| Lead Project: 194-07-0059 |
| Parish: VERMILION |
| Routes: LA 82 |
| Description: DRAINAGE IMPROVEMENTS TO PERRY BRIDGE (CM) |
Type Const:
aggregate surface course, storm drain pipe, catch basins, combination conc. curb
& gutter, riprap, pavement patching, bedding material, hydro-seeding, cofferdams & related work |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BULLIARD CONSTRUCTION CO. INC. |
- 2 - H & S CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
200   |
CUYD |
72.39 |
14,478.00 |
50.00 |
10,000.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
50.0 |
CUYD |
72.39 |
3,619.50 |
75.00 |
3,750.00 |
|
|
|
|
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
40   |
LNFT |
77.22 |
3,088.80 |
66.00 |
2,640.00 |
|
|
|
|
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
427   |
LNFT |
99.28 |
42,392.56 |
90.00 |
38,430.00 |
|
|
|
|
| 701-03-M/N-01 |
storm drain pipe (36" pcp or 42" cmp)(outfall)
|
50   |
LNFT |
101.72 |
5,086.00 |
90.00 |
4,500.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
2   |
EACH |
4,965.18 |
9,930.36 |
2,800.00 |
5,600.00 |
|
|
|
|
| 702-03-B |
catch basins (cb-02)
|
1   |
EACH |
4,957.87 |
4,957.87 |
4,200.00 |
4,200.00 |
|
|
|
|
| 702-03-D |
catch basins (cb-07)
|
2   |
EACH |
8,979.10 |
17,958.20 |
3,000.00 |
6,000.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
30.0 |
LNFT |
31.02 |
930.60 |
50.00 |
1,500.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb,
|
15   |
SQYD |
98.30 |
1,474.50 |
100.00 |
1,500.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
4,840.33 |
4,840.33 |
12,000.00 |
12,000.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
50   |
SQYD |
119.95 |
5,997.50 |
100.00 |
5,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
30.0 |
CUYD |
125.69 |
3,770.70 |
100.00 |
3,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
9,744.00 |
9,744.00 |
17,000.00 |
17,000.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
0.08 |
ACRE |
12,180.00 |
974.40 |
20,000.00 |
1,600.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,005.42 |
3,005.42 |
10,000.00 |
10,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
3,580.92 |
3,580.92 |
5,000.00 |
5,000.00 |
|
|
|
|
| 802-05 |
cofferdams
|
lump |
LUMP |
6,046.15 |
6,046.15 |
12,000.00 |
12,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
141,875.81 |
|
143,720.00 |
|
|
|
|
|