| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
78,000.00 |
78,000.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
0.01 |
0.01 |
15,000.00 |
15,000.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
416   |
LNFT |
10.00 |
4,160.00 |
5.00 |
2,080.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
4,992   |
CUYD |
11.00 |
54,912.00 |
13.00 |
64,896.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,429   |
CUYD |
32.00 |
77,728.00 |
43.00 |
104,447.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
12,579.9 |
TON |
55.00 |
691,894.50 |
55.00 |
691,894.50 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
miscellaneous |
727.1 |
TON |
100.00 |
72,710.00 |
100.00 |
72,710.00 |
|
|
|
|
| 507-01-B |
asphaltic surface treatment (2 applications)
|
21,636   |
SQYD |
2.30 |
49,762.80 |
2.80 |
60,580.80 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
74,534   |
SQYD |
0.50 |
37,267.00 |
0.82 |
61,117.88 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,031   |
CUYD |
0.01 |
- 10.31 |
0.10 |
- 103.10 |
|
|
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
48   |
LNFT |
150.00 |
7,200.00 |
92.00 |
4,416.00 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
68   |
LNFT |
175.00 |
11,900.00 |
103.00 |
7,004.00 |
|
|
|
|
| 701-15 |
concrete collar
|
10   |
EACH |
600.00 |
6,000.00 |
850.00 |
8,500.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
250.0 |
LNFT |
17.50 |
4,375.00 |
20.00 |
5,000.00 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
50.0 |
LNFT |
35.00 |
1,750.00 |
44.00 |
2,200.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
50.00 |
5,000.00 |
52.00 |
5,200.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,150.00 |
8,600.00 |
2,200.00 |
8,800.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
85,000.00 |
85,000.00 |
NO BID |
NO BID |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
17.526 |
MILE |
160.00 |
2,804.16 |
152.00 |
2,663.95 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
13.485 |
MILE |
1.00 |
13.48 |
365.00 |
4,922.02 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
48.870 |
MILE |
1.00 |
48.87 |
608.00 |
29,712.96 |
|
|
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
85   |
EACH |
0.01 |
0.85 |
1.82 |
154.70 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
9.04 |
ACRE |
650.00 |
5,876.00 |
800.00 |
7,232.00 |
|
|
|
|
| 717-01 |
seeding
|
407   |
LB |
4.00 |
1,628.00 |
5.00 |
2,035.00 |
|
|
|
|
| 718-01 |
fertilizer
|
9,040   |
LB |
0.38 |
3,435.20 |
0.46 |
4,158.40 |
|
|
|
|
| 724-01-C |
pavement patching (18" minimum thickness)
|
300   |
SQYD |
100.00 |
30,000.00 |
110.00 |
33,000.00 |
|
|
|
|
| 724-02 |
pavement widening
|
3,474.8 |
SQYD |
33.00 |
114,668.40 |
50.00 |
173,740.00 |
|
|
|
|
| 726-01 |
bedding material
|
80.6 |
CUYD |
75.00 |
6,045.00 |
60.00 |
4,836.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
97,000.00 |
97,000.00 |
NO BID |
NO BID |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
70.00 |
280.00 |
85.00 |
340.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
772   |
EACH |
8.50 |
6,562.00 |
6.00 |
4,632.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
16.290 |
MILE |
3,000.00 |
48,870.00 |
2,250.00 |
36,652.50 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.495 |
MILE |
1,250.00 |
5,618.75 |
850.00 |
3,820.75 |
|
|
|
|
| 735-01 |
mailboxes
|
8   |
EACH |
1.00 |
8.00 |
15.00 |
120.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
8   |
EACH |
195.00 |
1,560.00 |
250.00 |
2,000.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
13,500.00 |
13,500.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
12,000.00 |
12,000.00 |
17,000.00 |
17,000.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
26.68 |
CUYD |
1,000.00 |
26,680.00 |
730.00 |
19,476.40 |
|
|
|
|
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
24.0 |
LNFT |
800.00 |
19,200.00 |
300.00 |
7,200.00 |
|
|
|
|
| 805-12-I |
reinforced concrete box culverts (5'x 5')
|
24.0 |
LNFT |
900.00 |
21,600.00 |
365.00 |
8,760.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
1,843   |
LB |
1.75 |
3,225.25 |
2.50 |
4,607.50 |
|
|
|
|
| S-001 |
cleaning existing ditches
|
700   |
LNFT |
12.00 |
8,400.00 |
6.00 |
4,200.00 |
|
|
|
|
| S-002 |
milling concrete approach slabs
|
107   |
SQYD |
85.00 |
9,095.00 |
106.00 |
11,342.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,635,867.96 |
|
IRREGULAR |
|
|
|
|
|