Letting of 7/27/2005 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 194-07-0059
Parish: VERMILION
Routes: LA 82
Description: DRAINAGE IMPROVEMENTS TO PERRY BRIDGE (CM)
Type Const: aggregate surface course, storm drain pipe, catch basins, combination conc. curb
& gutter, riprap, pavement patching, bedding material, hydro-seeding, cofferdams & related work
 
RankLicenseBidderAmount
118943 BULLIARD CONSTRUCTION CO. INC. $141,875.81
204089 H & S CONSTRUCTION CO., INC. $143,720.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
BULLIARD CONSTRUCTION CO. INC.
- 2 -
H & S CONSTRUCTION CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
401-02 aggregate surface course (adjusted vehicular
measurement)
200      CUYD 72.39 14,478.00 50.00 10,000.00        
402-01 traffic maintenance aggregate (vehicular measurement) 50.0    CUYD 72.39 3,619.50 75.00 3,750.00        
701-03-K storm drain pipe (30" rcp/pcp) 40      LNFT 77.22 3,088.80 66.00 2,640.00        
701-03-M storm drain pipe (36" rcp/pcp) 427      LNFT 99.28 42,392.56 90.00 38,430.00        
701-03-M/N-01 storm drain pipe (36" pcp or 42" cmp)(outfall) 50      LNFT 101.72 5,086.00 90.00 4,500.00        
702-03-A catch basins (cb-01) 2      EACH 4,965.18 9,930.36 2,800.00 5,600.00        
702-03-B catch basins (cb-02) 1      EACH 4,957.87 4,957.87 4,200.00 4,200.00        
702-03-D catch basins (cb-07) 2      EACH 8,979.10 17,958.20 3,000.00 6,000.00        
707-03 combination concrete curb & gutter 30.0    LNFT 31.02 930.60 50.00 1,500.00        
711-01-C riprap (30 lb, 15      SQYD 98.30 1,474.50 100.00 1,500.00        
713-01 temporary signs & barricades lump      LUMP 4,840.33 4,840.33 12,000.00 12,000.00        
724-01-B pavement patching (12" minimum thickness) 50      SQYD 119.95 5,997.50 100.00 5,000.00        
726-01 bedding material 30.0    CUYD 125.69 3,770.70 100.00 3,000.00        
727-01 mobilization lump      LUMP 9,744.00 9,744.00 17,000.00 17,000.00        
739-01 hydro-seeding 0.08   ACRE 12,180.00 974.40 20,000.00 1,600.00        
740-01 construction layout lump      LUMP 3,005.42 3,005.42 10,000.00 10,000.00        
744-01 traffic control management lump      LUMP 3,580.92 3,580.92 5,000.00 5,000.00        
802-05 cofferdams lump      LUMP 6,046.15 6,046.15 12,000.00 12,000.00        
                       
 CONTRACTOR TOTAL       141,875.81   143,720.00        