| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
297   |
CUYD |
10.00 |
2,970.00 |
14.00 |
4,158.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
3,395.5 |
TON |
56.00 |
190,148.00 |
60.00 |
203,730.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
300.0 |
TON |
56.00 |
16,800.00 |
80.00 |
24,000.00 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
2,703   |
LNFT |
1.50 |
4,054.50 |
1.20 |
3,243.60 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
3,244   |
LNFT |
1.50 |
4,866.00 |
1.50 |
4,866.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
60,000.00 |
60,000.00 |
90,000.00 |
90,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
2.280 |
MILE |
135.00 |
307.80 |
400.00 |
912.00 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.420 |
MILE |
10.00 |
34.20 |
300.00 |
1,026.00 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
6.840 |
MILE |
10.00 |
68.40 |
700.00 |
4,788.00 |
|
|
|
|
| 724-01 |
pavement patching
|
2,500   |
SQYD |
40.00 |
100,000.00 |
70.00 |
175,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
90,000.00 |
90,000.00 |
62,000.00 |
62,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
150   |
EACH |
6.00 |
900.00 |
6.00 |
900.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.280 |
MILE |
3,500.00 |
7,980.00 |
3,000.00 |
6,840.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.140 |
MILE |
1,000.00 |
1,140.00 |
1,000.00 |
1,140.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
15,000.00 |
15,000.00 |
6,000.00 |
6,000.00 |
|
|
|
|
| S-001 |
sawcuts in asphaltic concrete lifts
|
11,354   |
LNFT |
0.50 |
5,677.00 |
0.70 |
7,947.80 |
|
|
|
|
| S-002 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
3,244   |
LNFT |
1.70 |
5,514.80 |
1.20 |
3,892.80 |
|
|
|
|
| S-003 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
8,110   |
LNFT |
1.70 |
13,787.00 |
1.10 |
8,921.00 |
|
|
|
|
| S-004 |
surface preparation
|
lump |
LUMP |
15,000.00 |
15,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| S-005 |
rumble strips (ground-in)
|
2.3 |
MILE |
2,400.00 |
5,520.00 |
3,000.00 |
6,900.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
559,767.70 |
|
634,265.20 |
|
|
|
|
|