| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - COVINGTON PAVING CO. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
1,190   |
LNFT |
5.00 |
5,950.00 |
4.10 |
4,879.00 |
3.00 |
3,570.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
200   |
CUYD |
13.60 |
2,720.00 |
23.00 |
4,600.00 |
12.00 |
2,400.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
3,617   |
CUYD |
6.29 |
22,750.93 |
23.00 |
83,191.00 |
20.00 |
72,340.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
21,051.7 |
TON |
52.00 |
1,094,688.40 |
51.00 |
1,073,636.70 |
54.20 |
1,141,002.14 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
miscellaneous |
1,733.0 |
TON |
10.00 |
17,330.00 |
60.00 |
103,980.00 |
60.00 |
103,980.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
156,448   |
SQYD |
1.00 |
156,448.00 |
1.00 |
156,448.00 |
1.06 |
165,834.88 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
440.0 |
LNFT |
37.00 |
16,280.00 |
36.00 |
15,840.00 |
35.00 |
15,400.00 |
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
112.5 |
LNFT |
32.00 |
3,600.00 |
31.00 |
3,487.50 |
30.00 |
3,375.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
20   |
EACH |
2,000.00 |
40,000.00 |
1,900.00 |
38,000.00 |
1,850.00 |
37,000.00 |
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
12.0 |
SQYD |
120.00 |
1,440.00 |
52.00 |
624.00 |
FREE |
FREE |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
30,000.00 |
30,000.00 |
12,000.00 |
12,000.00 |
50,000.00 |
50,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
22.520 |
MILE |
140.00 |
3,152.80 |
129.00 |
2,905.08 |
503.00 |
11,327.56 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
18.700 |
MILE |
10.00 |
187.00 |
300.00 |
5,610.00 |
235.00 |
4,394.50 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
63.960 |
MILE |
20.00 |
1,279.20 |
1.00 |
63.96 |
565.00 |
36,137.40 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
300   |
SQYD |
65.00 |
19,500.00 |
73.00 |
21,900.00 |
43.56 |
13,068.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
108,000.00 |
108,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
20   |
EACH |
75.00 |
1,500.00 |
72.00 |
1,440.00 |
70.00 |
1,400.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,486   |
EACH |
5.00 |
7,430.00 |
5.00 |
7,430.00 |
4.40 |
6,538.40 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
31.980 |
MILE |
1,800.00 |
57,564.00 |
1,900.00 |
60,762.00 |
1,784.00 |
57,052.32 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
9.350 |
MILE |
650.00 |
6,077.50 |
718.00 |
6,713.30 |
622.00 |
5,815.70 |
|
|
| 735-01 |
mailboxes
|
70   |
EACH |
2.00 |
140.00 |
12.00 |
840.00 |
10.00 |
700.00 |
|
|
| 735-02 |
mailbox supports (single)
|
70   |
EACH |
125.00 |
8,750.00 |
150.00 |
10,500.00 |
125.00 |
8,750.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
40,000.00 |
40,000.00 |
31,000.00 |
31,000.00 |
16,000.00 |
16,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
65,000.00 |
65,000.00 |
40,000.00 |
40,000.00 |
27,000.00 |
27,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,709,787.83 |
|
1,735,850.54 |
|
1,833,085.90 |
|
|
|