Letting of 7/27/2005 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 339-03-0006
Parish: RICHLAND
Routes: LA 3048
Description: M.L. KING INTERSECTION - 2.229 MI. SOUTH
Type Const: lime treatment, cement treated base course, superpave acp, and related work.
 
RankLicenseBidderAmount
112487 DIAMOND B CONSTRUCTION CO., L.L.C. $630,223.12
205789 D & J CONSTRUCTION CO., INC. $662,282.14
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
D & J CONSTRUCTION CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 98      SQYD 54.00 5,292.00 12.00 1,176.00        
203-08 borrow (vehicular measurement) 138      CUYD 30.00 4,140.00 50.00 6,900.00        
203-08-A borrow (vehicular meas.)(selected soils) 706      CUYD 23.00 16,238.00 20.00 14,120.00        
304-01 lime 43.78   TON 165.75 7,256.53 125.00 5,472.50        
304-04-D lime treatment (type d) (12" thick) 5,556      SQYD 4.74 26,335.44 4.00 22,224.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
60      CUYD 65.00 3,900.00 90.00 5,400.00        
502-01 superpave asphaltic concrete 3,343.4    TON 55.00 183,887.00 59.00 197,260.60        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
266.3    TON 120.00 31,956.00 125.00 33,287.50        
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 45,000.00 45,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
2.229  MILE 155.00 345.49 225.00 501.52        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
1.799  MILE 300.00 539.70 400.00 719.60        
713-05-A temporary pavement markings (solid line)(4" width) 6.071  MILE 600.00 3,642.60 470.00 2,853.37        
716-01-A mulch (vegetative) 2.09   ACRE 1,000.00 2,090.00 100.00 209.00        
717-01 seeding 94      LB 11.00 1,034.00 10.00 940.00        
718-01 fertilizer 2,090      LB 0.47 982.30 0.40 836.00        
727-01 mobilization lump      LUMP 20,000.00 20,000.00 45,000.00 45,000.00        
731-02 reflectorized raised pavement markers 295      EACH 6.00 1,770.00 7.75 2,286.25        
732-02-A plastic pavement striping (solid line) (4" width) 6.071  MILE 2,200.00 13,356.20 2,700.00 16,391.70        
732-03-A plastic pavement striping (broken line)(4" width) 1.799  MILE 830.00 1,493.17 1,400.00 2,518.60        
735-01 mailboxes 13      EACH 15.00 195.00 1.00 13.00        
735-02 mailbox supports (single) 10      EACH 250.00 2,500.00 150.00 1,500.00        
735-04 mailbox supports (multiple) 1      EACH 800.00 800.00 215.00 215.00        
740-01 construction layout lump      LUMP 15,000.00 15,000.00 10,000.00 10,000.00        
744-01 traffic control management lump      LUMP 15,000.00 15,000.00 10,000.00 10,000.00        
S-001 cement treated base course (12 in depth) 31,661      SQYD 8.29 262,469.69 7.50 237,457.50        
                       
 CONTRACTOR TOTAL       630,223.12   662,282.14        