
32.00 |
800.00 |
35.00 |
875.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
50.0 |
LNFT |
39.00 |
1,950.00 |
47.00 |
2,350.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
5   |
EACH |
1,600.00 |
8,000.00 |
2,115.00 |
10,575.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
2   |
EACH |
1,900.00 |
3,800.00 |
2,610.00 |
5,220.00 |
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
1,190.0 |
SQYD |
35.00 |
41,650.00 |
41.00 |
48,790.00 |
|
|
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
25.2 |
SQYD |
90.00 |
2,268.00 |
47.00 |
1,184.40 |
|
|
|
|
| 713-01 |
temporary signs and barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
130,000.00 |
130,000.00 |
130,000.00 |
130,000.00 |
|
|
|
|
| 729-01 |
sign (type a)
|
6,902.0 |
SQFT |
13.75 |
94,902.50 |
13.00 |
89,726.00 |
|
|
|
|
| 729-02 |
sign (type b)
|
317.9 |
SQFT |
15.00 |
4,768.50 |
13.00 |
4,132.70 |
|
|
|
|
| 729-04 |
sign (type d)
|
2,670.5 |
SQFT |
16.00 |
42,728.00 |
15.00 |
40,057.50 |
|
|
|
|
| 729-05 |
sign (type e)
|
1,518.0 |
SQFT |
17.00 |
25,806.00 |
18.00 |
27,324.00 |
|
|
|
|
| 729-06 |
sign (overhead mounted)
|
22,402.0 |
SQFT |
16.00 |
358,432.00 |
16.00 |
358,432.00 |
|
|
|
|
| 729-08-A |
mounting (2 1/2" post)
|
290   |
EACH |
450.00 |
130,500.00 |
468.00 |
135,720.00 |
|
|
|
|
| 729-08-B |
mounting (3 1/2" post)
|
96   |
EACH |
600.00 |
57,600.00 |
527.00 |
50,592.00 |
|
|
|
|
| 729-08-B-01 |
mounting (3 1/2" post)(structured post)
|
8   |
EACH |
250.00 |
2,000.00 |
468.00 |
3,744.00 |
|
|
|
|
| 729-08-E |
mounting (s3 x 5.7 post)
|
2   |
EACH |
525.00 |
1,050.00 |
585.00 |
1,170.00 |
|
|
|
|
| 729-08-F |
mounting (w6 x 12 post)
|
84   |
EACH |
600.00 |
50,400.00 |
702.00 |
58,968.00 |
|
|
|
|
| 729-08-F-01 |
mounting (w6 x 12 post) (structured mounted)
|
8   |
EACH |
750.00 |
6,000.00 |
644.00 |
5,152.00 |
|
|
|
|
| 729-08-G |
mounting (w8 x 18 post)
|
10   |
EACH |
825.00 |
8,250.00 |
760.00 |
7,600.00 |
|
|
|
|
| 729-08-G-01 |
mounting (w8 x 18 post) (structured mounted)
|
10   |
EACH |
900.00 |
9,000.00 |
702.00 |
7,020.00 |
|
|
|
|
| 729-09-A |
mounting (overhead truss) (ground mounted) (54' span)
|
1   |
EACH |
35,000.00 |
35,000.00 |
33,474.00 |
33,474.00 |
|
|
|
|
| 729-09-B |
mounting (overhead truss) (ground mounted) (60' span)
|
1   |
EACH |
42,500.00 |
42,500.00 |
31,590.00 |
31,590.00 |
|
|
|
|
| 729-09-C |
mounting (overhead truss) (ground mounted) (78' span)
|
2   |
EACH |
45,000.00 |
90,000.00 |
36,270.00 |
72,540.00 |
|
|
|
|
| 729-09-D |
mounting (overhead truss) (ground mounted) (96' span)
|
1   |
EACH |
47,500.00 |
47,500.00 |
42,120.00 |
42,120.00 |
|
|
|
|
| 729-09-E |
mounting (overhead truss) (ground mounted) (102' span)
|
2   |
EACH |
50,000.00 |
100,000.00 |
44,460.00 |
88,920.00 |
|
|
|
|
| 729-10-A |
mounting (overhead truss) (structure mounted (60'span)
|
6   |
EACH |
42,500.00 |
255,000.00 |
35,100.00 |
210,600.00 |
|
|
|
|
| 729-10-B |
mounting (overhead truss) (structure mounted (66'span)
|
3   |
EACH |
46,000.00 |
138,000.00 |
36,270.00 |
108,810.00 |
|
|
|
|
| 729-10-C |
mounting (overhead truss) (structure mounted (72'span)
|
5   |
EACH |
46,500.00 |
232,500.00 |
36,270.00 |
181,350.00 |
|
|
|
|
| 729-10-D |
mounting (overhead truss) (structure mounted (84'span)
|
2   |
EACH |
50,000.00 |
100,000.00 |
43,920.00 |
87,840.00 |
|
|
|
|
| 729-11 |
mounting (overhead cantilever) (ground mounted) (one
post) |
5   |
EACH |
17,500.00 |
87,500.00 |
23,400.00 |
117,000.00 |
|
|
|
|
| 729-12 |
mounting (overhead cantilever) (structure mounted)
(two post) |
11   |
EACH |
19,000.00 |
209,000.00 |
25,740.00 |
283,140.00 |
|
|
|
|
| 729-13 |
mounting (bridge fascia mounted)
|
22   |
EACH |
5,000.00 |
110,000.00 |
5,850.00 |
128,700.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
20   |
EACH |
65.00 |
1,300.00 |
99.00 |
1,980.00 |
|
|
|
|
| 729-17 |
milepost assembly (ground mounted)
|
6   |
EACH |
150.00 |
900.00 |
284.00 |
1,704.00 |
|
|
|
|
| 729-18 |
milepost assembly (structure mounted)
|
10   |
EACH |
150.00 |
1,500.00 |
204.00 |
2,040.00 |
|
|
|
|
| 729-18-A |
milepost assembly (structure mounted)(secondary)
|
95   |
EACH |
125.00 |
11,875.00 |
204.00 |
19,380.00 |
|
|
|
|
| 729-20 |
footings for overhead mountings (type a)
|
14   |
EACH |
12,500.00 |
175,000.00 |
21,060.00 |
294,840.00 |
|
|
|
|
| 729-20-A |
footings for overhead mountings (type b)
|
2   |
EACH |
11,500.00 |
23,000.00 |
21,645.00 |
43,290.00 |
|
|
|
|
| 729-21 |
u-channel post
|
18   |
EACH |
70.00 |
1,260.00 |
95.00 |
1,710.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
50,000.00 |
50,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
250,000.00 |
250,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| S-001 |
remove and remount sign
|
12   |
EACH |
200.00 |
2,400.00 |
2,340.00 |
28,080.00 |
|
|
|
|
| S-002 |
grout repair at sign support base
|
51   |
EACH |
150.00 |
7,650.00 |
468.00 |
23,868.00 |
|
|
|
|
| S-003 |
clean and repair damaged surface area on sign support
|
14   |
SQFT |
150.00 |
2,100.00 |
585.00 |
8,190.00 |
|
|
|
|
| S-004 |
remove and reinstall guard rail
|
150   |
LNFT |
12.00 |
1,800.00 |
59.00 |
8,850.00 |
|
|
|
|
| S-005 |
remove overhead sign lighting assembly
|
25   |
EACH |
200.00 |
5,000.00 |
2,925.00 |
73,125.00 |
|
|
|
|
| S-006 |
dynamic message sign unit
|
2   |
EACH |
25,000.00 |
50,000.00 |
21,060.00 |
42,120.00 |
|
|
|
|
| S-101 |
steel mounting bracket (for structure mounted oh truss
|
14   |
EACH |
33,000.00 |
462,000.00 |
35,100.00 |
491,400.00 |
|
|
|
|
| S-102 |
concrete mounting bracket (for structure mounted oh
truss) |
18   |
EACH |
24,000.00 |
432,000.00 |
21,060.00 |
379,080.00 |
|
|
|
|
| S-103 |
steel mounting bracket (for structure mounted oh
cantilever) |
3   |
EACH |
37,500.00 |
112,500.00 |
42,120.00 |
126,360.00 |
|
|
|
|
| S-104 |
concrete mounting bracket (for structure mounted oh
cantilever) |
8   |
EACH |
20,000.00 |
160,000.00 |
23,400.00 |
187,200.00 |
|
|
|
|
| S-105 |
sign support bracket (structure mounted) for type a
signs |
4   |
EACH |
900.00 |
3,600.00 |
1,755.00 |
7,020.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
4,771,009.00 |
|
4,937,031.50 |
|
|
|
|
|